ML20151L541

From kanterella
Revision as of 05:11, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/88-23 & 50-364/88-23 on 880611- 0710 & Notice of Violation
ML20151L541
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/21/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20151L545 List:
References
NUDOCS 8808040072
Download: ML20151L541 (2)


See also: IR 05000348/1988023

Text

, . .

.L ,? .i ,

, ].

.

. I

JUL 21930

Docket Nos.' 50-348, 50-364-

License Nos. NPF-2 and NPF-8

Alabama-Power Company

ATTN: W. G. Hairston,.III

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-348/88-23 AND 50-364/88-23)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Bradford on June 11 thru July 10, 1988. The inspection included a review

of activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation. No violation is being cited for one of the violations since

this violation was identified by your staff and the criteria for

categorization of licensee identified violations were -met. The details

-pertaining to this violation are described in the inspection report.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

l will be placed in the NRC Public Document Room.

l Should you have any questions concerning this letter, please contact us.

Sincerely,

CRIGNA'. SND W

DAVID M. VPEU

David M. Verre111, Chief

$$k8000ck$$obb40 PNU Reactor Projects Branch 1

G _

Division of Reactor Projects

Enclosures: (See page 2)

1\

rEo /

______ - _ - - - _ _ _ __ -__ _ . _ _ _ ___ ____ - _ _

-

. .

,

'

<

.

- JUL % 1N

Alabama-Power Company 2

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encis:

B. M. Guthrie, Executive Vice President

R. P. Mcdonald, Executive Vice President

D. Morey, General Manager -

Nuclear Plant

J. D. Woodard, III, Vice President -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

bec w/encls:

Document Control Desk

NRC Resident Inspector

DRS, Technical Assistant

E. Reeves, Project Manager, NRR

State of Alabama

.

4M V

LModenos:tj ,

HDance

07/p /88 07/4 /88