ML20214G090

From kanterella
Jump to navigation Jump to search
Forwards NRC 860502 Approval of Util Process Control Program (PCP) for Incorporation Into Control Copies of PCP Manual
ML20214G090
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 07/09/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20214G092 List:
References
NUDOCS 8611250555
Download: ML20214G090 (1)


Text

-

rm DUKE POWER GOMPANY P.O. nox 33189 CHARLOTTE, N.O. 28242 HAL H. TUCKER retzenorm m.e....n

?Ni 7 a g, (704) ara-4nat

.m....-

July 9, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 D

Process Control T ogram

Dear Sir:

The Duke Power Company Corporate Process Control Program (PCP) requires that all changes to the PCP be sent to the NRC in the Semiannual Radiological Effluent Report. During the first half of 1986, no revisions were made to either the Corporate PCP or Oconee's site-specific PCP.

In May,1986 the NRC formally approved Duke Power's PCP for Oconee Nuclear Station.

A copy of the letter is required in the Oconee section of each control copy of the PCP manual. Please incorporate the attached copy of the approval letter into the Region II control copy of the PCP.

By copy of this letter, six copies of the attached letter are being forwarded to the NRC/0NRR.

Very truly yours.

4 h

Hal B. Tucker WHM: sib Attachment N

xc:

Ms. Helen Pastis Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Connaission Washington, D. C.

20555 Document. Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. J. C. Bryant 8611250555 860709 DR ADOCK 0500 9

NRC Resident Inspector Oconee Nuclear Station 3 (

YU f Officia Copy