Forwards Restart Readiness Rept. Rept Submitted in Fulfillment of Util Third Action Required by Confirmatory Action Ltr CAL-88-17,dtd 880724
ML18038A664
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/08/1989
From: Donlon W
NIAGARA MOHAWK POWER CORP.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17056A275 List:
References
CAL-88-17, NUDOCS 8909130068
Download: ML18038A664 (7)


Text

gccE~RATED DRIBUTION DEMON STTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909130068 DOC.DATE: 89/09/08 NOTARIZED: NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 AUTH. NAME AUTHOR AFFILIATION DONLON,W.T. Niagara Mohawk Power Corp.

RECZP.NAME RECIPIENT AFFILIATION

SUBJECT:

Forwards "Restart Readiness Rept."

DISTRIBUTION CODE: ZE26D TITLE: Startup Report/Refueling Report (per COPIES RECEIVED:LTR +ENCL+@ SIZE: Wi vk Te&c Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 LA 1 0 PD1-1 PD 1 1 SLOSSON,M 2 2 INTERNAL: ACRS 5 5 IRM TECH ADV 1 1 NRR C RTON 1 1 NUDOCS-ABSTRACT 1 1

~REG FILE 1 1 RGN1 FILE 01 1 1 D RGN2/DRSS/EPRPB 1 1 S

EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I D

S A

D D

NOXK 'IO ALL RIDS" S

~pe ~

KXIFGXIS'IFASE HELP US Io RECCE  %~I 'IHE DXGMENZ CXWIK)L DESK RXH P1-37 (EXT. 20079) TO EliQCQQQS MNB EKH XKEHGBUZZCN IZSTS HZt DOCUMENIS RXJ IXN~T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL

NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 CI11E SOUL,EVAIIO WEST SYII*CUSK. N.Y. 13202 WILLIAMJ. DONLON CHAIRMANANO CHIEF EXECUTIVE OFRCER September 8, 1989 Mr. William T. Russell Regional Administrator, Region 1 United States Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Re: In the Matter of Niagara Mohawk Power Corporation (Nine Mile Point, Unit 1)

Doc et o 5 0

Dear Mr. Russell:

On behalf of Niagara Mohawk Power Corporation, I am pleased to submit our Restart Readiness Report (Report) which demonstrates that Nine Mile Point Unit 1 can be safely restarted and operated, subject to the completion of the items clearly identified therein. The Report is submitted in fulfillment of Niagara Mohawk's third action required by Confirmatory Action Letter 88-17 dated July 24, 1988.

The Report represents a comprehensive evaluation of the effectiveness of the corrective actions contained in the Restart Action Plan which was originally submitted to you on December 20, 1988. Over six thousand manhours were spent in preparing this Report and in assessing our nuclear program through audits, field observations, performance reviews, and personal interviews.

The Report was prepared by the Restart Review Panel consisting of technical and management experts from both within and outside the Company chaired by Mr. Lawrence Burkhardt, III, Executive Vice President-Nuclear Operations. A letter dated September 7, 1989 transmitting the Report to me and discussing elements of the Panel's review is attached to the Report. The Panel's Report has been presented to the Board of Oversight Committee, Mr. Endries, President of Niagara Directors'uclear Mohawk, and me. Based upon a careful review of the Report, supported by continuing discussion and personal observation, I am satisfied as to the scope and depth of the assessment, and I am in accord with its conclusions.

Fg(

390P130068 89008 ijo PDR ADOCK 0500020 P PDC

Mr. William T. Russell Page 2 September 8, 1989 The Report reflects a number of open items which must be closed prior to restart. Each has been examined to assure that it does not detract, from the ability of the Company to make a present decision regarding restart. We are making every effort to close each item rapidly although some, by their nature, can only be closed over the ensuing weeks leading to restart. A complete list of these items is being tracked and is available for review by the NRC.

As noted in the Report, upon the completion of the remaining items for restart delineated in the Report, I will again communicate with you requesting your approval for restart.

look forward to meeting with your team as it reviews the readiness of the Unit for restart. You can be assured of the We complete cooperation of Niagara Mohawk in your review efforts.

Xn the meantime, if you have any questions, please let me know.

Very truly yours, NIAG OHAWK POWER CORPORATION W lliam J. Donlon Chairman nd Chief Executive Officer WJD/j c Attachment cc: Mr. W. Kane, Director, Division of Reactor Projects (DRP),

Region I Mr. W. Johnston, Deputy Director, DRS Mr. R. Bores, Technical Assistant, Division of Radiation Safety & Safeguards Mr. R. Capra, Director, Project Director X-1, NRR Mr. E. Wenzinger, Chief, Branch 2, DRP Mr. J. Johnson, Chief, Projects Section 2C, DRP Ms. M. M. Slosson, Project Manager, NRR Mr. W. A. Cook, Senior Resident Xnspector, Nine Mile Point Units 1 and 2 Records Management Document Control Desk

NINE MILE POINT UNIT I RESTART READINESS REPORT t8909130068