ML20236B694

From kanterella
Revision as of 14:51, 25 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/87-25 & 50-364/87-25 on 870914- 18.No Violations or Deviations Noted.Unresolved Items Noted in Repts
ML20236B694
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/19/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20236B697 List:
References
CIVP-S-011, CIVP-S-11, NUDOCS 8710260306
Download: ML20236B694 (2)


See also: IR 05000348/1987025

Text

R

~

7 f

.b:  !

ocT 18 W

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

E.

a

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

b8g

m

Senior Vice President .T c7

P. O. Box 2641 p $ '

Birmingham, AL 35291-0400 ut

,9

Gentlemen: f i

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/87-25 AND 50-364/87-25

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

N. Merriweather on September 14-18, 1987. The inspection included a review of

activities authorized for your Farley facility. At the conclusi.on of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified. in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of i

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

Your attention is invited to unresolved items identified in the inspection  !

These matters will be pursued during future inspections.

'

report.

i

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, '

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

OM C

Alan R. Herdt, Chief

Engineering' Branch j

Division of Reactor Safety l

1

Enclosure:  !

NRC Inspection Report

cc w/ encl: (See page 2)

8710260306 871019

PDR ADOCK 05000348

G PDR

r' \\

'

.sl

_ _ _ _ _ _ _ - - - . _ _ - - - - ._

-

.
4 . *

Alabama Power Company 2 00T 1 's 1987

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support l

1

J. W. McGowan, Manager-Safety Audit

and Engineering Review i

J. K. Osterholtz, Supervisor-Safety i

Audit and Engineering Review  !

bec w/ encl:

NRC Resident Inspector .

E. Reeves, Project Manager, NRR l

Document Control Desk )

State of Alabama  !

1

!

I

RIIk/T RJ

RIi W RI RII r

$f .iy1(jf"9 RII(D l

NMerriweather:lb Smith CPaulk WLevis TEConlon HDance i

l 10//k/87 10/4. /87 10//4/87 10//b/87 10//p/87 10//b/87 )

- .

_ - _ _ _ _ _ _ _ _ _ _ _ -