ML20108F090
From kanterella
Letter Sequence Meeting | |
---|---|
EPID:L-2020-LRM-0032, (Open) | |
MONTHYEARML20108F0902019-04-20020 April 2019
[Table View]April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna Project stage: Meeting 2019-04-20 |
ML20108F090 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Quad Cities, LaSalle |
Issue date: | 04/20/2019 |
From: | Blake Purnell Plant Licensing Branch III |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
Purnell B | |
References | |
EPID L-2020-LRM-0032 | |
Download: ML20108F090 (5) | |
Similar Documents at Calvert Cliffs, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Quad Cities, LaSalle | |
---|---|
Category:Meeting Summary
MONTHYEARML24009A0552024-01-24024 January 2024
[Table view]Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23352A0592024-01-0909 January 2024 Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23236A5132023-08-31031 August 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request ML23234A2342023-08-29029 August 2023 Summary of August 18, 2023, Meeting with Constellation Energy Generation, LLC, Related to the LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23237A2692023-08-25025 August 2023 Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23173A0072023-06-22022 June 2023 Summary of the Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A2802023-03-28028 March 2023 Summary of February 23, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23068A3762023-03-16016 March 2023 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 ML23030A0092023-02-10010 February 2023 January 10, 2023, Summary of Meeting with Constellation Energy Generation, LLC, on Planned Limerick Digital Modernization Project Installation Support License Amendment Request and Exemption Request ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests ML22346A0002022-12-14014 December 2022 Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69 ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests ML22318A1712022-11-16016 November 2022 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment to Revise the Design Basis for Certain Suppression Pool Structures and Components ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22227A1112022-08-25025 August 2022 Summary of June 24, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22168A1922022-06-24024 June 2022 Summary of May 3, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22158A3102022-06-0808 June 2022 Summary of May 31, 2022, Public Outreach to Discuss NRC 2021 End of Cycle Performance Assessment of Dresden Power Station, Units 2 and 3, and Quad Cities Power Station, Units 1 and 2 ML22159A2272022-06-0808 June 2022 Summary of May 10, 2022, Pre-Application Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, Llc, Regarding a Proposed License Amendament Request (Lar) for Calvert Cliffs Nuclear Power Plant ML22144A0202022-05-26026 May 2022 Summary of Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Proposed Alternative for Examinations of Certain Pressurizer Welds at Calvert Cliffs ML22140A2912022-05-23023 May 2022 Summary of Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Clinton, Unit 1, and Lasalle, Units 1 and 2 ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML22066A0012022-03-22022 March 2022 Summary, January 10, 2022, Closed Meeting with Exelon Generation Company, Llc, Proposed Relief Request for Alternative Repair of Buried Saltwater Piping with Carbon Fiber Reinforced Polymer Composite System ML22060A0782022-03-0707 March 2022 Summary of Meeting with Constellation Energy Generation, LLC Regarding a Proposed Alternative to Extend the In-service Inspection Intervals 2024-01-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20108F090&oldid=2913141"