PNO-II-97-006A:on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions
ML20134B631
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/30/1997
From: Robert Carrion
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-97-006A, PNO-II-97-6A, NUDOCS 9701300248
Download: ML20134B631 (1)


- . . -- -.- . . . - _ - . _ . . . - . - ..- - , . -_ _ --

! v January 30, 1997 PRELmm_Y NOTIFICATION OF avasu OR unuw=1 OCCUMmCE PNO-II 0 0 6A l Thic preliminary notification constitutes EARLY notice of events of POSSIBLE l cofoty or public interest significance. The information is as initially l rocsived without verification or evaluation, and is basically all that is known by Region II staff in Atlanta, Georgia on this date.

Facility Licensee Emeraency Classification l Giorgia Power Co. Notification of Unusual Event

! Hntch 1 Alert l Bcxlcy, Georgia Site Area Emergency l Docksts: 50-321 General Emergency X Not Applicable Subjsct: PLANT SHUTDOWN DUE TO PRIMARY PRESSURE BOUNDARY LEAKAGE - UPDATE l

This is an update to the PN issued on January 29, 1997, which reported 1

j the plant shutdown due to primary system pressure boundary leakage. The '

licensee has completed weld repairs to the three-quarter inch vent line cnd the line has been returned to service. The licensee terminated the Notification of Unusual Event at 7
25 a.m. on January 30. The licensee is continuing to cold shutdown conditions to perform additional corrsetive maintenance activities. They are scheduled to return to power operations approximately 12:00 noon on February 1, 1997.

The licensee reported that a local radio station expressed interest but tha licensee still does not plan to issue a press release. 1 The resident inspectors have been monitoring the licensee's repair actions and plant status control during the repair and root cause annlysis. '

Tha State of Georgia has been notified.

This information is current as of 1:00 p.m. on January 30, 1997.

Contact:

R. CARRION (404)331-0345 l

I 9701300248 970130 PDR I&E PNO-II-97-006A PDR \ \\