ML20137D190

From kanterella
Revision as of 21:46, 13 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to FOIA Request for 33 Records Re GE Facility.App a & Portions of App D Documents Available in Pdr.Attachments to App C Documents & Portions of App D Documents Withheld (Ref FOIA Exemption 4)
ML20137D190
Person / Time
Site: 07001113
Issue date: 11/19/1985
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Ratner M
RATNER, M.G.
Shared Package
ML20137D194 List:
References
FOIA-85-554 NUDOCS 8511270021
Download: ML20137D190 (7)


Text

.

PD M b

    1. 'o UNITED STATES

.8"

~

'l . NUCLEAR REGULATORY COMMISSION

y WASHINGTON, D. C. 20555

\ . . . . . p# l l

80V 191995 Mozart G. Ratner, Escuire 1900 M Street, NW Suite 610 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-554

Dear Mr. Ratner:

This is in response to your letter dated August 2,1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of 33 specified records regarding the General Electric facility in Wilmington, North Carolina.

The documents listed on the enclosed Appendix A and portions of the records listed on the enclosed Appendix D are being placed in the Nuclear Regulatory Comission's (NP,C) Public Document Room (PDR),1717 H Street, NW, Washington, DC 20555. You may obtain access to these records by presenting a copy of this letter to the PDR staff or by requesting PDR folder F01A-85-554 under your name. The enclosed Appendix B lists additional records pertaining to your request which are being addressed in response to a previous F0IA request submitted by you (F01A-85-158), could not be located, or do not exist, as indicated on the appendix.

The attachments to the records listed on Appendix C and the deleted portions of the records listed on Appendix D contain information which identifies procedures for safeguarding licensed special nuclear material at the licensed facility. This information is considered comercial or financial (proprietary) information pursuant to 10 CFR 2.790(d) and is being withheld from public disclosure pursuant to Exemption (4) of the F0IA (5 ll.S.C. 552(b)(4)) and 10 CFR 9.5(a)(4) of the Commission's regulations.

Pursuant to 10 CFR 9.9 of the NRC's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. John G. Davis, Director, Office of Nuclear Material Safety and Safeguards.

8511270021 851119 PDR FOIA RATNER 85-554 PDR l

L J

This denial may be appealed to the NRC's Executive Director for Operations within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

This completes action on your request.

Sincerely, ,

g:yk $ **

Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated

+

4

?

Re: F01A-85-554 APPENDIX A RECORDS BEING PLACED IN PDR NOTE: The number in parenthesis following the description of the document corresponds to the number of the document in the FOIA request.  ;

i

1. 07/16/85 Letter from Vaughan to Stohr, re: Inspection Report l 70-1113/85-02 (4) (19 pages)  !
2. 11/02/84 Letter from Vaughan to Goode, subject: Testing for Unescorted Entry Authorization (11) (3 pages)
3. ~02/15/84 Letter from V4ughan to Stohr, subject: Inspection Report 70-1113/84-14(20) (1 page) 4.A. 06/10/83 Inspection Report 70-1113/83-12 (22) (12 pages)
8. 09/26/85 Inspection Report 70-1113/83-24 (22) (9 pages)

- 5. 06/30/83 Letter from Vaughan to Stohr, re: Inspection Report 70-1113/83-12(23) (6 pages) i 4

f s

,w -- --- - t -


P-r~

Re: F01A-85-554 APPENDIX B NOTE: The documents are numbered to correspond to the number of the document in the F0IA request

10. Being addressed in response to F0IA-85-158
11. See Appendix A. The document provided is a letter from Vaughan to Goode, not from Vaughan to Stohr as listed in the request. Based on the subject and date of the letter, we believe the letter provided is the letter requested.

.s 12. The document provided is a letter from Vaughan to O'Reilly, not from Lees to Barr as identified in your request. Based on the subject and date of this letter, we believe the letter provided is probably the letter requested. This letter is being addressed in response to F01A-85-158.

13. Being addressed in response to F01A-85-158.
14. The NRC staff was unable to locate this document. A reference to an inspection report number will be needed to locate this document.
15. Being addressed in response to F01A-85-158.
18. Being addressed in response to F01A-85-158.
20. See Appendix A. This letter does not have an attachment as indicated in the request.

s

)

Re: F0lA-85-554 APPENDIX C DENIED RECORDS - EXEMPTION 4 (2.790(d))

NOTE: The number in parenthesis following the description of the document corresponds to the number of the document in the F0IA request.

1. ATTACHMENT TO THE: 01/10/85 Letter from Vaughan to O'Reilly, re:

Fundamental Nuclear Material Control Plan Revision.

(1)

2. ATTACHMENT TO THE: 01/30/85 Letter from Vaughan to Brown, re:

Fundamental Nuclear Material Control Plan Revisions.

(2)

3. ATTACHMENT TO THE: 04/01/85 Letter from Vaughan to Grace, re:

Fundamental Nuclear Material Control Plan Revisions.

(5)

4. ATTACHMENT TO THE: 02/27/85 Letter from Vaughan to Grace, re:

Fundamental Nuclear Material Control Plan Revisions.

(6)

5. ATTACHMENT TO THE: 05/10/85 Letter from Vaughan to Brown, re:

Fundamental Nuclear Material Control Plan Revisions.

(8)

6. ATTACHMENT TO THE: 04/05/85 Letter from Vaughan to Brown, re:

Fundamantal Nuclear Material Control Plan Revisions.

(9) -

7. ATTACHMENT TO THE: 08/10/85 Letter from Stohr to Long, re: GE's 2/14/84 and 3/21/84 FNMCP submittals. (16)

NOTE: Re: Item 17 - We have no record of " Letters, Long to Stohr, enclosing revisions (2/14/84 and 3/21/84)." These letters appear to have been requested because they were referenced in item 16 above. Item 16 is in response to the following submittals:

8. ATTACHMENT TO THE: 02/14/84 Letter from Vaughan to O'Reilly, re:

Revisions to Fundamental Nuclear Material Control Plan. The 2/14/84 letter is already in the PDR No. 8404110188.

9. ATTACHMENT TO THE: 03/21/84 Letter from Vaughan to O'Reilly, re:

Revisions to Fundamental Nuclear Material Control Plan. The 3/21/84 letter is already in the PDR No. 8405250379.

m.

Re: F01A-85-554 APPENDIX D PORTIONS OF RECORDS DELETED EXEMPTION 4 (2.790(d)

1. 07/08/83 Ltr from Stohr to Long, subject: Report No. 70-1113/83-17, w/ enclosures: (11 pages)
a. Appendix A, Notice of Violation,
b. Inspection Report No. 113/82-17
c. Inspection Summary
2. 08/11/83 Ltr from Stohr to Long, subject: Report No. 70-113/83-20, w/ enclosure (8 pages) i
a. Inspection Report No. 70-113/83-20
3. 08/16/83 Ltr from Stohr to Long, subject: Report No. 70-113/83-21, w/ enclosures: (7 pages)
a. Appendix A, Notice of Violation
b. Inspection Report No. 70-113/83-21
c. Inspection Summary
4. 08/30/83 Ltr from Stohr to long, subject: Report No. 70-113/83-22, w/ enclosure: (7 pages)
a. Inspection Report No. 70-113/83-22
5. 10/05/83 Ltr from Stohr to Long, subject: Report No. 70-113/83-23, w/ enclosures: (5 pages)
a. Inspection Report No. 70-113/83-23
b. Inspection Summary
6. 10/05/83 Ltr from Stohr to Long, subject: Report No. 70-113/83-27, w/ enclosures: (7 pages)
a. Inspection Report No. 70-113/83-27
b. Inspection Summary a

J l

l l

Re: F0IA-85-554 l

APPENDIX D l (Continued)

7. 11/28/83 Ltr from Stohr to Long, subject: Report No. 70-113/83-30, w/ enclosures: (6 pages)
a. Inspection Report No. 70-113/83-30
b. Inspection Summary
8. 11/30/83 Ltr from Stohr to Long, subject: Report No. 70-113/83-29, w/ enclosures: (12 pages)
a. Inspection Report No. 70-113/83-29
b. Inspection Summary
9. 03/02/84 Ltr from Stohr to Long, subject: Report No. 70-113/84-02, w/ enclosure: (8 pages)
a. Inspection Report No. 70-It3/84-02

. 10. 11/15/84 Ltr from Vaughan to O'Reilly, re: 1) NRC License SNM-1097, Docket 70-113,2) NRC Inspection Report 70-113/84-11 dated 10/18/84, w/ attachment (5 pages)

11. 11/20/84 Ltr from Vaughan to Stohr, re: 1) NRC License SMM-1097, Docket 70-113 2) NRC Inspection Report 70-113/84-12 dated 10/22/84, w/ attachment (29 pages)
12. 02/06/85 Attachment #19 (2 pages)
13. 03/08/85 Ltr from Vaughan to Stohr, re: 1) NRC License SNM-1097, Docket 70-113 2) NRC Inspection Report 70-113/84-14 dated 11/06/84,
3) Ltr, Vaughan to Stohr, 12/3/84 4) Ltr Stohr to Lees, 2/1/85,
5) Ltr Vaughan to O'Reilly, 2/6/85 6) Ltr Vaughan to Stohr 2/15/85 (6 pages)

J

%