ML20235F610

From kanterella
Revision as of 17:47, 20 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna
ML20235F610
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/23/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235F613 List:
References
TXX-6773, NUDOCS 8709290233
Download: ML20235F610 (3)


Text

.

(-

e l ==

Log # TXX-6773 1 - 2 File #~10068

.-T C'

,_ 10010 clo 1UELECTRIC g ,

wmism c. counsit Executive Vice President September 23, 1987 i'

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C. 20555

SUBJECT:

'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)

I- DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA

' Gentlemen:

Attached are 15 copies of the letter dated September 23, 1987,;from W. G.

! Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.

The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.

L Very truly yours,

, 1d W. G. Counsil By: .s_- r b, # '

G. S. Keeley & i Manager, Nuclear Lics ing JDS/mgt Attachmen; c- Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b 8709290233 870923 /

PDR A

ADOCK 05000445 PDR I jp l

400 North Olive Street LB 8I Dallas. Texas 75201 l

4 M

lllllllll' ':lllllllll Log # TXX-6772

-  : File # 2260
- 10068 clo it/ ELECTRIC

["j' [l"j, September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.

Suite 390 Walnut Creek, CA 94596 i

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA

Dear Ms. Williams:

Enclosed please find three copies of the following documents:

Impell Document Related Generic Issue Calculation B-04 Rev. O Issue 4 B Calculation M-12 Rev. 3 Issue 7 Calculation M-27 Rev. 2 Issue 19 Calculation M-39 Rev. 2 Issue 21 D Calculation M-59 Rev. 2 Issue 16 G Calculation M-65 Rev. 2 Issue 9 Position Paper IM-P-011, Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012, Issue 26 B

" Stress Evaluation of Angles" Position Paper IM-P-013, Issue 18

" Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201

____ _ _ _ _ _____ - - - . - - - - - - - - - - - - - - - - - - - - -- ------ - - ~

D t

Calculation M-15 Rev. 3 Issue 26 B Calculation M-28 Rev. 3 *

  • This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)

Very truly yours, W. G. Counsil GY

^

l

' By: z .

G. S. Keeley & -/-

Manager, Nuclear Lfgsnsing JDS/mgt Enclosures

_ _ _ _ _ _ _ _ _ _ - - - - _ _ _ . _ _ - . _ _ - - - _ _ . - - - - - ~ ~ ~ ~ ' - ' ~ ~ ~ '~