Forwards Requalification Exam Rept 50-395/OL-89-01 Administered During Wks of 890221 & 27
ML20244D593
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/01/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20244D595 List:
References
NUDOCS 8906190158
Download: ML20244D593 (2)


Text

June 1, 1989 South Carolina Electric and Gas Company ATTN: Mr. O. S. Bradham, Vice President Nuclear Operations P. O. Box 88 Jenkinsville, SC 29065 Gentlemen:

SUBJECT:

V. C. SUMMER REQUALIFICATION EXAMINATION REPORT 395/0L-89-01 The NRC administered examinations during the waeks of February 21 -and February 27, 1989, to employees of your company who currently hold licenses to operate the V. C. Summer Nuclear Plant. At the conclusion of the site visit, preliminary findings were discussed with you and those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided in Enclosure 2. Comments made by your training staff concerning the validity of some questions in the week 2 written examinations are contained in .

Copies of the written examination and answer key are included in this report as .

A Requalification Program Evaluation Report is included as Enclosure 5. This Evaluation Report finds that the V.C. Summer Requalification program remains satisfactory. Your attention is invited to information in the Evaluation Report which describes our concern over the number and type of post-exam changes made to the written examination. We would like the opportunity to discuss this issue with your staff to insure that both NRC and your training staff more fully agree on the conduct of future exams.

A Simulator Fidelity Report is provided in this report as Enclosure 6.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1, 3, 4,'5 and 6 will be placed in the NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosures:

(See Page 2) 8906190158 890601 PDR V

ADOCK 05000395 PDC h'p[h ift

{

-1 i

s i

i South Carolina Electric and Gas Company 2 ~ June 1, 1989 j l

i

Enclosures:

I

1. . Examination Report No. 50-395/0L-89-01  !
2. Requalification Results Summary Sheet 4 (Official Use Only - Privacy Act  ;

Information) 1

3. Facility Comments on Written Exam Questions 1
4. R0/SR0 Written Examinations and Answer Key l
5. Requalification Program Evaluation  !
6. Simulator Fidelity Report  !

cc w/encls 1, 2, 5, and 6 l M. B. Williams, General Manager l Nuclear Services .i J. L. Skolds, General Manager i Nuclear Plant Operations I

cc w/encls 1, 2, 3, 4, 5, and 6 '

K. Woodward, Manager, Nuclear Operations Education and Training cc w/ encl 1: .

State of South Carolina j l

I bec w/encls 1, 3, 5, and 6 J. Hayes, NRR

)

l )

D. Verrelli, DRP l l

R. Prevatte, Summer Senior  !

Resident Inspector i M. Ernstes, DRS i

bec w/encls 1, 5, and 6:

Operator Licensing Branch, NRR l bec w/encls 1, 3, 4, 5, and 6 Document Control Desk -

RII RII RII L'

vJMoorman:btm CCEto 7M TP6E61es  !

(5/1A/89 5/ ? /89 g///89 i

_ - - _ _ _ _ _ - _ _ - - _ - - - _ - _ - . _ -_