Responds to NRC 810804 Ltr Re Violations Noted in IE Insp Rept 50-220/81-16.Corrective Actions:Format Signoff Now Complies W/Temporary Change to Reactor Analysis Dept Procedure
ML18037A090
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/03/1981
From: Lempges T
NIAGARA MOHAWK POWER CORP.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17053C836 List:
References
NMP-3586, NUDOCS 8109220620
Download: ML18037A090 (2)


Text

V MIIASAlRA. NMP-3586 Q PgQOQ+Q'g NINE MILE POINT NUCLEAR STATION /P.O. BOX 32 LYCOMING, NEW YORK 13093/TELEPHONE (315) 343-2110 September 3, 1981 Mr. Eldon J. Brunner, Chief Projects Branch 81 Division .of Resident and Project Inspection United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

SUBJECT:

Inspection Report 50-220/81-16

Dear Mr. Brunner:

The subject Inspection Report identified an occurrance at Nine Mile Point wherein a temporary change was made to a Reactor Analysis De-partment Procedure without proper approval per Technical Specifica-tion 6.8.3.

The change was made under the direction of the Reactor Analysis De-partment Supervisor, who holds a Senior Reactor Operator's license.

The change was verbally concurred with by at least one member of the Reactor Analysis Department, but formal sign-off by a Senior licensed Supervisor and another member of the plant management staff was neglected until the Resident NRC Inspector pointed out the de-ficiency. At that time the requirements of Technical Specification 6.8.3 were complied with.

The incident and the Technical Specification have been reviewed with all members of the Reactor Analysis Department.

Very truly yours, g

Thomas E. Lempges Vice President Nuclear Generation TEL: RGR/j 1 Bi09220b20 8109i7