Forwards IE Insp Repts 50-438/82-12 & 50-439/82-12 on 820401-30 & Notice of Violation
ML20062H937
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 05/21/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20062H902 List:
References
NUDOCS 8208160216
Download: ML20062H937 (2)


See also: IR 05000438/1982012

Text

_--

--

- _ ------------- - -- --- - - - - - - -

- - - - - - -

- - - - - -

- - - - - - - - -

,Ve/lW

'

.-

,

.

.

MAY 211982

Tennessee Valley Authority

ATTN: fir. H. G. Parris

!!anager of Power

500A Chestnut Street Tower Il

Chattanooga, TN 37401

Gentlemen:

Subject:

Report Nos.6-438/82Dayd 50-439/82-12

This refers to the routine safety inspection conducted by fir. J. D. Wilcox, Jr.

of this office on April 1-30, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility.

Our preliminary

findings were discussed with Mr. W. R. Dahnke, Project flanager, at the conclu-

sion of the inspection.

'

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

T

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

,

Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

Three new unresolved items are identified in the enclosed inspection report.

l

l

These items will be examined during subsequent inspections.

l

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold infomation contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

i

2.790(b)(1).

~

!

r

8208160216 820809

PDR ADOCK 05000438

,

'

G

PDR

L_

-

- - -

-

. .

-__ _ ______- ___ . _ _ _ _ _ _ - _ _ _ _

. _ . _ _ _ _ _ __

. _ _ _ _ _ _ . _ ._

_

- - _ _ _ _ _ _ _ _ _ -

,_

-

. .,

',-

,

-

.

.

.,

i

Tennessee Valley Authority

2

0

.-

Should yot have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

\\

F. J. Long, Acting Chief

.

Reactor Project, Branch 1

Division of Project and

Resident Programs

e

,

,

Enclosures:

1.

Appendix A, Notice of Violation

_

2.

Inspection Report Nos. 50-438/82-12

and 50-439/82-12

cc w/encis:

.

H. J. Green, Director of Nuclear Power

A. H. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

4.

J. F. Cox, Supervisor, Nuclear

~"

Licensing Section

,

H. N. Culver, Chief, Nuclear Safety

.

Review Staff

-

bcc w/encls:

-

NRC Resident Inspector

'

Document 11anagement Branch

State of Alabama

-

,

7

l

,

e

-

l

.

1

l

'

RI

RI

RII

Jt' 11cox:gr

R1 rienjak

DR ui k

FJLong

5$/82

5/t[/82

5/yf/82

f//y/82

L.