ML20214L574

From kanterella
Revision as of 05:24, 19 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/86-21 & 50-364/86-21 on 861016-20.No Violations or Deviations Noted
ML20214L574
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/18/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20214L577 List:
References
NUDOCS 8612030122
Download: ML20214L574 (2)


See also: IR 05000348/1986021

Text

r

et

,

N f

NOV 181986

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

,

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-348/86-21 AND 50-364/86-21

This refers to the Nuclear Regulatory Consnission (NRC) inspection conducted by

R. W. Newsome on October 16-20, 1986. The inspection included a review of

activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

!

t

J i

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure: (See page 2)

8612030122 861118

DR ADOCK 0500 8

-01

L

r .

-

('

\l . NOV1gL9gg

~ Alabama Power Company 2

Enclosure:

NRC Inspection Report

jcc w/ encl:

y W. O. Whitt, Executive Vice President

f.D.Woodard,GeneralManager-

G. Hairston, III, General Manager -

[.NuclearPlant

.j Nuclear Support

VJ. W. McGowan, Manager-Safety Audit

h.andEngineeringReview

K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

cc w/ encl:

RC Resident Inspector

E. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

!

,

T

.

!

,

I

RII RII .- rihOp RI

, fv

RNewsome:bhg

dh

GHallstrom

L

B ke

%

AHerdt

AA

ance

11/s1/86 11/G/86 1/j$/86 11/[d/86 v11/p /86