Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p)
ML20210A944
Person / Time
Site: Pilgrim
Issue date: 07/14/1999
From: Jason White
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ted Sullivan
CENTERIOR ENERGY
References
NUDOCS 9907230019
Download: ML20210A944 (3)


Text

'

July 14, 1999 Mr. Theodore A. Sullivan Vice President - Nuclear and Station Director Entergy Nuclear incorporated Pilgrim Nuclear Power Station P ymou h M sach setts 02360-5599

SUBJECT:

10 CFR 50.54(p) SUBMITTAL FOR PILGRIM NUCLEAR POWER STATION

Dear Mr. Sullivan:

This letter is in response to your correspondence of September 22,1998 and BECo Ltr.

2.99.064, regarding changes to the Pilgrim Nuclear Power Station Physical Security Plan identified as issue 2, Revision 14 and Revision 14, Addendum 1, respectively, submitted under the provisions of 10 CFR 50.54(p).

Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approval is required, in accordance with 50.54(p). Implemsntation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.

The enclosures to your letters contained Safeguards Information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Mr. Gregory Smith was the reviewer for this matter. Should there be any questions, he can be contacted at (610) 337-5263.

Sincerely, ORIGINAL SIGNED BY:

John R. White, Chief Radiation Safety and Safeguards Branch Division of Reactor Safety Docket No. 50-293

\

D 9907230019 990714 PDR ADOCK 05000293 p PDR RC,0

V .

Mr. T. Sullivan cc:

R. Ledgett, Executive Vice President - Operations ,

J. Alexander, Nuclear Assessment Group Manager J J

- D. Tarantino, Nuclear information Manager S. Brennion, Regulatory Affairs Department Manager J. Fulton, Assistant General Counsel R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

, The Honorable Therese Murray

.The Honorable Vincent DiMacedo T. MacGregor, Mass. Dept. of Public Comm. & Energy Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director P. Gromer, Massachusetts Secretary of Energy Resources J. Miller, Senior issues Manager A. Nogee, MASSPIRG Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attomey General. Commonwealth of Massachusetts J Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designee 1

l I

l I;

r .

Mr.T. Sullivan DISTRIBUTION:

R. Rosano, NRR/PSGB (OWFN 12 E11)

Document Control Desk, Official Record Copy - RID RG01 Region I Docket Room w/ concurrence (w/o SGI)

Region i Safeguards Licensing File (TACS UO1320 and UO1370)

Region I Safeguards Licensing Serial File C. Anderson, Chief, RPB-5, Rl/DRP (w/o SGI)

NRC Resident inspector PUBLIC Nuclear Safety information Center (NSIC)

DOCUMENT NAME: S:\SR CELS SP141.WPD To receive a copy of this document,in in x: "C" = Copy without attachment / enclosure "E" = Copy with attachrnent/ enclosure "N" = No copy OFFICE DRS/RI l WW DRS/81 _- l l NAME CMiskey O/Ahk G h0 \th JWhitV DATE 07/14/99 0 $ 99 G17/Ff/99 07/ /99 07/ /99 OFFICIAL' RECORD COPY 1