ML20210C458

From kanterella
Revision as of 14:37, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/86-29 & 50-364/86-29 on 861211-870110.Violations Described Under Consideration for Escalated Enforcement Action.No Notice of Violation Issued at Present Time
ML20210C458
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/02/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20210C462 List:
References
NUDOCS 8702090393
Download: ML20210C458 (2)


See also: IR 05000348/1986029

Text

g .. - -

g

'

,

FEB 0 2 IM7 -

f/

uccctX

Docket Nos. 50-348 and 50-364

License No. NPF-2 and NPF-8

Alabama Power Company

4 ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/86-29 AND 50-364/86-29

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Bradford on December 11, 1986 - January 10, 1987. The inspection included

a review of activities authorized for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The violations des.cribed in the enclosed Inspection Report are under

consideration for escalated enforcement action. Accordingly, no Notice of

Violation is being issued at this time, and no response to this letter is

required. However, please be advised that the number and characterization of

violations described in the enclosed Inspection Report may change as a result of

further NRC review. You will be advised by separate correspondence of the

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10,

,

Code of Federal Regulations, a copy of this letter and its enclosure will be

placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

! Sincerely,

(Original signed by J. Nelson Grace)

8702090393 870202,

PDR ADOCK 05000348

O PDR J. Nelson Grace

l Regional Administrator

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)

l

!

h

IEo l

_

_ _ _ _ _ _ _ _ _ _ _ _

-

,~

.-

'

FE8 0 21987

Alabama Power Company 2

CC W/ encl:

Hf. O. Whitt, Executive Vice President

t X D. Woodard, General Manager -

Nuclear Plant

/W G. Hairston, III, General Manager -

juclearSupport

L Y. W. McGowan, Manager-Safety Audit

and Engineering Review.

bl/ K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

b c w/ enc 1:

RC Resident Inspector

pF. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

>

RII y RI RI ,

R RI

,

1

1.Modenos:cdg HDance DVerrelli kiteyes GJen ns ref

01/ /87 01/3 c/87 1/p/87 1h6 /87 1/yo/87 37

_. . _ . . _ . ._-_ - -