ML18038A451

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to NMPC-QATR-1, QA Program Topical Rept for Nine Mile Point Nuclear Station Operations. Revs Include Corporate Reporting & Responsibility Changes as Well as Descriptions for Organizations Not Previously Identified
ML18038A451
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/22/1989
From: Palmer D
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17055E538 List:
References
NUDOCS 8903020482
Download: ML18038A451 (6)


Text

': (zp5~mTED

/ "j DISTOBl TION DEMONSTR43Y SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903020482 DOC.DATE: 89/02/22 NOTARIZED: NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION PALMER,D.R. Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Cont ol Desk) ~

R

SUBJECT:

Forwards Rev 4 to NMPC-QATR-l, "QA Assurance Program Topical I Rept for Nine Mile Point Nuclear Station Operations."

DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: QA Topical Report, Amendment, or Corresp ndence~(Docket/Utzlzty pe i NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 LA 1 1 SLOSSON,M 1 1 HAUGHEY,M 1 1 BENEDICT,R 1 1 INTERNAL: ACRS 8 8 ARM/DAF/LFMB 1 1 NRRJ3LPQ/. B 10 2 2 NUDOCS-ABSTRACT 1 1 01 2 2 RGN1 FILE 1 1 EXTERNAL: DMB/DSS 1 1 LPDR 1 1 NRC PDR 1 1 A

NOTE 'IO ALL "RIDS" RECIPZEPIS'IZASE HELP US 'IO REDUCE %MHZ.'ONI'ACI'IHE DOCUNH& CONI'ROL DESKS ROOM Pl-37 (EXT. 20079) TO EIZKQQZE YOUR NME FMH DISTEGBUTIGN LXSTS FOR DOCRKKIS YOU DGNiT NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22

"v NIAOARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE. N.Y. 13202/TELEPHONE {315) 474 'I511 February 22, 1989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 1, Docket No. 50-220, DPR-63 Nine Mile Point Unit 2, Docket No. 50-410, NPF-69 Gentlemen:

Transmitted herewith is Revision 4 of the Quality Assurance Topical Report for Nine Mile Point Nuclear Station Operations (QATR-l).

This revision incorporates changes to the Quality Assurance Program since the issuance of Revision 3. These changes are being submitted in accordance with the requirements of 10CFR50.54(a)(3). The revisions include Corporate reporting and responsibility changes as well as general descriptions of responsibilities for organizations not previously identified. Other changes were incoxporated to more precisely define commitments. The revised text has been noted by the application of vertical lines in the outer margins.

For your convenience we have included Attachment 1, a detailed summary of changes.

P These changes can be described as general updates and clarifications that do not reduce previous commitments. 1f you have any questions, please contact the undersigned.

Sincerely, NIAGARA MOHAWK POWER CORPORATION D. R. Palmer Acting Quality Assurance Department Manager DRP/jac Attachment cc: Regional Administrator, Region 1 W. A. Cook, Sr. Resident Inspector R. A. Capra, Project Director M. F. Haughey, Project, Manager (Unit 1&2)

P. K. Eapen, Region 1 os 8908020482 890222 PDR ADOCK 05000220 PDC

/j LI V NIAGARA H U MQHAWK NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST. SYRACUSE. N.Y. 13202/TELEPHONE (315) 474-1511 February'2, 1989 NMPlL 0361 U.S. Nuclear Regul'atory Commission ATTN: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 1, Docket No. 50-220, DPR-63 Nine Mile Point Unit 2, Docket No. 50-410, NPF-69 Gentlemen:

Transmitted herewith is Revision 4 of the Quality Assurance Topical Report,fox Nine Mile Point Nuclear Station Operations (QATR-l).

This, revision incorporates changes to the Quality Assurance Program since the issuance of Revision 3. These changes are being submitted in accordance with the requirements of 10CFR50.54(a)(3). The revisions include Corporate reporting and responsibility changes as well as genexal descriptions of responsibilities for organizations not previously identified. Other changes were incorporated to more

.precisely define commitments. The revised Cext has been noted by

~the application of vertical lines in the outer margins.

For your convenience we have included Attachment 1, a detailed summary of changes.

These changes can be described as general updates and clarifications that do not reduce previous commitments.

please contact the undersigned.

If you have any questions, Sincerely, NIAGARA MOHAWK POWER CORPORATION D. R. Palmer Acting Quality Assurance Department Manager DRP/jac Attachment cc: Regional Administrator, Region 1 W. A. Cook, Sr.'esident Inspector R. A. Capra, Project Director M. M. Slosson, Project Manager (Unit 162) goo'I P. K. Eapen, Region 1

~s fl P

'X$ h' f t 7 4