ML20150D049

From kanterella
Revision as of 23:18, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Inspec Rept#50-395/78-22 on 781003-05 During Which No Items of Noncompliance Were Noted
ML20150D049
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/13/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20150D043 List:
References
781026, NUDOCS 7812040170
Download: ML20150D049 (2)


See also: IR 05000395/1978022

Text

.. .

.

a

  • ,

t

uNITEo sT ATEs

/g* #8Cv,og NUCLEAR REGULATORY COMMISSION

b 3 .p , o REC:oN 11

0 '-*- - $ 101 M ARIETT A sTR E ET. N.W.

  • ATL ANT A, GEORGI A 30303

o  !

% .' , . . * ' DCT ? 61978

In Reply Refer To:

RII:EJV e

50-395/78-22

South Carolina Electric and Gas Company

ATTN: Mr. M. C. Johnson, Vice President

and Group Executive-Special

Services and Purchasing

P. O. Box 764

Columbia, Sout h Carolina 29218

Gentlemen:

This refers to the inspection conducted by Mr. E. J. Vallish of

this office on October 3-5, 1978, of activities authorized by NRC

Const ruct ion Permit No. CPPR-94 for the V. C. Summer Nuclear Stat ion,

Unit 1 facility, and to the discussion of our findings held with

Mr. D. A. Nauman at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously

identified enforcement matters. These are discussed in the enclosed

inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this of fice to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be

.

placed in the Public Document Room.

1

'

781204of70

.

_ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ .

.

.

South Carolina Electric and Gas Company

-2- OCT 2 61978

Should you have any questions concerning this letter, we will be

glad to discuss them with you.

Sincerely,

Y Charles E. Murphy,

t*f '

Chief

/

y Reactor Construction and Engineering

Support Branch

Enclosures:

Inspection Report No. 50-395/78-22

cc w/enet:

Mr. Troy B. Conners, J r., Esquire

Conners, Moore and Corber

1747 Pennsylvania Avenue, N. W.

Washington, D. C. 20006

Mr. H. I. Donnelly, Jr.

Quality Assurance

P. O. Box 8

Jenkinsville, Sout h Carolina 29065

l

l