Forwards Insp Repts 50-348/89-06 & 50-364/89-06 on 890227-0303.No Violations or Deviations Noted
ML20248E524
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/23/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20248E526 List:
References
NUDOCS 8904120272
Download: ML20248E524 (2)


See also: IR 05000348/1989006

Text

"

,

.. , OfRClQ]

. .

MAR 2 31969

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President-Nuclear

Operations

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-06 AND 50-364/89-06

l

This refers to the Nuclear Regulatory Conmission (NRC) inspection conducted by

P. G. Stoddart on February 27-March 3, 1989. The inspection included a review

of activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

l these areas, the inspection consisted of selective r. examinations of procedures

and representative records, interviews with pereannel, and observation of

activities ~in progress.

i

'

Within the scope of the inspection, ao violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological Protection Branch

Division of Radiation Safety l

and Safeguards l

l

Enclosure: (See page 2) j

!

!

8904120272 890323

PDR ADOCK 05000348

Q PDC , ,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ - _ _ - . ._ ._ _ ___ _______ _____ __-__

. reb

.

_ . . . .. . -

,

1

!

., ...

' *

.,

Alabama Power Company 2 I

l

Enclosure:

NRC Inspection Report

I

cc w/ enc 1:

B.~ M. Guthrie, Executive Vice President- I'

D. N. Morey, General Manager -

Nuclear Plant  ;

J. D. Woodard,- Vice President - '

Nuclear Generation ,

!

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety i

Audit and Engineering Review

State of Alabama

i

bcc w/ enc 1:

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document Control Desk

l

RIl RII RII

Y- QQ

PStoddartOfah{le

$$

FCintrell

3/>)/89 373 3 89 3/j,}/89

l

. _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _