Forwards SER on Util 850301 Revs to Solid Waste Process Control Programs.Revs Acceptable.W/O Encl
ML20214G160
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 05/02/1986
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
Shared Package
ML20214G092 List:
References
NUDOCS 8611250600
Download: ML20214G160 (1)


Text

.

  • ?

(T ,

k '

f v

  • <,\ UNITED STATES

[ ? . c ,f i NUCLEAR REGULATORY COMMISSION ,_

I

,,,, p ,j

3- WASHING TON, D. C. 20555 s r- k. . , .e

,,[4./a 1

'% , 0 2 MAY 1536 ,

L l

Docket Nos.: 50-369, 50-370~ -

J ~-'

'50-269,-50-270-50-287, 50-413 and n EW' "' .F Sl i

[d -.i)'

50-414 MAY 12 50 Mr. H. B. Tucker, Vice President -

Nuclear Production Department cuxEPowER00.

Duke Power Company ucgWNG __y 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

l

SUBJECT:

CATAWBA, OCONEE, AND MCGUIRE SOLID WASTE PROCESS CONTROL PROGRAMS In your Semi-Annual Radioactive Effluent Release Report dated March 1, 1985, you submitted to the NRC for information and evaluation the latest revision to the solid waste process control programs (PCPs) for your three nuclear generation stations, Catawba 1 and 2; Oconee 1, 2, and 3; and McGuire 1 and 2.

Our staff has reviewed the submitted process control programs and has found the PCPs to be acceptable for all the above generating stations. It is noted that the staff is developing Generic PCP guidelines that may be issued in the future. At that time, it may be necessary for Duke Power to revise the PCPs accordingly.

The technical basis for judging that the present PCP versions are acceptable I is provided in the enclosed safety evaluation report which concludes the i subject PCPs provide conformance with present requirements.

If you require any clarification of this matter, please contact the Catawba Project f4 nager, Kahtan Jabbour, at (301) 492-7367.

l Sincerely,

  • l T ... ~ ..

B. J. Youngblood, Director N. PWR Project Directorate #4 l Division of I'WR Licensing-A l

Enclosure:

As stated cc: See Next Page 8611200600 860 PDR ADOCK 050,0269 P FDR

.r.

% O t

!go atc,,, k (Q $

UNITED STATES

[ }. c.

'T. g

,, h

,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 r .'

%,,,',].ff

. 0 2 MAY 1536 ,

. b Docket Nos.: 50-369,' 50-370~ -

c'

'50-269,-50-270-50-287, 50-413 and [d D.V,F %))i 50-414 MAY t 2 15c Mr. H. B. Tucker, Vice President -

Nuclear Production Department CtJKE PO*5B CM-Duke Power Company LICEN$1NG 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

SUBJECT:

CATAWBA, OCONEE, AND MCGUIRE SOLID WASTE PROCESS CONTROL PROGRAMS In your Semi-Annual Radioactive Effluent Release Report dated March 1, 1985, you submitted to the NRC for information and evaluation the latest revision to the solid waste process control programs (PCPs) for your three nuclear generation stations, Catawba 1 and 2; Oconee 1, 2, and 3; and McGuire 1 and 2.

Our staff has reviewed the submitted process control programs and has found the PCPs to be acceptable for all the above generating stations. It is noted that the staff is developing Generic PCP guidelines that may be issued in the future. At that time, it may be necessary for Duke Power to revise the PCPs accordingly.

The technical basis for judging that the present PCP versions are acceptable is provided in the enclosed safety evaluation report which concludes the subject PCPs provide conformance with present requirements.

If you require any clarification of this matter, please contact the Catawba Project Manager, Kahtan Jabbour, at (301) 492-7367.

Sincerely, '

T ... w .

B. J. Youngblood, Director N. PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See Next Page 8611250600 8601 M PDR ADOCK 05000269 P PDR