ML20151N981

From kanterella
Revision as of 02:19, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Review of Rev 20 to Radiological Emergency Plan Completed.Plan Continues to Meet Planning Stds of 10CFR50.47(b) & Requirements of App E of 10CFR50
ML20151N981
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/26/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8601030261
Download: ML20151N981 (1)


Text

DEC 2 61995 j Carolina Power and Light Company v ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

DOCKET NOS. 50-325 AND 50-324 - BRUNSWICK STEAM ELECTRIC PLANT RADIOLOGICAL EMERGENCY PLAN REVIEW We have completed our review of Revision 20 of the Brunswick Radiological Emergency Plan.

Our review indicated that your Brunswick Radiological Emergency Plan continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your Plan which may decrease the effectiveness of the Plan. However, if your safety review indicates no decrease in the level of emergency preparedness, then changes can be made without NRC approval. In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Should your have any question regarding this letter, please contact Mr. T. Decker of our staff at 404/331-2600.

Sincerely, David M. Verre111, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: d P. W. Howe, Vice President d C. Brunswick R. Dietz Nuclear Project Plant General Manager bec: NRC Resident Inspector Document Control Desk State of North Carolina

[ Q )

ATabaka TDe er 0 Collins PFre rickson 12/// /85 12/ /85 12/.y/85 12/ /85 8601030261 e51226 7 PDR ADOCK 0 % %4

.ca3G 1

-. -.,