ML20062J130
| ML20062J130 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 07/23/1982 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Parris H Tennessee Valley Authority |
| Shared Package | |
| ML20062J133 | List: |
| References | |
| NUDOCS 8208160271 | |
| Download: ML20062J130 (2) | |
See also: IR 05000438/1982019
Text
, .
_.
- - _ .
__ - _ _
_ . _ _ . - -
_ - . _
._- _
'
.-
,
g
i
JUL 2 31982
!
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
'
500A Chestnut Street Tower II
I
Chattanooga, TN 37401
'
Gentlemen:
!
'
Subject: Report Nos. Q /8'2 % and 50-439/82-19
,
This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.
'
of this office on June 1-30, 1982, of activities authorized by NRC Construction
'
Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte. facility and to the
.
discussion of our findings held with Mr. W. R. Dahnke, Project Manager, at the
-
l
conclusion of the inspection.
I
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
i
,
We have examined actions you have taken with regard to previously reported
-
unresolved items. The status of these items is discussed in the enclosed
,
inspection report.
,
1
.
Three new unresolved items resulted from this inspection and are discussed in the
l
enclosed report. These items will be examined during subsequent inspections.
.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
i
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
i
David M. Verrelli, Chief
Reactor Project Branch 1
,
Division of Project and
Resident Programs
Enclosure:
(See Page 2)
-
8208160271 820723
PDR ADOCK 05000438
C
_
gg
"
.-
,
Tennessee Valley Authority
2
JUL 2 31932
Enclosure:
Inspection Report Nos. 50-438/82-19
and 50-439/82-19
c t, w/er.cl:
H. J. Green, Director of Nuclear Power
A. M. Qualls, Plant Superintendent
W. R. Dahnke, Project Manager
D. L. Terrill, Project Engineer
J. F. Cox, Supervisor, Nuclear
Licensing Section
H. N. Culver, Chief, Nuclear Safety
Review Staff
bcc w/ encl:
NP,C Resident Inspector
Document Management Branch
State of Alabama
l
'
}
J Wilcox:drt
RCrlenjak
cl
DVerelli
7/zs/82
7/h 82
7
82
//21/82