Text
7
f
~
R
.b:
ocT 18 W
!
Docket Nos. 50-348, 50-364
E.
a
Alabama Power Company
b8g
ATTN: Mr. R. P. Mcdonald
m
Senior Vice President
.T
c7
P. O. Box 2641
p $
'
Birmingham, AL 35291-0400
ut
,9
Gentlemen:
f
i
SUBJECT: NRC INSPECTION REPORT NOS. 50-348/87-25 AND 50-364/87-25
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
N. Merriweather on September 14-18, 1987.
The inspection included a review of
activities authorized for your Farley facility.
At the conclusi.on of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified. in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
i
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Your attention is invited to unresolved items identified in the inspection
!
report.
These matters will be pursued during future inspections.
'
i
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
'
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
OM C
Alan R. Herdt, Chief
Engineering' Branch
j
Division of Reactor Safety
1
Enclosure:
!
NRC Inspection Report
cc w/ encl:
(See page 2)
8710260306 871019
ADOCK 05000348
G
r'
\\\\
'
.sl
_ _ _ _ _ _ _ - - -
. _ _ - - - - ._
-
- .
- 4 . *
00T 1 's 1987
Alabama Power Company
2
cc w/ encl:
W. O. Whitt, Executive Vice President
J. D. Woodard, General Manager -
Nuclear Plant
W. G. Hairston, III, General Manager -
Nuclear Support
l
1
J. W. McGowan, Manager-Safety Audit
and Engineering Review
J. K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
bec w/ encl:
NRC Resident Inspector
.
E. Reeves, Project Manager, NRR
Document Control Desk
)
State of Alabama
1
!
I
RIIk/T
RJ
RIi W
RI
RII
r
$f
.iy1(jf"9
RII(D
l
NMerriweather:lb
Smith
CPaulk
WLevis
TEConlon
HDance
i
l
10//k/87
10/4. /87 10//4/87 10//b/87
10//p/87
10//b/87
)
-
.
_ - _ _ _ _ _ _ _ _ _ _ _ -