IR 05000220/1981016

From kanterella
Revision as of 23:18, 21 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC 810804 Ltr Re Violations Noted in Ie Insp Rept 50-220/81-16.Corrective Actions:Format Signoff Now Complies W/Temporary Change to Reactor Analysis Dept Procedure
ML18037A090
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/03/1981
From: LEMPGES T E
NIAGARA MOHAWK POWER CORP.
To: BRUNNER E J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17053C836 List:
References
NMP-3586, NUDOCS 8109220620
Download: ML18037A090 (2)


Text

VMIIASAlRA.QPgQOQ+Q'gNMP-3586NINEMILEPOINTNUCLEARSTATION/P.O.BOX32LYCOMING,NEWYORK13093/TELEPHONE(315)343-2110September3,1981Mr.EldonJ.Brunner,ChiefProjectsBranch81Division.ofResidentandProjectInspectionUnitedStatesNuclearRegulatoryCommission631ParkAvenueKingofPrussia,Pennsylvania19406

SUBJECT: InspectionReport50-220/81-16

DearMr.Brunner:

ThesubjectInspectionReportidentifiedanoccurranceatNineMilePointwhereinatemporarychangewasmadetoaReactorAnalysisDe-partmentProcedurewithoutproperapprovalperTechnicalSpecifica-tion6.8.3.ThechangewasmadeunderthedirectionoftheReactorAnalysisDe-partmentSupervisor,whoholdsaSeniorReactorOperator'slicense.ThechangewasverballyconcurredwithbyatleastonememberoftheReactorAnalysisDepartment,butformalsign-offbyaSeniorlicensedSupervisorandanothermemberoftheplantmanagementstaffwasneglecteduntiltheResidentNRCInspectorpointedoutthede-ficiency.AtthattimetherequirementsofTechnicalSpecification6.8.3werecompliedwith.TheincidentandtheTechnicalSpecificationhavebeenreviewedwithallmembersoftheReactorAnalysisDepartment.Verytrulyyours,gThomasE.LempgesVicePresidentNuclearGenerationTEL:RGR/j1(Bi09220b208109i7PDRADOCK05000220',aPDR, e~'V~~~~