ML20215C396

From kanterella
Revision as of 13:58, 3 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/86-24 & 50-364/86-24 on 861103-07.No Violations or Deviations Noted
ML20215C396
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/05/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20215C398 List:
References
NUDOCS 8612150121
Download: ML20215C396 (2)


See also: IR 05000348/1986024

Text

,

c

, , :.

blpu-

u

.. a t

- DEC 5W

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama ower Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/86-24 AND 50-364/86-24

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L. P. Modenos on November 3-7, 1986. The inspection included a review of )

activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

p.i t sic '- '

'

DAVID ii *E

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure: (See page 2)

8612150121 861205 '

PDR ADOCK 05000348

G poq

l

i

i i

XEO/

. <-

,

Alabama Power Company 2

DEC EN

Enclosure:

NRC Inspection Report

w/ encl:

e . O. Whitt, Executive Vice President

. D. Woodard, General Manager -

/ uclear

N Plant

V . G. Hairston, III, General Manager -

Nuclear Support

. W. McGowan, Manager-Safety Audit

and Engineering Review.

. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

c w/ encl:

C Resident Inspector

. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

,

,

e

RII RII

L

W49 &

LMo8enos:bhg

WD

HDance c ;Tv LI ^

11/2g/86 11/ul/86

-

l to

.

_ _ _ . _ .