Forwards IE Insp Repts 50-438/82-14 & 50-439/82-14 on 820511-14 & Notice of Violation
ML20058H518
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 06/16/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20058H491 List:
References
NUDOCS 8208030605
Download: ML20058H518 (2)


See also: IR 05000438/1982014

Text

, ,

=.. .

. .

JUN 16 1982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report No60-438/82Tand 50-439/82-14

This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this

office on May 11-14, 1982, of activit.'es authorized by NRC Construction Permit

Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our preliminary findings

were discussed with Mr. W. R. Dahnke Project Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are _ discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A. Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be plact.J in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8208030605 820726

PDR ADOCK 05000438

G PDR

.

~

., .

,

. .

F

Tennessee Valley Authority 2

JUN 18 1982

,

Should you have any questions concerning this letter, we will be glad to discuss ,

them with you. ,

Sincerely, ,

f f..

F. J. Long, Acting Chief '~

Reactor Projects Branch 1

Division of Project and

,. .

Resident Programs

Enclosuresi ,

1. Appendix A. Notice of Violation

2. Inspection Report Nos. 50-438/82-14 '

and 50-439/82-14

-

cc w/ encl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager <

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear  ;

Licensing Section ~

H. N. Culver, Chief, Nuclear Safety

Review Staff ,

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

'

,

a

~

RII RII- -

RI RI

RJ

, ABRA w onion ARHer t Rr njak FL

06/IS/82 06/ /82 06/ /82 06/} 82-

06f /82

"

"

.

,

r ?

, . -

.

1