MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Meeting Summary
MONTHYEARML23345A1092023-12-14014 December 2023 December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2 ML23167A7012023-06-26026 June 2023 Summary of Public Meeting with VEPCO Concerning a License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21293A0992021-12-10010 December 2021 Meeting Summary for Draft Supplemental Environmental Impact Statement Public Meeting ML21221A3022021-10-18018 October 2021 June 24, 2021, Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary ML21221A3032021-10-18018 October 2021 June 24, 2021, Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000)- List of Attendees ML21239A0662021-09-0202 September 2021 August 27, 2021, Summary: Discussion Between NRC and Dominion Regarding the NAPS Subsequent License Renewal - an Inconsistency in Documentation Regarding RCP Code Case N-481 (EPID No. L-2020-SLR-0000) - Summary ML21236A0582021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - List of Attendees ML21236A0532021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary ML21221A0312021-08-27027 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21236A0512021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memo ML21221A0262021-08-26026 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20324A2592020-12-0303 December 2020 Scoping Meeting Summary ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML20104A0392020-04-21021 April 2020 Presubmittal Meeting Summary ML19190A2862019-07-16016 July 2019 Summary of July 7, 2019, Public Meeting with Dominion to Discuss Open Phase Condition RAI Responses ML19144A1292019-05-30030 May 2019 Summary of November 20, 2018, Pre Application Meeting with Dominion Energy Regarding the Planned License Amendment Request to Revise Emergency Action Levels ML19128A3432019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML18151A4682018-05-29029 May 2018 Public Meeting Summary - 2017 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML18066A0192018-03-16016 March 2018 Meeting Summary of October 4, 2017 Pre-Submittal Public Meeting to Discuss LAR Request Regarding Consolidation of the Emergency Operations Facilities ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16138A0752016-05-19019 May 2016 Summary of April 26, 2016, Pre-Application Teleconference with Virginia Electric and Power Company for Increase in Maximum Fuel Enrichment for the New Fuel Storage Racks and the Spent Fuel Pool ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15316A2522015-11-19019 November 2015 October 20, 2015, Millstone, Units 2 and 3, Surry, Units 1 and 2, North Anna, Units 1 and 2 - Summary of Pre-submittal Conference Call Regarding Emergency Action Level Scheme Changes ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13151A1282013-05-31031 May 2013 Public Meeting Summary - North Anna Power Station Docket Nos. 50-338 and 50-339 ML12131A5032012-05-0909 May 2012 5/1/2012 Summary of Category 1 Public Meeting Regarding the Annual Assessment of the North Anna Power Station ML12060A3682012-03-0101 March 2012 G20110668/EDATS: OEDO-2011-0622 - 02/02/12 - Meeting Summary for Meeting with Paul Gunter Et Al. Regarding Their 10 CFR 2.206 Petition to Suspend the Operating Licenses for North Anna Power Station, Unit Nos. 1 and 2 ML12060A3522012-03-0101 March 2012 G20110757/EDATS: OEDO-2011-0701 - 12/12/11 - Meeting Summary of Meeting with Paul Gunter Et Al. Regarding Their 10 CFR 2.206 Petition to Suspend the Operating Licenses (Ols) for North Anna 1 and 2 ML1131804092011-11-14014 November 2011 Public Meeting Summary - Status of Nrc'S Restart Review and Inspection - North Anna Power Station ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML1110304742011-04-13013 April 2011 Public Meeting/Open House Summary Letter ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020704582010-07-28028 July 2010 Summary of Meeting with VEPCO to Discuss Fuel Transition Licensing ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop ML0920801692009-08-0505 August 2009 Summary of Public Meeting with Duke Energy Carolinas, LLC to Discuss a Proposed Licensee Amendment Regarding the Emergency Core Cooling System Pump Room Exhaust Air Clean Up System (ECCS Preacs) ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station 2023-06-26
[Table view] |
Text
April 21, 2020 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 29060
SUBJECT:
PUBLIC MEETING
SUMMARY
OF PRE-SUBMITTAL MEETING FOR NORTH ANNA POWER STATION, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION
Dear Mr. Stoddard:
By letter dated November 9, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML17318A087), Virginia Electric and Power Company (Dominion, or the applicant), submitted a letter of intent to submit a subsequent license renewal application (SLRA) for North Anna Power Station, Units 1 and 2 (North Anna).
On April 9, 2020, the U.S. Nuclear Regulatory Commission (NRC, or the staff) held a public meeting with Dominion to discuss the expected content of the upcoming submittal of the SLRA for North Anna Power Station, Units 1 and 2. The slides for the staff presentation are available at ADAMS Accession No. ML20099F299. The slides for the applicants presentation are available at ADAMS Accession No. ML20099F241.
The NRC staff began with a brief overview of the subsequent license renewal (SLR) process. It consists of two tracks, environmental and safety. This meeting focused on the safety aspects.
(An environmental pre-submittal meeting was held on October 22, 2019. The meeting summary may be found at ADAMS Accession No. ML19297F844). A tentative review schedule was shared. Assuming an application date of September 30, 2020, the final licensing decision is expected to be made in March 2022, which is 18 months after submittal.
Dominion then began their presentation with a description of the North Anna Power Station and its similarities to its sister station, Surry Power Station (Surry). (The SLRA for Surry is under review. The Safety Evaluation Report has been issued (ADAMS Accession No. ML20052F520) and a licensing decision is expected in June 2020.) The applicant noted that the same team that has been working on the Surry application is developing the North Anna application. Many of the Aging Management Programs (AMPs) will be the same, since both plants use the fleet AMPs. North Anna will have a higher level of aging management review line item consistency with the Generic Aging Lessons-Learned Report (GALL-SLR, Vol. 1 and 2, ADAMS Accession Nos. ML17187A031 and ML17187A204).
The applicant went into further detail on the aging management programs. North Anna is expected to have 48 AMPs. This includes seven that were not part of their initial license
D. Stoddard renewal. Five AMPs are expected to have exceptions. As for enhancements,12 are expected to be consistent with GALL and have no enhancements; 13 are expected to have approximately four or less enhancements; and 11 are expected to have greater than four enhancements.
Dominion will be sharing the breakdown of which AMPs are in which category with the agency.
The applicant suggested that those three groupings of AMPs should have different levels of staff reviews (in terms of hours spent, inclusion in audits, length of audit breakout sessions, requests for additional information, etc.) due to the differing levels of complexity and similarity with Surry.
The NRC stated that they are open to the idea but will independently determine the appropriate level of review for each AMP based on the content of the submitted application.
Building upon a discussion from a prior industry-wide public meeting (SLR Lessons Learned, held on April 7, 2020. The meeting summary is available at ADAMS Accession No. ML20107F699.), the applicant listed nine AMPs in which they plan to include the revisions to the GALL-SLR that are currently under development by the staff. The applicant indicated that they would like additional feedback on the three interim staff guidance (ISG) documents that are italicized on the slide. For those three, it appears that staff and industry have not yet aligned on an approach. Dominion underscored that it will be important to them that the staff keeps to its expected schedule for issuing the related ISG documents for use and comment.
Several technical issues were then discussed in detail, the first of which was the flow tolerance evaluation for reactor coolant system cast austenitic stainless steel. As a conservative measure, the licensee will be performing the flow tolerance evaluation using two different methods, one each for a delta ferrite for check chemistry less than and greater than 25 percent.
The North Anna Unit 1 crossover leg ferrite content for ladle and check chemistry conditions is 24.57 percent and 28.29 percent, respectively. The flaw tolerance evaluation for the piping will include an evaluation for the check-chemistry-based ferrite content (greater than 25%) in accordance with Appendix C of the 2019 Edition of American Society of Mechanical Engineers Code,Section XI.
For the reactor internals AMP, the licensee is planning to submit a supplement after the initial application. The supplement will include information from the planned refueling outage in the fall as well as insights from a pre-publication copy of MRP-227, Revision 2, which they expect to see in the first quarter of calendar year 2021. It is not anticipated that the original submittal will be substantially changed on the basis of the expected new information and insights.
The reactor vessel support steel configuration is substantially similar between North Anna and Surry. However, the loads on the supports for North Anna will be calculated based on the original break open time. The applicant noted that most of the supporting documents for the review are virtually identical to those submitted for Surry, with only slight differences. Given the similarities, the licensee inquired whether the review for North Anna would require an onsite audit in this area, as was the case for Surry. The NRC indicated that they would have to see the content of the actual application before making that determination.
An Equivalent Margins Analysis for Reactor Vessel Integrity will be completed by the Pressurized Water Reactors Owners Group (PWROG) and submitted to the NRC for review in May 2020. A plant-specific report will be submitted for North Anna. In response to a staff question, the applicant clarified that this will be a different report than the one submitted for Surry because the two reactor vessels have different fabricators.
The environmentally assisted fatigue will be addressed differently for components/vessels and piping. The components and vessels will use the methodology from NUREG/CR-6909 (ADAMS
D. Stoddard Accession No. ML16319A004). Unlike Surry, the cumulative usage factor values for North Annas piping were determined by different reviewers at different times. For all of the technical topics described above, please see the licensees slides for more information, including details.
The presentation then went on to discuss other plant-specific time-limited aging analyses (TLAAs). The applicant noted that three PWROG reports will generically address TLAAs; however, one of the three reports does not yet have an approved safety evaluation from the staff. Finalization of that PWROG report has been affected by the Coronavirus; nevertheless, it is expected by May. The next slide listed documents that are to be docketed with the SLRA.
The applicant considers three of these to be the heart of the review: WCAP18363NP, Rev. 1, North Anna Units 1 and 2 Heatup and Cooldown Limit Curves for Normal Operation, March 2020; WCAP18353NP, Rev 0, Reactor Internals Fluence Evaluation for a Westinghouse 3 Loop Plant with Two Units, October 2018; and WCAP18364NP, Rev. 1, North Anna Units 1 and 2 TimeLimited Aging Analysis on Reactor Integrity for Subsequent License Renewal (SLR), March 2020. The following slide listed previously docketed documents that will be referenced in the application.
The applicant then provided closing remarks. During those remarks, the applicant noted that their application is ahead of schedule and that the staff, for planning purposes, can expect to receive the application approximately 30 days earlier than the sample schedule provided in the NRC staff slides. It is expected in the third quarter of 2020.
The NRC staff then inquired if there were any topics from the SLR lessons learned public meeting of April 7 (two days prior to this meeting) that the applicant would like to discuss in relation to North Anna. The applicant indicated that they would like to have further discussions related to the potential streamlining of the Operating Experience audits.
In general, throughout this meeting, the NRC and the applicant expressed willingness to embrace potential process improvements. Which improvements will be enacted and exactly how they will be enacted will depend on additional staff consideration, the outcome of discussions through the lessons-learned public meetings and other related public meetings, and the content of the application once received.
If you have any questions regarding this issue, please feel free to contact me by phone at 301-415-1056, or by email at Lauren.Gibson@nrc.gov.
Sincerely,
/RA/
Lauren K. Gibson, Project Manager License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosures:
List of Attendees
D. Stoddard
SUBJECT:
PUBLIC MEETING
SUMMARY
OF PRE-SUBMITTAL MEETING FOR NORTH ANNA POWER STATION, UNITS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION DATED APRIL 21, 2020 E-MAIL:
PUBLIC RidsNrrDnrl Resource RidsNrrPMSurry Resource AWu, NRR/DNRL DAdams, OCA LGibson, NRR/DNRL RHannah, RII/OPA EOesterle, NRR/DNRL JLedford, RII/OPA RElliott, NMSS/REFS JPelchat, RII/ORA HGonzalez, NRR/DNRL ELea, RII/ORA MMitchell, NRR/DNRL CRead, RII/DRP SBloom, NRR/DNRL BCollins, RII/DRS ABradford, NRR/DNRL SBailey, RII/DRS BCaldwell, NRR/DNRL SDowney, RII/DRS EMiller, NRR/DORL PCooper, RII/DRS MMarkley, NRR/DORL JQuichocho, OEDO DRoth, OGC MMcCoppin. OEDO SBurnell, HQ/OPA KGamin, OGC DMcIntyre, HQ/OPA ADAMS Accession Number: ML20104A039 *via email concurrence OFFICE NRR/DNRL/NLRP/PM NRR/DNRL/NLRP/LA NRR/DNRL/NLRP/PM NAME LKGibson* SGreen* AWu*
DATE 4/13/2020 4/13/2020 4/14/2020 OFFICE NRR/DNRL/NLRP/BC NRR/DNRL/NLRP/PM NAME EOesterle* LKGibson*
DATE 4/10/2020 4/21/2020 OFFICIAL RECORD COPY
List of Attendees All attendees participated remotely. Those with an asterisk (*) presented.
NRC Attendees: Christopher Sydnor Brian Allik George Thomas Steven Bloom John Tsao David Dijamco Lynnea Wilkins Carolyn Fairbanks Brandon Wise Bob Fitzpatrick Kent Wood James Gavula Angela Wu Lauren Gibson* George Wang Hipo Gonzalez On Yee Allen Hiser Mark Yoo Caroline Hsu Naeem Iqbal Dominion Attendees:
Steve Jones Paul Aitken*
Scott Krepel Eric Blocher*
Bryce Lehman John Disosway John Lehning Craig Heah*
Juan Lopez Jim Johnson Robert Lukes Keith Miller Tania Martinez Navedo Paul Phelps*
James Medoff Charles Tomes*
Seung Min Carol Moyer Public Attendes:
Duc Nguyen Joe Terrell (Duke Energy)
Eric Oesterle* Emma Wong (Electric Power Research Andrew Prinaris Institute, (EPRI))
David Rudland Additional unidentified attendees Mo Sadollah Enclosure