Forwards Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909.Violations Noted.Enforcement Conference Scheduled for 881027 to Discuss Violations
ML20155E724
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/27/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20155E730 List:
References
NUDOCS 8810120389
Download: ML20155E724 (2)


See also: IR 05000369/1988029

Text

__ . . . . ._..__ _ _

.

<

. .

'1

SEP21)Q

Oocket Nos. 50-369, 50-370

License Nos. NPF-9, NPF-17

Duke Power Company

/ ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-369/88-29 AND 50-370/88-29

This refers to the Nuclear Pegulatory Commission (NRC) inspection conducted by

W. Orders, D. Nelson, and R. Croteau on August 29, 1988 - September 9, 1988.

The inspection included a review of activities authorized for your McGuire

facility. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinaticns of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violations described in the enclosed Inspection Report

are under consideration for escalated enforcement action. Accordingly, no

Notice of Violation is being issued at this time and no response to this letter

is required. However, please be advised that the number and characterization

of violations described in the enclosed Inspection Report may change as a

result of further NRC review. An Enforcement Conference to discuss these

violations has been scheduled for October 27, 1988. You will be advised by

separate correspondence of the resultc of our deliberations on this matter.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

Title 10 Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should .vou have any questions concerning this letter, please contact us.

Sincerely,

c?

_.

J./ tel on Giace

Regional Administrator

Enclosure: (See page 2)

001012o309 000927

PDR

0 ADOCK 05000369

PNU \\

7Lc/

'

~

- o

g j.,

Duke Power Company  ?

SEP 2 7198g

Enclosure:

NRC Inspection Report

Sc w/ encl:

vTy l. McConnell, Station Manager

%enior Resident inspector - Catawba

State of South Carolina

t;cc w/ encl:

WiRC Resident Inspector

ORS, Technical Assistant

VD. Hood, NRR

Document Control Desk

4 Lieberman, OE

RII Rll RII RI / RII

"cf?$.

BIonser:tm dd ,d 9/j

TPed'*lesh VB rownlee ec

/ /h 9

Kfnst

09/cM/88 69/7 } /88 09/27/88 07 88 g'09/t)/88

l

_