ML20236Q993

From kanterella
Revision as of 11:54, 20 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Withdraws 960319 Request That Revised Security Plan Become License Amend,Per 10CFR50.34 & 10CFR50.59,due to Permanent Shutdown of Univ of VA Reactor,Effective 980701
ML20236Q993
Person / Time
Site: University of Virginia
Issue date: 07/15/1998
From: Mulder R
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
To: Alexander Adams
NRC (Affiliation Not Assigned)
References
NUDOCS 9807210172
Download: ML20236Q993 (1)


Text

- - -- --_ - _ - _ _ - _ -

SCHOOL OF ENGINEERING Gb July 15,1998 HPPUEDSCIENCE NUCLEAR REACTOR FACILITY \

Mr. Alexander Adams, Jr. Departrnent of Mechanical.

Aerospace & Nuclear Engineering Senior Project Manager Non power Reactors and University of virginia charl tresvine, VA 22903-2442 Decommissioning Project Directorate U.S. Nuclear Regulatory Commission 804-982 5440 FAX: 804-982 5473 11555 Rockville Pike M.S. 0-11-B-20

'Rockville MD 20852-2738

Subject:

Security Plan and Procedures for the University of Virginia Reactor Facility:

" CAVALIER" (Docket No. 50-396, License R-123) and University of Virginia Reactor "UVAR" (Docket No. 50-62, License R-66).

Dear Mr. Adams:

On February 22,1996, U.Va. Reactor Administrator J.P. Farrar submitted a proposed revision to the U.Va. Reactor Facility Security Plan for NRC review and approval. Then, in a second letter to the NRC dated March 19,1996, Mr. Farrar requested that the revised Security Plan become a license amendment, as per 10CFR50.34 and 10CFR50.59. At this time we are withdrawing those requests, in view of the permanent shutdown of the UVAP effected on July 1,1998. (The NRC has already been notified of the UVAR shutdown and the start of decommissioning planning by way of a separate communication.)

During the shutdown and decommissioning periods, we may make changes to the plan currently in effect as warranted and upon approval of our Reactor Safety Committee and also as provided for jf in 10CFR50.54. /

We will be happy to provide additional information or clarification should that become necessary.

S' cc 'l, a A\bewle (y)6

[ '

Commarmuth of WWes i hereby cartfy thd the attadied document is a two and i

Roben U. Mulder, irector exact copy of a . gxesentM W U.Va. Reactor Facility & g Assoc. Prof. of Nuclear Eng. me this I day of 19W -

cc: Mr. Craig Basset, NRC Region II, Atlanta, Ga.

by R0bA N io.,.w.a e x e ~e

- Document Control Desk, NRC, Washington, D.C. v'

} ~.

l 9807210172 980715 2 My commission expires ,

MI ' -

SCHOOL OF

. ENGINEERING dB

& APPUED SCIENCE March 19,1996 ^ " # ECIORF,-1CE/F Department of.\1echanical.

Aerospace & Nuclear Engineering Unis ersity of Virginia Mr. Alexander Adams, Jr. Charic nessille. VA ::903 2442 Senior Project Manager 504 93 .5440 FAX: 504.952-5473 U.S. Nuclear Regulatory Commission 11555 Rockville Pike M.S. 0-11 B 20 Rockville, MD 20852-2738

Subject:

University of Virginia Reactor Facility Security Program

Dear Mr. Adams,

This is to request that the revised Security Plan for the University of Virginia Reactor Facility, submitted to you on February 22,1996, be submitted as a Licence ammendment as per 10 CFR 50.34 and 10 CFR 50.59. The pertinent changes to the existing plan are:

a) The intrusion alarms will be removed from the CAVALIER room and CAVALIER cage since this reactor is undergoing decommissioning and there is no fuel in the reactor.

b) Testing of the intrusion alarm system is being changed from a week]y cycle to a monthly cycle. The weekly cycle is only required for formula quantities of HEU.

All other aspects of the existing security plan are essentially the same.

Ctp%uny of M('*a'IL Cc.u,mwesith cf Virginia i breby certify that the attached document is a true art ncerely, Uc:t ccpy of a  : presented befor om e w u k dh me this , day of NCo'fk ;19 N J.D. Farrar, Administrator t>y 69 N//or U.Va. Reactor Facility ta * * = " ~ s * * * *

  • ao 7 2EhY&

cc: NRC Region II " ' " " '

wp

"' r.6mmiss:on expires 2-!28 - 19 N "The information in this submittal is exempt from public disclosure in accordance with 10CFR 2.790 (d)."

l j

KHOOL OF ENGINEERING dB

& APPUED SCENCE NUCLEAR REACTOR FACILITY February 22,1996 Department of Mechanical, Aerospace & Nuclear Er gineering Unisersity of Virginia Mr. Alexander Adams, Jr. Charlottersine, VA 22903 2442 Senior Project Manager 804 982-5440 FAX: 804-9824473 U.S. Nuclear Regulatory Commission 11555 Rockville Pike M.S. 0-11-B-20 Rockville, MD 20852-2738

Subject:

University of Virginia Reactor Facility Security Program

Dear Mr. Adams,

Attached please find a revised version of our Reactor Facilty Security Plan. Our present plan was written to meet the requirements of formula quantities of HEU. All of our HEU fuel was shipped off site in 1994. Our present LEU inventory ( 7.9 Kg) places us in the Low Strategic Significance Material category which does not even require a Security Plan, however, our R-66 License allows up to 11.0 Kg of LEU which would put us in the Moderate Strategic Material category. We have, therefore, rewritten our plan to meet the requirements of Moderate Stategic Significance. This revised plan was reviewed and approved by our Reactor Safety committee on February 20,1996. We request your approval of this plan.

Sincerely, ,< county of Sbo/ k Commonwealth of Virginia l hereby certify that the attached document is a true and Q exact copy of a - le . presented before I.P. Farrar, Administrator U Va. Reactor Facility l

me this 04 day of bb 19 N ,

by b' ? ?Culof trieme 08 pe' son seekeg ackreeiecgemeno Wsh Notsay PupC Vy commission expires 22 19 W _,

1

SCHOOL OF ENGINEERING @

October 26,1994 - & APPLIED SCIENCE NUCLEAR REACTOR FACILITY Department of Mechanical, Mr. Alexander Adams, Jr. Aerospace & Nuclear Engineering Senior Project Manager University of virginia Charlottesville,VA 22903-2442 Non-Power Reactors and Decommissioning Project Directorate so4-9s2 5440 FAX: 804 982 5473 U.S. Nuclear Regulatory Commission M.S. 0-11-B-20 Washington D.C.

20555

Subject:

University of Virginia Reactor Facility's Security Plan and Procedures, Docket 50-62.

Dear Mr. Adams,

In view of the completed conversion of the University of Virginia Reactor to LEU fuel, and the upcoming decommissioning of the 100W Cavalier Reactor, both of which may have an impact on relaxing security requirements at our Reactor Facility, I respectfully request the NRC to take no further action on its review and approval of amendments to our facility's Security Plan which were proposed by u,s otDuly 13,-19901 The original Security Plan continues to be adequate and is being observed. As time permits, my staff will review this plan next year and prepare an up@tt,4A;aendment 3 request at that time.

Commonwea'th cf Virgirlil' N df Sin ere ', I hereby ces/ that the a'tached docu nent is a true and

- euct copy of ac,.....,,,, bb . p esented before j

Q g Robert U. Mulder, Director me this$ 0 day of Oc b 19 M ~

U.Va. Reactor Facility by RobN & Wf r r.-.....u...,....u,,,., - .

0 9oJVJ.V..

It018') NWC cc: U.S. Nuclear Regulatory Commission, Docuna,9pQpp,rgjn D Ih6sM S Q g ,g l9 g -

Washington, D.C. 20555-0001 /

1 Mr. Stuart Ebneter, Regional Administrator, Region II, U.S. Nuclear Regulatory Commission,101 Marietta Street, N.W., Atlanta, Georgia 30323 Mr. Charles H. Hendren, Safeguards Branch, OWFN, MS 0-9D24, Washington D.C.

20555-0001 A I t l(\ lhm

~j a,tu m r

, o __,

is

_- ________-_-_-__________ -