IR 05000266/1996007

From kanterella
Revision as of 23:41, 9 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/96-07 & 50-301/96-07 on 961106
ML20133J409
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/14/1997
From: Mccormickbarge
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9701210006
Download: ML20133J409 (1)


Text

q January 14, 1997 Mr. S. A. Patulski, Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT N0. 50-266/301/96007(DRP))

Dear Mr. Patulski:

This will acknowledge receipt of your letter dated December 6,1996, in response to our letter dated November 6,1996, transmitting a Notice of Violation associated with Inspection Report No. 50-266/301/96007(DRP). We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.

Sincerely, James W. McCormick-Barger, Team Leader Point Beach Oversight Team Docket No. 50-266 Docket No. 50-301 l

cc: R. R. Grigg, President and Chief Operating Officer, WEPC0 ( A. J. Cayia, Plant Manager Virgil Kanable, Chief, L Boiler Section Cheryl L. Parrino, Chairman Wisconsin Public Service Commission State Liaison Officer

,

Docket File SRI Point Beach PUBLIt IE-01 OC/LFDCB _

A. B. beach B. L. Burgess ) ()

W. L. Axelson PM, NRR i DRP 170Q86 v . . ,.,ini. - i. iwi 4. 6. . c c.,,.iin . .it mi i c - c.,,. -e -

g 7 4 .it..nf i 0FFICE RIII WM M NAME JMCB>b)il,do,

DATE 0FFICIAL RECORD COPY 9701210006 970114 PDR ADOCK 05000266 G PDR