Forwards Rev 0 to PECO-COLR-P3C12, COLR for Pbaps,Unit 3, Reload 11,Cycle 12. COLR Submitted to NRC in Accordance W/ Pbaps,Unit 3 TS Section 5.6.5.d
ML20198P139
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/31/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198P144 List:
References
NUDOCS 9711060286
Download: ML20198P139 (2)


Text

SLClion Support Departm...t

-( TS 5.6.5.d PECO NUCLEAR ncor - c -

A' Unit of PECO Energy $$N7[ MEN'"

October 31,1997 Dodet No. 50 278 License No. DPR 56 U.S. Nuclear Regulatory Commission Attention: DocumentControlDesk Washington DC 20555

Subject:

Peach Bottom Atomic Power Station, Unit 3 lasuance of the Core Operating Umits Report for Reload 11, Cycle 12

Dear NRC Officials:

Enclosed is a copy of the Core Operating Umits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 3, Cycle 12, Reload 11 (Rev. 0). This COLR provides the cycle specific

erameter limits for. Maximum Avarage Planar Linear Heat Generation Rate (MAPLHGR); ARTS WPLHGR theimallimits multipliers; Single Loop Operation (SLO) MAPLHGR multipliers; Minimum Critical Power Ration (MCPR); ARTS MCPR thermallimit adjustments and multipliers; Single Loop Operation (SLO) MCPR adjustment; Rod Block Monitor (RBM) Analytical Umits, Allowable Values and MCPR Umits; Unear Heat Generation Rate (LHGR); and Turbine Bypass Valve Parameters.

These values have been determined using NRC-approved methodology and are established such that all applicable limits of the plant safety analysis are met.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 3 Technical Specifications (TS) Section 5.6.5.d.

if you have any questions, please do not hesitate to contact us.

Very truly yours, dd.4 3u4-G. A. Hunger, Jr, Aco/

Director. Licensing Enclosure cc: H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

R. S. Barkley, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) kDk $ 78 P PDR ,

t wr.p s .!!.h l l l

PECO Nuclear Fuel and Sonicos Olvision PEC0/.;0LA#3C12 P3C12 Core Operating Umns Report r age 21.Rw.0 i TABLE 4 i

l TURBINE BYPASS VALVE PARAMETERS Y t TURBIN5 BYPASS SYSTEM RESPONSE TIPJE 1

i Maximum delay time before start of bypass valte 2

opening following generation of the turbine bypass 0.10 sec.

i valve flow signal Maximum time after generation of a turbirie bypass 1

valve flow signal for bypass valve positlan to reach 0.30 sec.

80% of full flow (Includes the above rielay time) -

j Minimum required number of by,? ass valves to

maintain system oporr.bility 7