ML20246B239

From kanterella
Revision as of 06:16, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/89-12 & 50-364/89-12 on 890511-0610.No Violations or Deviations Noted
ML20246B239
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/27/1989
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20246B241 List:
References
NUDOCS 8907070253
Download: ML20246B239 (2)


See also: IR 05000348/1989012

Text

- _ _

- _ _ _

r

7

  • f'.  : fyUl

h ,

JUN 2 71929

l

Docket Nos. 50-348, 50-364

License Nos. NPF-2, NPF-8

Alabama Power Company

ATTN: W. G. Hariston, III

Senior Vice President

Nuclear Operations

40 Inverriess Center Parkway

P. O. Box 1295

Birmingham, AL 35101

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-12 AND 50-364/89-12

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Maxwell on May 11 - June 10, 1989. The inspection included a review of

activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, inter views with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violation or deviations were identified.

The enclosed Inspection Report documents an oral commitment (see paragraph 9)

made by a licensee representative and discussed in the exit interview. If

your understanding of this commitment differs from the report statements,

please inform this office promptly. -

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, 4

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us. l

Sincerely.

M

ORIG 1tJ Al 5'ON l

OAVID g. VERREW {

David M. Verelli, Chief

Reactor Piojects Brance 1

Division of Reactor Projects

Enclosure: (See page 2)

8907070

7 =253 cx890627

osooone l

nc zgo,

_ _ - - _ - -- - - - - - - J

_ _ _ - - . _.

___. _ _ _ _ _ _ _ _

l

< .-

,

b

l-' . Alabama Power Company. 2 JUN 2 71989 i

I

l

Enclosure: i

NRC' Inspection Report

cc w/ enc 1:

B. M. Guthrie, Executive Vice

President

R. P. Mcdonald, Executive Vice

President

J. D. Woodard, Vice President

Nuclear Generation

D. Morey, General Manager

Farley Nuclear Plant

J. W. McGowan, Manager, Safety Audit

'

and Engineering Review

S. Fulmer, Supervisor, Safety Audit

and Engineering Review

State of Alabama

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

RII RII

jiC*Df  %^

LModenos FCan rell

06/AJ/89 06/jp89

-___-_____ _______ _ __ _ _ _ _ _ _ _ _ . . _ _ _ _