Forwards IE Insp Repts 50-438/82-19 & 50-439/82-19 on 820601-30.No Noncompliance Noted
ML20062J130
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/23/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Parris H
Tennessee Valley Authority
Shared Package
ML20062J133 List:
References
NUDOCS 8208160271
Download: ML20062J130 (2)


See also: IR 05000438/1982019

Text

, . _. - - _ . __ - _ _ _ . _ _ . - - _ - . _ ._- _

'

.- ,

g

i

JUL 2 31982

!

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

'

500A Chestnut Street Tower II

I

Chattanooga, TN 37401

'

Gentlemen:

!

'

Subject: Report Nos. Q /8'2 % and 50-439/82-19 ,

'

This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.

'

of this office on June 1-30, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte. facility and to the  ;

. discussion of our findings held with Mr. W. R. Dahnke, Project Manager, at the -

l conclusion of the inspection. I

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

i

,

-

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed ,

, inspection report.

1 .

Three new unresolved items resulted from this inspection and are discussed in the l

enclosed report. These items will be examined during subsequent inspections.

.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

i 10CFR2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

i

David M. Verrelli, Chief

Reactor Project Branch 1

Division of Project and

,

Resident Programs

Enclosure: (See Page 2)

-

8208160271 820723

PDR ADOCK 05000438

C PDR _

gg

"

.- ,

Tennessee Valley Authority 2 JUL 2 31932

Enclosure:

Inspection Report Nos. 50-438/82-19

and 50-439/82-19

c t, w/er.cl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NP,C Resident Inspector

Document Management Branch

State of Alabama

l

'

}

J Wilcox:drt RCrlenjak cl DVerelli