ML18038A707

From kanterella
Jump to navigation Jump to search
Forwards Rev 5 to NMPC-QATR-1, QA Topical Rept for Nine Mile Point Nuclear Station Operations
ML18038A707
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/05/1990
From: Jamila Perry
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17056A610 List:
References
NMP1L-0475, NMP1L-475, NUDOCS 9002140260
Download: ML18038A707 (10)


Text

I'" <.~ACCELERATED D UTION DEMONS TION SYSTEM J

REGULATORY INFORMATION DISTRIBUTION SYSTEM, (RIDS).

ACCESSION NBR: 9002140260 DOC. DATE: 90/02/05 NOTARIZED:

NO FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 50-410 Nine Mile Point, Nuclear Station, Unit 2, Niagara Moha AUTH.NAME AUTHOR AFFILIATION PERRY,J.A.

Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000220 05000410

SUBJECT:

Forwards Rev 5 to NMPC-QATR-1, "QA Topical Rept for Nine Mile Point Nuclear Station Operations."

DISTRIBUTION CODE:

Q004D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: QA Topical Report, Amendment, or Corres ondence (Docket/Utxlxty NOTES gf o

Speci RECIPIENT ID CODE/NAME PD1-1 LA INTERNAL: ACRS NRR/DLPQ/LPEB10 OC/LFMB RGN1 FILE EXTERNAL: LPDR COPIES LTTR ENCL 1

1 8

8 2

2 1

1 1

1 1

1 RECIPIENT ID CODE/NAME MARTIN,R.

IRM/DCB (AMDTS)

NU CS~AB CT REG 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 2

2 1

1 D

D R

D NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

0 vk,

JP90-035 PRO-2 JAMES A. PERRY vIas pRssISEm-auAUIYAssuaANcE NIAGARAMOHAWKPOWER CORPORATION

~))It&

NIAGARA~

MOHAWK 300 ERIE 80UI EYARD WEST SYRACUSE, k.Y. I3202 February 5,

1990 NMPlL 0475 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 1, Docket No. 50-220, DPR-63 Nine Mile Point Unit 2, Docket No. 50-410, NPF-69 Gentlemen:

Transmitted herewith is Revision 5 of the guality Assurance Topical Report for Nine Mile Point Nuclear Station Operations (gATR-I).

This revision incorporates changes to the guality Assurance Program since the issuance of Revision 4.

These changes are being submitted in accordance with the requirements of 10CFR50.54(a)(3).

The revisions include Corporate reporting and responsibility changes as well as general descriptions of responsibilities For organizations not previously identified.

Other changes were incorporated to more precisely define commitments.

The revised text has been noted by the application of vertical lines in the outer margins.

For your convenience we have included Attachment 1,

a detailed summary of changes.

These changes can be described as general updates and clarifications that do not reduce previous commitments.

If you have any questions, pl'ease contact the undersigned.

Sincerely, NIAGARA MOHAWK POWER CORPORATION ames A. Per'ry ice President

- equality Assurance JAP/jac Attachment cc:

Regional Administrator, Region 1

W. A. Cook, Sr. Resident Inspector R. A. Capra, Project Director

. R. Martin, Project Manager (Un@

1 and 2)

P.

K. Eapen, Region 1

9002140260 900205 PDR AOOCK 05000220 P

PDC gall

1 C

4 f'I"

SUGARY OF CHANGES NMPC QUALITY ASSURANCE TOPICAL REPORT FOR NINE MILE POINT NUCLEAR STATION OPERATIONS QATR-1, REVISION 5 The following changes have been made to clarify or update certain sections of the Report.

None of the changes constitute a change in the Quality Assurance Program.

General

- Title of Executive Vice President,

Nuclear, has been changed throughout report to Executive Vice President, Nuclear Operations.

Page 1-1, Section 1.1

- Adds two departments; Nuclear Services and Controller Nuclear Division.

Page 1-2, Section 1.2.2.A - Changed title to Executive Vice President, Nuclear Operations.

Page 1-3, Section 1.2.2.A.3.a

- Change reflects current responsibilities.

Page 1-4, Section 1.2.2.A.3.b

- Change reflects current responsibilities.

Page 1-4, Section 1.2.2.A.4

- Change reflects current organizational title.

Page 1-5, Section 1.2.2.B - Changed title to Executive Vice President, Nuclear Operations.

Page 1-6, Section 1.2.2 C,D&E.1 - Change reflects current responsibilities.

Page 1-6, Section 1.2.2.E.2-4

- Change reflects current responsibilities.

Page 1-7, Section 1.2.2.E.5

- Adds Project Hanagers and their responsibilities.

Page 1-7, Section 1.2.2.F

- Change reflects current responsibilities.

Page 1-8, Section 1.2.2.G - Adds new department,

Hanager, Nuclear Independent Assessment Group (IAG) and its responsibilities.

Page 1-8, Section 1.2.2.H - Adds new department, Controller Nuclear Division, and its responsibilities.

Page 1-8, Section 1.2.2.I - Noved Section 1.2.4.A, Quality Assurance Responsibilities, previously described separately under Paragraph 1.2.4.A are now included in description of Nuclear Division responsibilities.

Page 1-10, Section 1.2.2. I.2.a

- Added restriction on interpretation and implementation of QA Policy and Procedures, Page 1-10, Section 1.2.2. I.2.d - Change clarifies responsibilities.

Page 1-10, Section 1.2.2. I.2.f - Refers to the Quality Assurance Procedures (QAPs) for specific duties.

-~

l y C C

I

SUMMARY

OF CHANGES NHPC EQUALITY ASSURANCE TOPICAL REPORT FOR NINE MILE POINT NUCLEAR STATION OPERATIONS gATR-1, REVISION 5

~CON U

Page 1-10, Section 1.2.2. I.3.a - Adds responsibilities.

Page l-ll, Section 1.2.2.I.4

- Revised for clarity.

Page l-ll, Section 1.2.2.I.4.a

- Adds responsibilities.

Page 1-12, Section 1.2.2.I.5 - Change scope to include group leads.

Page 1-16, Figure 1 Changes organization chart to reflect current organization.

Page 1-17, Figure 1 Adds two departments, Nuclear Services Department and Nuclear Division Projects and their responsibilities.

Also adds departments'rimary procedures by title and letter designation.

Page 2-6, Section 2.2.16

& 2.2.17

- Adds Executive Vice President, Nuclear Operations.

Page 7-1

& 7.2, Section 7.2.3 - Adds a paragraph explaining how procurement of safety-related equipment is allowed from suppliers not on the gualified Contractors List Database (gCLD).

Page 11-2, Section 11.2.4 - Revised for clarity.

Page 15-1, Section 15.1

- Revises second paragraph of Policy to reflect present systems to handle nonconforming conditions.

Page 15-1

& 15.2, Section 15.2

- Revises format to clarify requirements.

Page 16-1, Section 16.1

- Restates policy in more general terms.

Page 16-1, Section 16.2.2

- Establishes requirement for controls to be stated in departmental procedures.

Appendix B, Page B Exception 3N, added to reflect commitment as shown in Appenidx A," Item 7.

Appendix B, Page B Exception 4F revised to reflect NgA-1 1989 temporary storage criteria.

Appendix B, Page B-9 & B Exception 4G added to reflect upgrade in NFPA code

year, from 1975 to 1986 as delineated in NgA-l, 1989.

Appendix C, Page C Deleted, cancelled, gAP 14.20 from the procedure matrix.

(coverlet)

l~ 'E I

7

~r lf

T NIAGARA',,"""'

IVIOi4NC '

0 TRANSMITTAL OF CONTROLLEO QUALITY ASGURAViCE DOCUMENTS 90-3 aZ>-m/@gal grzjjy~

20 Document Control Desk Washington, DC 20555 R. J.

KTaemer 2590 i PLEASE SIGN THE OOCUMENT TRANSMITTAL IN BLACK '.NK ANO RETURN VITHIN OIENTY (20)

OATS TO:

iagara Mo awk Power Corp.

300 Erie Boulevard West

Syracuse, NY 13202 Attn:

R. J.

Kraemer Quality Assurance Dept.,

82 DOCUMENT IDENTIFICATION:

ualit Assurance Pro ram To i DOCUMENT(S) ATTACHED:

Oualit Assurance Pro ram T for Nine Mile Point Nuclear Station 0 eTations A

-1 Revision 5

DOCUMENT(S)

TO BE DESTROYED: 0 ualit Assuran Pro ram To ical Re ort for Nine Mile Point Nuclear Station 0 erations ATR-1 Revision 4

PLEASE ASSURE YOUR ADDRESS INDICATED ABOVE IS CORRECT.

ANY CHANGES SHOULD BE PROVIDED BELNT COPIES OF PROCEDURES CURRENTLY IN EFFECT SHOULD BE RETAINED UNTIL AFTER THE EFFECTIVE DATE OF THE REVISION.

RECKIPT OF THE ABOVK LISTED DOCUMENTS IS HEREBY ACKNOHLEOGEO AND I HEREBY CERTIFY THAT ALL VOID OR SUPERSEDED COPIES OF THE ABOVE LISTED DOCUMENTS HAVE BEEN REMOVEO FROM USE (DESTROYED OR MARKED VOIDS

)

STC2IATTlIIE DATE PLEASE SIGN THE DOCUMENT TRANSMITTAL IN BLACK INK ANO RETURN HITHIN THENTY (20)

DAYS (IF THIS TRANSMITTAL IS NOT RETURNED 'WITHIN THE ALLOTTED TIME. YOUR COPY OF THE SUBJECT DOCUHEHT WILL GE RECALLED AND YOUR IIAME REMOVEO FROM THE LIST OF CONTROLLED DOCUMENT HOLDERS.)

157-IO, 2. ST

0

~

'L f.