SLClion Support Departm...t
-(
TS 5.6.5.d PECO NUCLEAR ncor - c -
A' Unit of PECO Energy
$$N7[ MEN'"
October 31,1997 Dodet No. 50 278 License No. DPR 56 U.S. Nuclear Regulatory Commission Attention: DocumentControlDesk Washington DC 20555
Subject:
Peach Bottom Atomic Power Station, Unit 3 lasuance of the Core Operating Umits Report for Reload 11, Cycle 12
Dear NRC Officials:
Enclosed is a copy of the Core Operating Umits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 3, Cycle 12, Reload 11 (Rev. 0). This COLR provides the cycle specific
- erameter limits for. Maximum Avarage Planar Linear Heat Generation Rate (MAPLHGR); ARTS WPLHGR theimallimits multipliers; Single Loop Operation (SLO) MAPLHGR multipliers; Minimum Critical Power Ration (MCPR); ARTS MCPR thermallimit adjustments and multipliers; Single Loop Operation (SLO) MCPR adjustment; Rod Block Monitor (RBM) Analytical Umits, Allowable Values and MCPR Umits; Unear Heat Generation Rate (LHGR); and Turbine Bypass Valve Parameters.
These values have been determined using NRC-approved methodology and are established such that all applicable limits of the plant safety analysis are met.
This COLR is being submitted to the NRC in accordance with PBAPS, Unit 3 Technical Specifications (TS) Section 5.6.5.d.
if you have any questions, please do not hesitate to contact us.
Very truly yours, dd.4 u4-Aco/
3 G. A. Hunger, Jr, Director. Licensing Enclosure cc:
H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)
R. S. Barkley, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) kDk 78 P
PDR t wr. s
.!!.hl l p
l
PECO Nuclear Fuel and Sonicos Olvision PEC0/.;0LA#3C12 P3C12 Core Operating Umns Report r ge 21.Rw.0 a
i TABLE 4 i
l TURBINE BYPASS VALVE PARAMETERS Y
t TURBIN5 BYPASS SYSTEM RESPONSE TIPJE 1
i Maximum delay time before start of bypass valte 2
opening following generation of the turbine bypass 0.10 sec.
i valve flow signal Maximum time after generation of a turbirie bypass valve flow signal for bypass valve positlan to reach 0.30 sec.
1 80% of full flow (Includes the above rielay time) j Minimum required number of by,? ass valves to maintain system oporr.bility 7
.v4 5 i
=
t i
4 a
,m..,, -