Forwards IE Insp Rept 50-348/79-23 on 790604-08.No Noncompliance Noted
ML20125A744
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/22/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML20125A747 List:
References
NUDOCS 7908170195
Download: ML20125A744 (2)


See also: IR 05000348/1979023

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..___

_

. ._

,

,

fj

  1. 9 >* * * coq'o UNITED STATES / ,

,

! 'y4 y.. gf

g,.vy"*d,[.g

NUCLEAR REGULATORY COMMISSION )

e REGION 11

0, sd 101 MARtE TT A sT., N.W.. sulTE 310e

% .... .'h

Ac o AT LANTA. GEORGIA 30303

JUN k 21979

In Reply Refer To:

RII:AKH

50-348/79-23

Alabama Power Company

ATTN: F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by A. K. Hardin of this office on

June 4-8, 1979, of activities authorized by NRC License No. NPF-2 for the

Farley Unit I facility, and to the discussion of cur findings held with

W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection reporc. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, at.d observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the info-mation is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document, If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions coi.c r. ng this letter, we will be glad to

discuss them with you.

Sincerely,

[.C.

R. C. ewis, Acting Chief

Reactor Operations and Nuclear

Sup; ort Branch

~

-

7908170n5

' -

_ , , ,

'

> * -

[ . . . .

.. .

'

. .

.

Alabama Power Company -2-

JUN 2 21979

Enclosure:

Inspection Report No. 50-348/79-23

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III'

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor-

P. O. Box U

Ashford, AL 36312

.

t