ML20211B887

From kanterella
Revision as of 23:47, 1 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Confirms 870107 Telcon Re 870210 Enforcement Conference in Region II Ofc to Discuss Inoperability of RHR Sys Loop Isolation Logic.Proposed Meeting Agenda Encl
ML20211B887
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/28/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8702190589
Download: ML20211B887 (2)


Text

'

W c

~

A JAN 2 81987 Alabama Power Company W TN: Mr. R. P. Mcdonald Senior Vice President P. O. Box 2641 Birmingham, AL 35291-0400 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - FARLEY DOCKET N0. 50-348 This confirms the telephone conservation between yourself and Mr. H. C. Dance of my staff on January 7,1987, concerning an Enforcement Conference to be held in the Region II Office on February 10,1987, at 10:00 a.m. We requested this meeting to discuss the inoperability of the Residual Heat Removal System loop isolation logic at your Farley facility. A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, ORIGINAL SIGNED BYi J. NELS0:1 GRACE J. Nelson Grace Regional Administrator

Enclosure:

Proposed Meeting Agenda cc w/ encl:

tW. O. Whitt, Executive Vice President 4/.D. Woodard, General Manager -

Nuclear Plant M G. Hairston, III, General Manager -

fuclear Support W. W. McGowan, Manager-Safety Audit and Engineering Review (WK. Osterholtz, Supervisor-Safety Audit and Engineering Review bcc w/ encl:

Document Control Desk State of Alabama WRC Resident Inspector

4. Reeves, Project Manager, NRR RI R. RII" (- RI RII /

LModenos:jd f HDance dv DVarrelli Reyes GJenk s AGi on MErnst 1/LL/87 /f1/ 22/87 1/9/87 Ihj/87 1/g/87 1/ $7 1/' /87

! B702190589 870120 i PDR ADOCK 05000348 g LE #

l 93 YDR tt

JAN 2 81987 ENCLOSURE a

PROPOSED MEETING AGENDA ALABAMA POWER COMPANY

- FEBRUARY 10, 1987, 10:00 A.M.

I. Opening Remarks M.L.Ernsk II. Inoperability of Residual Heat L. A. Reyes Removal Isolation Logic R. P. Mcdonald Description of Event Administrative Controls Corrective Actions III. Closing Comments M. L. Ernst e

l I

-