IR 05000250/1989033

From kanterella
Revision as of 06:41, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training
ML20246B108
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/09/1989
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20246B094 List:
References
50-250-89-33, 50-251-89-33, NUDOCS 8908230251
Download: ML20246B108 (2)


Text

,

- . - _ - _ . _ - _ . , _ - - - _ . --. _--_.____-_- - __

_

$  ; l- > 't UNITED STATES .

j:

-

L ,i [p * . NUCLEAR REGULATORY COMMISSION l ,

-

o, t REGION !! :-

-

101 MARIETTA ST, N. g ,, ATLANTA, GEORGIA 30323

[- ,

'

Report Nos.: 50-250/89-33 and 50-251/89-33 Licensee: Florida Power and Light Company '

9250 West Flagler Street Miami, FL 33102

'

Docket Nos.:' 50-250 and 50-251 License'Nos.: DPR-31 and DPR-41 Fasility Name: Turkey Point 3 and 4

~

Inspection'Cond te July 17- 1,1989

' Inspector: ///f/MIdejbdr'ds' /Mdf[ Inspector k

Irate' SiQned A. Tillmaff(

Accompanying Personnel: R. F. Skelton, Reactor Security Specialist

. Program Development Review Section Division of Reactor.. Inspection and Safeguards, NRR

'

-

Approved by: <, - C 8!9 f

'D. icGui re,' Chief / Up'te $igned Physical Security Section Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY

~ Scope:

This routine, unannounced inspection was conducted in the areas of Management Effectiveness - Security Program; Physical Barriers - Protected Area; Physical Barriers - Vial Areas;. Assessment Aids; and Personnel Training and Qualifica-tion - General Requirements. In addition, the Physical Security Section Chief and the inspector participated with the NRR Reactor Security Specialist in

--discussions with Licensee Management concerning the status of the programmed

' Security' System Upgrade and resolution of the long standing vital barrier issue. The Security Section Chief and inspector also attended the bi-monthly NRC-FP&L Management Meetin The status of- the security upgrade /enhancemmt progr.am was discusse Results:

Observations and ' inspection results confirmed that Licensee efforts to upgrade security systems and facilities and to improve the effectiveness and performance-of security personnel were ongoing and some indication of improvement in personnel performance was noted. Engineering studies, design and scheduling activities relating to the security program upgrade had been complete However, construction and installation efforts had not been initiated. With regard to security program management and effectiveness, a newly hired 8908230251 890809 PDR ADOCK 05000250 Q PDC  %,,.,, ,,,n,,11,o,.,,,13 m F RMATION- m.~,s seesa~e u ae-rieo

+- =m s-+d -

.SAFEGUA uclowes, this dxument is decontrolled.

_ - . - _ _ - - _ . - _ - _ _ . _ --

r-

-

, _

.

-

.z.,-. . ... ..

c, . -

.

~

l .. .

- 2 p

experienced security- manager arrived on site' July 21, 1989,. and several-initiatives .to enhance security personnel motivation and work ethics had been-adopte .

.

.

Datument transmitted tie ewith

" ~ ' " """""" F"f0nnatio in WFen seperr.ted from enchturet, thm document it. dccontrolied

- . - - - . _ . . _