Sanitized Safeguards Insp Rept 70-1113/83-27 on 830913-16.No Violations Noted.Major Areas Inspected:Mc 85206B Measurement & Statistical Control & Followup on Previous Insp Findings. Measurement Data Table Encl
ML20137D679
Person / Time
Site: 07001113
Issue date: 10/05/1983
From: Mcalpine E, Sabados J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20137D194 List:
References
FOIA-85-554 70-1113-83-27, 70-1113-83-27-0, NUDOCS 8511270125
Download: ML20137D679 (5)


Text

ecg , UN $ 5c;

[,sp e, I. JLtAR REGULATORY COMMISSION ,

. f[* , ,, g g

REGl2 N 11 101 M ARIETTA STIEET N.W.

8 g ATL ANTA, GEORCI A 30303

. ....

  • OCT 0 51983 Report No. 70-1113/83-27 -

Docket No. 70-1113 License No. SNM-1097 Safeguards Group No. III Licensee: General Electric Company Wilmington, NC 28401 Date af Inspection: September 13-16, 1983 Type of Inspection: Unannounced Material Control and Accountability Inspector:O. M h-ad+4 / /O-6-83 V. W. Sabados, Safeguards Chemist Date Signed Approved by: [D D km, ,

10 /S[S 3 E. J. McAlpine, Chief, { Material Controi and Date Signed Accountability Section, Safeguards Branch Division of Emergency Preparedness and Materials Safety Programs Inspection Sumary Areas Inspected: MC 852068 - Measurement and Statistical Control and follow-up on previous inspection findings.

The inspection involved 23 inspector hours by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC re.quirements in the two areas examined during the inspection.

0511270125 851119 PDR FOIA PDR RATNEROS-554 ,

M

, . S-F2 b _-- /&

Copy _ / cf_ 7 _

Copies 4- _Pages This document is not to be

' reproduced without specific ap,'ro al of IE:II REP 0RTbETAILS Report No. 70-1113/83-27 .

1. Key Persons Contacted
  • W. J. Hendry, Manager, Regulatory Compliance
  • C. M. Vaughan, Manager, L&NMM
  • P. E. Younghans, Manager, Materials Operation.s
  • B. F. Bentley, Acting for Manager, Fuel Manufacturing
  • J. R. Nettles, Acting for Manger, Planning & Projects
  • R. P. Foleck, Sr., Specialist Licensing & Engineering
  • J. L. Keith, Supervisor, HVAC/ Containment

( *C. Shiltz, Acting for Manager, MT&E0 The inspector also interviewed several other licensee employees.

  • Denotes those present at the exit interview.
2. -Licensee Action on Previous Inspection Findings (0 pen) Unrasolved Item (80-02-03): Calibration range for point calibration needs to be defined. Pending evaluation in conjunction with NRC correspondence.

i (0 pen) Unresolved Item (80-07-02): Need to define what constitutes inside the range for point calibration. Pending evaluation in conjunction with NRC correspondence.

(0 pen) Unresolved Item (82-07-01) Need to revise FNMC Plan to reflect the current practice to responding to out-of-control limits. Pending evaluation ia conjunction with NRC correspondence.

(Closed) Violation (53-05-02): Failure to verify each assigned value for the reference standards used for ICPAES for determining Uranium P3h in liquids. The licensee has revised Calibration and Operation Inst.uction No.17 to include the verification for each assigned value. The current values for ICAPES standards have been verified in this manner.

l I (Closed) Inspector Follow-up Item (83-11-01): Samples taken to verify the acceptability of the licensee's measurements. A review of the data did not reveal a discernable difference between New Brunswick Laboratory and the licensee's values for the samples.

(Closed) Inspector Follow-up Item (81-15-01): Samples taken to verify the acceptability of the licensee's measurements for an overseas shipment. A review of the data did not reveal a discernable difference between New Brunswick Laboratory and the licensee's values for the samples.

O

^ ^ ~ ~ ^

^-Pgp up. mm.

e

(

, 2 (Closed) Inspector Follow-up Item (83-19-01): Follow-up on WTCM's in order to verify traceability of enrichment arialyzer standards. The licensee forwarded a copy of QN F-G-859 Revision 4, dated May 11, 1982, to the inspector which documented the traceability of these standards. ,

(Closed) Inspector Follow-up Item (83-20-01): Samples 'taken to verify the acceptability of the licensee's measurements for an overseas shipment. A review of the data did not reveal a discernable difference between New Brunswick Laboratory and the licensee's values for the samples.

3. MC 85200C - Measurement and Statistical Control The program for monitoring and controlling the performance of standard measurements used for accountability purpose was examined. The analytical methods for uranium have limits determined by statistical techniques and are based upon the historical performance of the method. Each measurement system ha:: a warning limit and an out-of-control limit that are reevaluated at least once each material balance period. The measurement method, the frequency of out-of-control situations, the periods examined, and the number of standard measurements performed are presented in Table I. In following-up on the control chart data for total metallic impuritics (TMI) it was found that the licensee had experienced some temporary difficulties when perfonning this measurement as a result of having had to change the brand of graphite electrode normally used. A suitable alternate c.upplier was found correcting this situation.

The licensee has begun the production of U02 pellets for the Babcock and Wilcox (B&W) loledo Edison contract. /

They will then be shipped to Babcock and Wilcox Comercial !

NuclearTJEl Division in Lynchburg, Virginia.

Holdup data were examined for the August 1983 physical inventory. It was determined that the only holdup on inventory was that contained in the HEPA filters. The uranium content assigned to the HEPA filters are detennined by one of three methods: (a) actual filter weighings, (b) calculations based on actual weight gain over a time basis, and (c) a sampling program.

The sampling program was added to the 1983 inventory activities to assign holdup values to the secondary HEPA filters in FM0 an ! FM0X. The program consisted of removing and elephant gun scanning two filters from each of eight representative secondary filter banks. The average value of the l results was.then assigned to all secondary HEPA filters.

I '

-- s. vg y c 3 A tour was made, accompanied by licensee personnel, of the stack area in which the inspe.ctor checked several sampling stations to verify that air sampling was being maintained in accordance with established procedures.

The licensee's housekeeping in this area was found to be satisfactory. The ,

stack sampling program as delineated in Procedure EPI No. 0-6.0, Revision 4 was reviewed in detail with respect to sample analysis and handling of data. The results of this review were also found to be satisfactory.

A tour of the laboratory was_made in which it was noted the liransee was in I theprocessofmodifyingthe(

1 i

l i l As the system continues to be developed for routine op'eration, it will ~be further evalua.ted.

4 Exit Interview The inspection scope .id findings were summarized on September 16, 1983, with those persons indicated in Paragraph 1 above.

9 l

p 9

0 De.0, [ - - mM' I_ - 1. -- - - uwid e

E TABLE I CONTROL ROOM DATA

- m - m f NUMBER OF CONTROL STANDARDS TIME MEASUREMENT MEASURED PERIOD METHOD STANDARD Titrimetric NBS 9508 7/13 - 9/12/83 THI NLL 98 4 7/14 - 9/2/83 Titrimetric RIP 007 7/17 - 8/31/83 (Dirty Powder) 0/U CER 002 7/13/ - 8/18/83 LUM PPMU 10 PPM 2027 7/13 - 8/1/83 25 PPM 2028 7/13 - 8/31/83 100 PPM 2029 7/13 - 9/1/83 G

9

- " " A 4 I)M

-,