ML20248E524
| ML20248E524 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/23/1989 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W ALABAMA POWER CO. |
| Shared Package | |
| ML20248E526 | List: |
| References | |
| NUDOCS 8904120272 | |
| Download: ML20248E524 (2) | |
See also: IR 05000348/1989006
Text
"
,
OfRClQ]
..
,
.
.
MAR 2 31969
Docket Nos. 50-348, 50-364
Alabama Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President-Nuclear
Operations
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-348/89-06 AND 50-364/89-06
l
This refers to the Nuclear Regulatory Conmission (NRC) inspection conducted by
P. G. Stoddart on February 27-March 3, 1989. The inspection included a review
of activities authorized for your Farley facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
l
these areas, the inspection consisted of selective
r. examinations of procedures
and representative records, interviews with pereannel, and observation of
activities ~in progress.
i
Within the scope of the inspection, ao violations or deviations were
'
identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
l
and Safeguards
l
l
Enclosure:
(See page 2)
j
!
!
8904120272 890323
ADOCK 05000348
Q
, ,
. reb
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
__
_ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _
- _ _ _ _ - _ _ - .
._
._ _ ___ _______ _____ __-__
.
_ .
. .
.. .
-
,
1
!
.,
...
'
.
Alabama Power Company
2
I
l
Enclosure:
NRC Inspection Report
I
cc w/ enc 1:
B.~ M. Guthrie, Executive Vice President-
I
'
D. N. Morey, General Manager -
Nuclear Plant
J. D. Woodard,- Vice President -
'
Nuclear Generation
,
!
J. W. McGowan, Manager-Safety Audit
and Engineering Review
S. Fulmer, Supervisor-Safety
i
Audit and Engineering Review
State of Alabama
i
bcc w/ enc 1:
NRC Resident Inspector
E. Reeves, Project Manager, NRR
Document Control Desk
l
RIl
RII
RII
Y- QQ
PStoddartOfah{le
$$
FCintrell
3/>)/89
373 3 89
3/j,}/89
l
. _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _