ML20127L179

From kanterella
Revision as of 16:25, 23 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SALP Repts 50-348/85-06 & 50-364/85-06 for Aug 1983 - Dec 1984.Overall Performance Satisfactory
ML20127L179
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/29/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20127L181 List:
References
NUDOCS 8506270779
Download: ML20127L179 (2)


See also: IR 05000348/1985006

Text

,' blf <n/ h

. 6YP

l'MR 291985

Alabama Power Compar.y

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT N05. 50-348/85-06 AND 50-364/85-06

The NRC Systematic Assessment of Licensee Performance (SALP) Board has completed

its periodic evaluation of the performance of your Farley facility. This facility

was evaluated for the period August 1, 1983 through December 31, 1984. The

results of the evaluation are documented in the enclosed SALP Board Report.

This report will be discussed with you at your Farley facility on April 11, 1985.

The performance of your Farley facility was evaluated in the functional areas of

plant operations, radiological controls, maintenance, surveillance, fire

protection, emergency preparedness, security, refueling, training, quality

programs and administrative controls affecting quality, and licensing activities.

A high level of performance has continued at your Farley facility. There was an

aggressive management posture towards nuclear safety. Strengths were noted by

the SALP Board in the areas of plant operations, radiological controls, mainten

ance, fire protection, emergency preparedness, refueling, training, and licensing

activities.

Any comments you have concerning our evaluation of the performance of your facility

should be submitted to this of fice within 30 days following the date of our

meeting at your Farley facility. Your comments (if any), a summary of our

April 11, 1985 meeting, and my disposition of your comments will be issued as an

appendix to the enclosed SALP Board Report.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/>/ [A4/xtl ('vw L

J. Nelson Grace

Regional Administrator

Enclosure:

SALP Board Report - Farley Units 1 and 2

cc w/ enc 1: (See page 2)

0,,506270779050k,E,onm

on ** 140 i

  • :ce c>l hg

W

b ,

,

Alabama Power Company 2

N R 20 1985

cc w/ enc 1:

W. O. Whitt, Executive Vice President

J. O. Woodard, Plant Manager

W. G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

H. O. Thrash, Manager, Nuclear Operations

and Administration

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ encl: <

Chairman Palladino

Chairman Roberts

Commissioner Asselstine

Commissioner Bernthal

Commissioner Zech

J. M. Taylor, IE

T. E. Murley, RI

J. G. Keppler, RIII

R. D. Martin, RIV

J. B. Martin, RV

-

J. A. Axelrad, IE

Records Center, INPO

Region II Distribution List C

D. S. Price, RII

T. C. MacArthur

E. Reeves, NRR

Document Control Desk

State of Alabama

NRC Resident Inspector

RII RIIn RII ) ,RII ,,o RII RII .

/X  %\ '

9 lM/~

KJ'u$

ni Jan:jw DPrice Kla is FCantrell DVerrolli JPuckett

3/13/JS 3/(4/85 34 /85 3/p/ /85 3/g//85 340/85

RI! R! RII RI!

% 0hU- l(l't?'/ \.

  1. Nhr 90e RWalker

'

J01 hinski

3/10/85 3/Sl/85 3/l+ '/85 3 /85