ML20196E342

From kanterella
Revision as of 03:57, 13 November 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Confirms 880606 Telcon Between P Fredrickson & EA Bishop Re Enforcement Discretion for Facility Per 880606 & 07 Request. Discretion Permitted Initiation of Orderly Shutdown of Plant W/O Isolation of HPCI & RCIC
ML20196E342
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/14/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8807010601
Download: ML20196E342 (1)


Text

jy

' ' ~

~

^

i M . .. .; " g g .

JUN 141988 Docket Nos. 50-325, 50-324

' License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN: Mr. E. . E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551

-Ra%fgh, NC 27602 Gentlemen:

SUBJECT:

ENFORCEMENT DISCRETION - BRUNSWICK UNITS N0. 1 AND 2 This letter confirms the telephone conversation between Mr. P. Fredrickson, NRC Region II and Mr. E. A. Bishop, CP&L, on June 6,1988, concerning enforcement discretion for the Brunswick Units No. 1 and 2. Our action was based on your verbal request on June 6,1988, and documented in your letter dated June 7, 1988.

The discretion permitted the initiation of an orderly shutdown of Units 1 and 2 without isolation of HPCI and RCIC due to inoperable instrumentation to detect high steam flow greater than 300 percent.

Should.you have any questions concerning this letter, please contact us.

Sincerely, J. Nelson Grace Re?ional Administrator cc: P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: HRC Resident Inspector j DRS, Technical Assistant 1 '

Document Control Desk State of North Cat olina RI! RII 1 e R .

R RI RII DVe relli PFre eksaa son GJen ns 'A t 06/ /88 06/ 88 L ef /88 CC/ /f(/88 6/ /88 06/lV/88 8807010601 880614 h, $

PDR ADOCK 05000324 P DCD yJb f