Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8851999-10-0808 October 1999 Informs of Staff Determination That Listed Calculations Should Be Withheld from Public Disclosure,Per 10CFR2.790, as Requested in 990909 Affidavit ML20211J7731999-08-31031 August 1999 Forwards Insp Rept 50-312/99-03 on 990802-06.No Violations Noted.Insp Included Decommissioning & Dismantlement Activities,Verification of Compliance with Selected TS & Review of Completed SEs ML20211H7481999-08-13013 August 1999 Forwards Amend 126 to License DPR-54 & Safety Evaluation. Amend Changes Permanently Defueled Technical Specification (PDTS) D3/4.1, Spent Fuel Pool Level, to Replace Specific Reference to SFP Level Alarm Switches with Generic Ref 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20207E9181999-05-27027 May 1999 Informs That Effective 990328,NRR Underwent Reorganization. within Framework of Reorganization,Div of Licensing Project Mgt Created.Reorganization Chart Encl ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20206U7411999-05-18018 May 1999 Provides Summary of 990217-18 Visit to Rancho Seco Facility to Become Familar with Facility,Including Onsite ISFSI & Meeting with Representatives of Smud to Discuss Issues Re Revised Rancho Seco Ep,Submitted to NRC on 960429 ML20206M1611999-05-10010 May 1999 Forwards Listed Proprietary Calculations to Support Review of Rancho Seco ISFSI Sar.Proprietary Encls Withheld ML20206E8591999-04-12012 April 1999 Provides Info Re High Total Coliform Result in Plant Domestic Sewage Effluent Prior to Confluence with Combined Effluent.Cause of High Total Coliform Result Was Broken Flow Rate Instrument.Instrument Was Repaired on 990318 ML20204H6751999-03-19019 March 1999 Forwards Insp Rept 50-312/99-02 on 990309-11.No Violations Noted.Portions of Physical Security & Access Authorization Programs Were Inspected ML20204E4031999-03-16016 March 1999 Submits Rept of Status of Decommissioning Funding for Rancho Seco,As Required by 10CFR50.75(f)(1).Plant Is Currently in Safstor, with Operating License Scheduled to Expire in Oct 2008 ML20204E6441999-03-11011 March 1999 Forwards Individual Monitoring Repts for Personnel That Required Radiation Exposure Monitoring During 1998 ML20204E6661999-03-11011 March 1999 Forwards Rancho Seco Exposure Rept for Individuals That Received Greater than 100 Mrem During 1998,IAW TS D6.9.2.2 & NRC Regulatory Guide 1.16 ML20207L1711999-03-10010 March 1999 Informs of Staff Determination That Supporting Calculations & Drawings Contained in Rev 2 of Sar, Should Be Withheld from Public Disclosure,Per 10CFR2.790 NL-99-002, Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3)1999-03-10010 March 1999 Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20207D4431999-03-0101 March 1999 Forwards Annual Radioactive Effluent Release Rept, for Rancho Seco Nuclear Generating Station for 1998 ML20207H6181999-02-18018 February 1999 Provides Attached Metrix & Two Copies of Rancho Seco ISFSI Sar,Rev 2 on Compact Disc,As Requested in 990209 Meeting. First Rounds of RAIs Dealt Primarily with Use of Cask as Storage Cask.Without Compact Disc ML20203D0761999-02-10010 February 1999 Ltr Contract:Task Order 37 Entitled, Technical Assistance in Review of New Safety Analysis Rept for Rancho Seco Spent Fuel Storage Facility, Under Contract NRC-02-95-003 ML20155D4431998-10-27027 October 1998 Forwards Amend 3 to Rancho Seco Dsar,Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode.With Instructions & List of Effective Pages NL-98-032, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1998-09-30030 September 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20237A6031998-08-0707 August 1998 Forwards Insp Rept 50-312/98-03 on 980706-09.No Violations Noted ML20237A9481998-08-0303 August 1998 Forwards Smud 1997 Annual Rept, IAW 10CFR50.71(b),which Includes Certified Financial Statements ML20236J6331998-06-30030 June 1998 Forwards Response to Violations Noted in Insp Rept 50-312/98-02.Corrective Actions:Util Revised RSAP-1003 to Clarify District Security Staff Responsibilities Re Handling & Review of Criminal History Info ML20236E8211998-06-0303 June 1998 Forwards Insp Rept 50-312/98-02 on 980519-21 & NOV Re Failure to Review & Consider All Info Obtained During Background Investigation.Areas Examined During Insp Also Included Portions of Physical Security Program ML20217G8391998-04-20020 April 1998 Forwards Copy of Rancho Seco Monthly Discharger Self-Monitoring Rept for Mar 1998 ML20217H0451998-03-18018 March 1998 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1997,per TS D6.9.2.2 & Guidance Contained in Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1997 ML20217G6661998-03-18018 March 1998 Forwards Discharge Self Monitoring Rept for Feb 1998, Which Makes Note of One Wastewater Discharge Permit Violation ML20217F1891998-03-18018 March 1998 Forwards Signed Original & Amend 7 to Rancho Seco Long Term Defueled Condition Physical Security Plan & Rev 4 to Long Term Defueled Condition Training & Qualification Plan.Encls Withheld,Per 10CFR2.790 ML20216K1091998-03-11011 March 1998 Forwards NRC Form 5 Individual Monitoring Repts for Personnel Who Required Radiation Exposure Monitoring,Per 10CFR20.1502 During 1997.W/o Encl ML20217N9531998-03-0505 March 1998 Responds to Violations Noted in Insp Rept 50-312/98-01. Corrective Actions:Radiation Protection Group Wrote Potential Deviation from Quality (Pdq) 97-0082 & Assigned Radiation Protection Action to Determine Cause & CAs ML20203H7001998-02-25025 February 1998 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997, IAW 10CFR50.36a(a)(2) & TS D6.9.3.Revs to Radiological Environ Monitoring Manual & off-site Dose Calculation Manual,Encl NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3)1998-02-12012 February 1998 Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) ML20202G0131998-02-12012 February 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements & Master Worker Policy Certificate of Insurace for Facility ML20202C4641998-02-0505 February 1998 Forwards Insp Rept 50-312/98-01 on 980105-08 & Notice of Violation.Insp Included Decommissioning & Dismantlement Work Underway,Verification of Compliance W/Selected TS & Main & Surveillance Activities Associated W/Sfp ML20199A5881997-11-10010 November 1997 Responds to NRC Re Violations Noted in Insp Rept 50-312/97-01.Corrective Actions:Reviewed SFP Water Temp & Instrument Calibr Records,Generated Otr 97-001 to Document out-of-tolerance Instrument & Generated Pdq 97-0064 ML20198R9501997-11-0505 November 1997 Requests Interpretation of or Rev to NUREG-1536, Std Review Plan for Dry Cask Storage Sys, Re Compliance W/ 10CFR72.236(e) & 10CFR72.122(h)(4) for Dry Fuel Storage Casks ML20198K5391997-10-21021 October 1997 Forwards Insp Rept 50-312/97-04 on 970922-25 & Notice of Violation.Response Required & Will Be Used to Determine If Further Action Will Be Necessary ML20217D3101997-09-25025 September 1997 Forwards Update of 1995 Decommissioning Evaluation, for Rancho Seco Nuclear Generation Station & Annual Review of Nuclear Decommissioning Trust Fund for Adequacy Re Assumptions for Inflation & Rate of Return ML20211F0991997-09-23023 September 1997 Forwards One Certified Copy of Mutual Atomic Energy Liability Underwriters Nuclear Energy Liability Insurance Endorsement 120 for Policy MF-0075 for Smud Rancho Seco Nuclear Facility ML20198G8141997-08-22022 August 1997 Forwards Amend 125 to License DPR-54 & Safety Evaluation. Amend Permits Smud to Change TS to Incorporate Revised 10CFR20.Amend Also Revises References from NRC Region V to NRC Region IV ML20151L0281997-07-29029 July 1997 Provides Response to NRC Request for Addl Info Re TS Change,Relocating Administrative Controls Related to QA to Ufsar,Per NUREG-0737 ML20149E5031997-07-10010 July 1997 Second Partial Response to FOIA Request for Documents. Forwards Records Listed in App C Being Made Available in Pdr.Records in App D Already Available in PDR ML20148P5161997-06-30030 June 1997 Second Partial Response to FOIA Request for Documents.App B Records Being Made Available in PDR ML20141A1721997-06-17017 June 1997 Forwards Insp Rept 50-312/97-03 on 970603-05.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program NL-97-030, Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs1997-05-13013 May 1997 Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs ML20140G6341997-05-0707 May 1997 Forwards ERDS Implementation Documents Including Data Point Library Updates for McGuire Number 224,WNP2 Number 225, Beaver Valley Number 226 & Calvert Cliffs Number 227. W/O Encl 1999-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20206M1611999-05-10010 May 1999 Forwards Listed Proprietary Calculations to Support Review of Rancho Seco ISFSI Sar.Proprietary Encls Withheld ML20206E8591999-04-12012 April 1999 Provides Info Re High Total Coliform Result in Plant Domestic Sewage Effluent Prior to Confluence with Combined Effluent.Cause of High Total Coliform Result Was Broken Flow Rate Instrument.Instrument Was Repaired on 990318 ML20204E4031999-03-16016 March 1999 Submits Rept of Status of Decommissioning Funding for Rancho Seco,As Required by 10CFR50.75(f)(1).Plant Is Currently in Safstor, with Operating License Scheduled to Expire in Oct 2008 ML20204E6441999-03-11011 March 1999 Forwards Individual Monitoring Repts for Personnel That Required Radiation Exposure Monitoring During 1998 ML20204E6661999-03-11011 March 1999 Forwards Rancho Seco Exposure Rept for Individuals That Received Greater than 100 Mrem During 1998,IAW TS D6.9.2.2 & NRC Regulatory Guide 1.16 NL-99-002, Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3)1999-03-10010 March 1999 Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20207D4431999-03-0101 March 1999 Forwards Annual Radioactive Effluent Release Rept, for Rancho Seco Nuclear Generating Station for 1998 ML20207H6181999-02-18018 February 1999 Provides Attached Metrix & Two Copies of Rancho Seco ISFSI Sar,Rev 2 on Compact Disc,As Requested in 990209 Meeting. First Rounds of RAIs Dealt Primarily with Use of Cask as Storage Cask.Without Compact Disc ML20155D4431998-10-27027 October 1998 Forwards Amend 3 to Rancho Seco Dsar,Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode.With Instructions & List of Effective Pages NL-98-032, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1998-09-30030 September 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20237A9481998-08-0303 August 1998 Forwards Smud 1997 Annual Rept, IAW 10CFR50.71(b),which Includes Certified Financial Statements ML20236J6331998-06-30030 June 1998 Forwards Response to Violations Noted in Insp Rept 50-312/98-02.Corrective Actions:Util Revised RSAP-1003 to Clarify District Security Staff Responsibilities Re Handling & Review of Criminal History Info ML20217G8391998-04-20020 April 1998 Forwards Copy of Rancho Seco Monthly Discharger Self-Monitoring Rept for Mar 1998 ML20217H0451998-03-18018 March 1998 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1997,per TS D6.9.2.2 & Guidance Contained in Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1997 ML20217F1891998-03-18018 March 1998 Forwards Signed Original & Amend 7 to Rancho Seco Long Term Defueled Condition Physical Security Plan & Rev 4 to Long Term Defueled Condition Training & Qualification Plan.Encls Withheld,Per 10CFR2.790 ML20217G6661998-03-18018 March 1998 Forwards Discharge Self Monitoring Rept for Feb 1998, Which Makes Note of One Wastewater Discharge Permit Violation ML20216K1091998-03-11011 March 1998 Forwards NRC Form 5 Individual Monitoring Repts for Personnel Who Required Radiation Exposure Monitoring,Per 10CFR20.1502 During 1997.W/o Encl ML20217N9531998-03-0505 March 1998 Responds to Violations Noted in Insp Rept 50-312/98-01. Corrective Actions:Radiation Protection Group Wrote Potential Deviation from Quality (Pdq) 97-0082 & Assigned Radiation Protection Action to Determine Cause & CAs ML20203H7001998-02-25025 February 1998 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997, IAW 10CFR50.36a(a)(2) & TS D6.9.3.Revs to Radiological Environ Monitoring Manual & off-site Dose Calculation Manual,Encl ML20202G0131998-02-12012 February 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements & Master Worker Policy Certificate of Insurace for Facility NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3)1998-02-12012 February 1998 Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) ML20199A5881997-11-10010 November 1997 Responds to NRC Re Violations Noted in Insp Rept 50-312/97-01.Corrective Actions:Reviewed SFP Water Temp & Instrument Calibr Records,Generated Otr 97-001 to Document out-of-tolerance Instrument & Generated Pdq 97-0064 ML20198R9501997-11-0505 November 1997 Requests Interpretation of or Rev to NUREG-1536, Std Review Plan for Dry Cask Storage Sys, Re Compliance W/ 10CFR72.236(e) & 10CFR72.122(h)(4) for Dry Fuel Storage Casks ML20217D3101997-09-25025 September 1997 Forwards Update of 1995 Decommissioning Evaluation, for Rancho Seco Nuclear Generation Station & Annual Review of Nuclear Decommissioning Trust Fund for Adequacy Re Assumptions for Inflation & Rate of Return ML20211F0991997-09-23023 September 1997 Forwards One Certified Copy of Mutual Atomic Energy Liability Underwriters Nuclear Energy Liability Insurance Endorsement 120 for Policy MF-0075 for Smud Rancho Seco Nuclear Facility ML20151L0281997-07-29029 July 1997 Provides Response to NRC Request for Addl Info Re TS Change,Relocating Administrative Controls Related to QA to Ufsar,Per NUREG-0737 NL-97-030, Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs1997-05-13013 May 1997 Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs ML20138F5321997-04-28028 April 1997 Forwards Response to RAI Re License Amend 192,updating Cask Drop Design Basis Analysis,Per NRC 960510 Request for Addl Info on 960318 Application NL-97-027, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility1997-04-17017 April 1997 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility ML20137W8091997-03-20020 March 1997 Forwards Biennial Update to Rancho Seco Post-Shutdown Decommissioning Activities Rept ML20137S3571997-03-19019 March 1997 Provides Notification of Use of Revised Quality Manual for Activities Re Rancho Seco ISFSI ML20137D0981997-03-18018 March 1997 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1996.Provided IAW TS D6.9.2.2 & Guidance Contained in NRC Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1996 ML20137D1221997-03-18018 March 1997 Submits,Iaw 10CFR20.2206 & TS D6.9.2.1,1996 NRC Form 5 Individual Monitoring Repts for Personnel Requiring Radiation Exposure Monitoring Per 10CFR20.1502 During 1996. W/O Encl NL-97-012, Submits Rept of Listed Current Levels of Property Insurance for Plant,Iaw 10CFR50.54(w)(3)1997-02-11011 February 1997 Submits Rept of Listed Current Levels of Property Insurance for Plant,Iaw 10CFR50.54(w)(3) ML20138L1091997-01-29029 January 1997 Informs of Schedule Change Re Decommissioning of Rancho Seco.Incremental Decommissioning Action Plan,Encl NL-97-005, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility1997-01-22022 January 1997 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility NL-96-056, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1996-12-16016 December 1996 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20134E0041996-10-23023 October 1996 Forwards Response to NRC GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks ML18102B6871996-08-0606 August 1996 Informs That Util Will Revise Loading & Unloading Procedures & Operator Training as Necessary ML20149E4491994-05-16016 May 1994 Forwards 1993 Annual Rept of Sacramento Municipal Utility District,For Info ML20029E4601994-05-12012 May 1994 Forwards Response to NRC Bulletin 94-001, Potential Fuel Pool Drain-Down Caused by Inadequate Maint Practices at Dresden Unit 1. Util Plans to Move Spent Fuel Into Proposed Rancho Seco ISFSI by 1998 ML20149E3971994-05-10010 May 1994 Forwards Re Updated Decommissioning Cost Estimate for Rancho Seco & Attached Rept by Tlg Engineering,Inc. W/Svc List ML20029D3531994-04-28028 April 1994 Forwards Documents S11-25-003, Update of 1991 Decommissioning for Rancho Seco Nuclear Generating Station NL-94-008, Forwards Endorsement 118 to Nelia Policy NF-0212 & Endorsement 106 to Maelu Policy MF-00751994-04-28028 April 1994 Forwards Endorsement 118 to Nelia Policy NF-0212 & Endorsement 106 to Maelu Policy MF-0075 1999-07-07
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5431990-09-20020 September 1990 Requests Exemptions from Certain Requirements of 10CFR50.47(b) & 50,App E & Proposes New Emergency Plan That Specifically Applies to Long Term Defueled Condition ML20059J9161990-09-13013 September 1990 Notification of Change in Operator/Senior Operator Status for R Groehler,Effective 900907 ML20059J9221990-09-13013 September 1990 Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components. No Vendor Interface Exists for Spent Fuel Pool Liner NL-90-442, Forwards Endorsements 13 to Nelia Certificate N-49 & Maelu Certificate M-49,Endorsements 91 & 92 to Maelu Policy MF-75 & Endorsements 103 & 104 to Nelia Policy NF-2121990-09-12012 September 1990 Forwards Endorsements 13 to Nelia Certificate N-49 & Maelu Certificate M-49,Endorsements 91 & 92 to Maelu Policy MF-75 & Endorsements 103 & 104 to Nelia Policy NF-212 ML20059G0791990-09-0606 September 1990 Forwards Supplemental Fitness for Duty Performance Data, Omitted from 900725 Rept Re Random Drug Testing Results ML20059E0031990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept,Jan- June 1990, Corrected Repts & Revs to ODCM ML20059C2491990-08-27027 August 1990 Advises That M Foster & B Rausch Leaving Util Effective on 900810 & 17,respectively & Will No Longer Require Active Operator Licenses ML20056B2591990-08-20020 August 1990 Forwards Long-Term Defueled Condition Security Training & Qualification Plan. Encl Withheld (Ref 10CFR2.790) ML20056B2961990-08-10010 August 1990 Discusses 900731 Meeting Re Future of Util & Closure & Decommissioning of Facility.Request for Possession Only License Pending Before Commission ML20058Q2811990-08-0909 August 1990 Forwards Updated Listing of Commitments & long-range Scope List Items Deferred or Closed by Commitment Mgt Review Group Since Last Update ML20058N0911990-08-0707 August 1990 Notifies of Minor Change in List of Tech Specs Applicable in Plant Defueled Condition.Determined That Surveillance Requirements Table 4.1-1,Item 63 Not Required to Be Included in List of Tech Specs Applicable in Defueled Condition ML20056A1131990-07-30030 July 1990 Apprises of Status of Plans to Use 3 of 4 Emergency Diesel Generators as Peaking Power Supplies & Responds to Questions in .Util Obtained Authorization for Operation of Diesel Generators for No More than 90 Days Per Yr ML20056A2041990-07-30030 July 1990 Provides Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. Pressure & Differential Pressure Transmitters 1153 & 1154 Do Not Perform Any safety-related Function in Current Plant Mode ML20055J0331990-07-25025 July 1990 Notifies of Change in Operator/Senior Operator Status. Operators Terminating Employment & No Longer Require License ML20055J0311990-07-25025 July 1990 Forwards fitness-for-duty Performance Data for Facility from 900103-0630 ML20055H8081990-07-24024 July 1990 Forwards Decommissioning Financial Plan for Plant,Per 10CFR50.33(k)(2) & Requests Interim Exemption Re Requirement to Have Full Decommissioning Funding at Time of Termination of Operation,Per 10CFR50.12 ML20055H7561990-07-24024 July 1990 Requests Exemption from Performing Annual Exercise of Emergency Plan,Activation of Alert & Notification Sys & Distribution of Public Info Brochures,Per 10CFR50.12 Requirements ML20055F8421990-07-13013 July 1990 Forwards Application for Proposed Decommissioning of Plant. Util Needs Relief from Equipment Maint,Surveillance,Staffing & Other Requirements Not Necessary to Protect Public Health & Safety During Defueled Condition ML20044B2041990-07-12012 July 1990 Forwards Rev 0 to Decomir 90-0194, Plan for Ultimate Disposition of Rancho Seco Nuclear Generating Station ML20055G9821990-07-12012 July 1990 Advises That Environ Exposure Controls Action Plan Will Be Provided by Sept 1990,per Insp Rept 50-312/90-02 ML20055E5111990-07-0606 July 1990 Notifies of Change in Operator/Senior Operator Status for D Rosenbaum & M Cooper,Effective 900622 & 29,respectively ML20044A0681990-06-22022 June 1990 Advises That Util Will Submit Plan for Ultimate Disposition of Plant by Latter Part of Jul 1990,per 900613 Request ML20043G5441990-06-12012 June 1990 Responds to Generic Ltr 90-01 Re Implementation Status of Generic Safety Issues.Plant Currently in Defueled Condition & NRC Has Issued License Amend Prohibiting Moving Fuel Into Reactor Bldg W/O Prior Approval of NRC ML20043G9521990-06-12012 June 1990 Notifies of Organizational Changes.Svc List Should Be Revised as Listed ML20043G5701990-06-12012 June 1990 Forwards NSHC for long-term Defueled Condition of Plant for Security Plan,Per Util .As Discussed W/Nrc During Telcon,Determination Made That NSHC Needed to Be Processed in Support of Security Plan ML20043E8191990-06-0606 June 1990 Requests Withdrawal of 900510 Request for Exemption from GDC 17, Electric Power Sys. Util Understands That Formal Exemption Not Required,Based on Discussions W/Nrc.Info on Plans Re Diesel Generator Operation Also Provided ML20043E1691990-05-25025 May 1990 Forwards Refinement List of Tech Specs Applicable in Defueled Condition,Per .Unless NRC Differs W/ Approach,Conduct of Activities in Defueled Condition Will Proceed Until Amend 182,Rev 1 Approved ML20043A9591990-05-15015 May 1990 Responds to Questions Re Request for Interim Relief from Tech Spec 4.20, Gaseous Effluent Sys Flow Rate Devices. Auxiliary Bldg Sys Fans & grade-level Vents Equipped W/ Motors Having 1.0 Svc Factor ML20042G9821990-05-10010 May 1990 Requests Temporary Exemption from General Design Criteria 17, Electrical Power Sys as Applicable to Use of Diesel Generator Sets as Peaking Power Supplies.Request Based on Special Circumstances in 10CFR50.12(a)(2)(ii) & (iv)-(vi) ML20043A6031990-05-0909 May 1990 Forwards Rev 0 to Technical Svcs Administrative Procedure TSAP-4400, Environ Qualification Program. No Irreversible Action Has Been or Will Be Taken Until NRC Grants Specific Relief or Authorized Decommissioning ML20042F9431990-05-0707 May 1990 Responds to Violation Noted in Insp Rept 50-312/90-03. Corrective Actions:Operations Dept Implemented Action Plan to Improve Operator Performance & Procedures A.20 & A.21 Revised to Contain Explicit Steps to Ensure Valve Alignment 05000312/LER-1990-001, Forwards Errata to LER 90-001-00,re Inoperable Radioactive Gaseous Effluent Monitoring Instrumentation Not Reported in Semiannual Radioactive Effluent Release Rept Due to Procedural Deficiencies,To Include Rept Date1990-05-0202 May 1990 Forwards Errata to LER 90-001-00,re Inoperable Radioactive Gaseous Effluent Monitoring Instrumentation Not Reported in Semiannual Radioactive Effluent Release Rept Due to Procedural Deficiencies,To Include Rept Date ML20042F3421990-04-26026 April 1990 Forwards Long Term Defueled Condition Security Plan.Plan Withheld (Ref 10CFR2.790) ML20042F6121990-04-26026 April 1990 Forwards Rancho Seco Emergency Plan Change 4 Long-Term Defueled Condition. New Plan Includes Provisions Necessary for Protection of Onsite Personnel & for Protection of Public Via Communication W/Offsite Agencies ML20034C4081990-04-24024 April 1990 Forwards Rev 5 to Sections 1 & 8 of Plant Emergency Plan,Per NRC Requesting Two Changes ML20034A9721990-04-19019 April 1990 Requests Extension of Date of Submission of 1989 Annual Radiological Environ Operating Rept to 900615.Extension Necessary Due to Legal Dispute Over Payment W/Contractor for Analysis of Environ Monitoring Samples NL-90-143, Responds to Generic Ltr 89-13 Re Svc Water Problems Affecting safety-related Equipment.Routine Sys Walkdowns Performed by Operations Personnel to Ensure Sys Parameters within Required Range1990-04-17017 April 1990 Responds to Generic Ltr 89-13 Re Svc Water Problems Affecting safety-related Equipment.Routine Sys Walkdowns Performed by Operations Personnel to Ensure Sys Parameters within Required Range ML20034B6701990-04-13013 April 1990 Forwards Quarterly Update of Emergency Response Telephone Directory.Directory Withheld ML20034A2721990-04-12012 April 1990 Requests Interim Relief from Tech Spec 3.2.2 Re Low Temp Overpressure Protection,Based on Defueled Plant Condition. Relief Would Permit Util to Preserve RCS in Wet Condition to Ensure Overpressure Protection ML20034A3731990-04-11011 April 1990 Requests Exemption from Full Cost of Annual Fees,Per 10CFR171.11,based on Defueled Plant Condition ML20042E0941990-04-10010 April 1990 Advises That Util Intends to Submit EIS Associated W/Plant Decommissioning After Submittal of Decommissioning Plan ML20034A1511990-03-30030 March 1990 Notifies That Ma Rodger Leaving District & No Longer Need Operator License OP-50303,effective 900330 ML20042E4961990-03-30030 March 1990 Forwards Special Repts 90-06 & 90-07 Re Fire Barriers Breached More than 7 Days & Inoperable Fire Detector, Respectively.Fire Barrier Penetrations & Detector Returned to Operable Status ML20033G5981990-03-30030 March 1990 Forwards Mods to Plant Operator Training Program Submitted on 891228,in Response to Requesting Addl Info ML20012D7711990-03-28028 March 1990 Responds to NRC 900205 Comments on Util Discussing Tech Specs Applicable to Defueled Condition.Util Intends to Keep Area Radiation Monitor R15028 Functional at All Times.Spent Fuel Pool Bulk Temp Maintained at 80 F ML20033F8891990-03-27027 March 1990 Forwards Effluent & Water Mgt Project Action Plan to Address Current Effluent & Water Mgt Concerns.Util Closing Out Effluents & Water Mgt Project Action Plan ML20012E2751990-03-26026 March 1990 Requests Interim Relief from Tech Spec 4.20, Sys Gaseous Effluent Flow Rate Devices Until Approval of Decommissioning Plan.Request Based on Defueled Condition of Plant & Util Intention Not to Resume Power Operations ML20012E2211990-03-23023 March 1990 Forwards Amend 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) ML20012E2031990-03-21021 March 1990 Responds to NRC 900205 Comments Re Tech Specs Applicable in Current Defueled Condition.Util Satisfied That Current Procedures,Equipment & Personnel Training Adequate in Event of Loss of Offsite Power to Maintain Fuel Pool Cooling ML20012D6011990-03-16016 March 1990 Forwards Suppl 1 to Proposed Amend 180 Re Removal of Fire Protection Requirements from Tech Specs,Per Generic Ltr 88-12 in Response to Telcon Request 1990-09-06
[Table view] |
Text
.
Osuun SACRAMENTO MUNICIPAL UTILITY DISTRICT C : 6201 S Street. PO. Box 15830. Sacramento CA 95852 1830.1916) 452 3211 AN ELECTHIC SYSTEM SERVING THE HEART OF CALIFORNIA RJR 85-260 l
June 12, 1985 DIRECTOR OF NUCLEAR REACTOR REGULATION ATTENTION HUGH L. THOMPSON, JR., DIRECTOR DIVISION OF LICENSING U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 DOCKET 50-313' RANCHO SECO NUCLEAR GENERATING STATION UNIT N0. 1 INITIAL DR/QR REPORT AND SUPPLEMENTARY RESPONSE TO NRC'S REQUEST FOR INFORMATION 0F TDI DIESEL GENERATORS
REFERENCE:
(a)NRCletterdatedJanuary 31, 1984, from J. F. Stolz to R. J. Rodriguez;
Subject:
Request for additional information regarding TDI diesel generators Transmitted under separate cover, please find five (5) sets of the Design Review / Quality Revalidation (DR/QR) Report for the District's TDI diesel generators. These reports are forwarded for your review and evaluation.
The DR/QR report contains technical evaluations performed by the TDI Diesel Generator Owners Group and results of Quality Revalidations conducted earlier this year by the District. The report also provides additional information related to the NRC's seventeen questions transmitted to the District in reference (a), please refer to the enclosure for details on which of the seventeen questions are addressed by the DR/QR report.
In preparing the Rancho Seco DR/QR report for transmittil to the NRC, the District has prepared separate Engineerinq Summary Reports for each component. These have been inserted immediately behind the component technical evaluations provided by the TDI Owners Group. Each sunmry indicates line item by line item how the District has addressed each of the Owners Group recommendations, f u./ . ig.f j i g., fab.+
/
n,,now,.on:.i o
nn noom nw, zoogu m con / ,,e /
- psyQl-1
l Hugh L. Thompson, Jr. June 12,1985 The District has not completed its review of Owners Group recommendations in some subject areas. Identified below is a listing of the subject areas which are still being evaluated by the District, and are to be addressed in a later supplement to the Rancho Seco DR/QR Report:
Description _ Part No.
- 1) Flywheel Bolting 03-330B
- 2) Air Intake Manifold & Piping (Large Bore)03-375
- 3) Starting Air Manifold Piping (Large Bore & Small Bore) 03-441A
- 4) Starting Air Manifold Valves Strainers, & Filters 03-441B
- 5) Starting Air Manifold Supports (Small Bore) 03-441C
- 6) Fuel Oil Piping & Tubing (Small Bore) 03-450B
- 7) Fuel Oil Piping Supports (Small Bore) 03-4500
- 8) Lubo 011 Lines External 03-465A Tubing, Fittings, couplings (LargeBore) 03-467A 9)TurbochargerLuboOilPiping(.Large Tubing & Flexible Couplings Bore & Small Bore)
- 10) Turbocharger, Lubo Oil Piping 03-467B Supports (Small Boro) 11)TurbochargerBracketAirIntako 03 475C
- 12) Turbocharger Bracket Pipo Supports (Largo Dore) 03-475E 13)OnEnginoPnumaticTubingAssembly(SmallBoro) 03 600 14)PyrometerConduitSupports 03 630 A.B.C./608A
- 15) Generator Control Panel 03 6508
- 16) Aux.SkidJacketWaterPiping(LargoDoro&SmallDore) 03 7170
- 17) Aux.SkidJacketWaterPipingSupports(LargoDoro) 03 717G L __- _ _ _ _ _ _ ___ _ __ _ _ ________ __ _ __ -_ - _____-_ _- _.
Hugh L. Thompson, Jr. June 12,1985
- 18) Aux. Skid Lube Oil Piping Supports (Small B, ore) 03-717K
- 19) Fuel Oil Filters SC-014A
- 20) Maintenance Matrix in Appendix II Part #'s as of Rancho Seco's DR/QR Report identified in App. II As a result of the reviews performed to date, the District takes exception to Owners Group recommendations pertaining to visual inspection of piston rings for wear and carbon buildup. As indicated in the Engineering Summary Report for component No. 03-3418, the District plans to perform a boroscopic inspection of the cylinder liners to examine for evidence of excessive wear after diesel generator site testing. This should give suitable indication of piston ring condition. Also, after engine start-up testing is completed, a lobe oil analysis will be performed to determine metal content. Implementing the Owners Group recommendations would require removing all cylinder heads and pulling all piston / connecting rod assemblies. This is an extreme amount of disassembly to accomplish visual inspection of all piston rings. The District considers the alternate course of action outlined above an adequate means of determining ring condition through indirect means. Please refer to the DR/QR Engineering Summary Report for component 03-341B for a detailed discussion of the District's plans.
The utstrict's plans for future related activitics are indicated below:
0 Start-up testing is scheduled for completion in fall 1985.
O Post-run inspections will be performed after start up testing.
O Results of tests and post-run inspections will be summarized and transmitted to the NRC as a revision to the existing DR/QR report. It is anticipated that the summarios will be transmitted to the NRC during the first quarter 1986.
0 Olesel generators are planned for operational tie-in to the existing plant during Rancho Soco's Cycle 8 refueling outage, scheduled for fourth quarter 1986.
Cogcerning start up testing, Long Island Lighting Company (LILCO) performed 10' cycle testing on their 101 diesel generators, at or above 3300 kw.
Occause the anticipated loads on Rancho Seco's 101 diesel generators will be significantly less than 3300 kw, tho Ofstrict plans to take credit for the testing that LILCO has performed on their "1 cad" engines and not perform any testing beyond that required for a normal preoperational test program. This approach is consistent with tho Safety Evaluation Report dated August 13, 1984, issued relativo to the Dlosol Generator Owners Group Program Plan.
Hugh L. Thompson, Jr. June 12,1985 In conclusion, those Quality Royalidation items which pertain to the Phase I sixteen major components of the diesels will all be addressed and closed out by the District prior to final plant tie-in of the diesels during the Cycle 8 refueling outage. In the event that Quality Revalidation items remain open on any Phase !! components, the District will address and close out not later than completion of the Cycle 9 refueling outage, scheduled for Spring 1988.
Shouldyouhaveanyquestions,pleasecontactRobRochlerat(916)452-3211.
extension 4905, R.J.Rodrihucz ti Assistant General i ager Nuclear
Enclosure:
(1) Supplementary response to the NRC's 17 (2) DR/QR Report for Rancho Seco - 5 sets (questions.underseparatoc l
l
- _ . _ - _ _ _ - _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ __.__s
Enclosure (1)
Supplcmentary R3sponse to the NRC's 17 Questions
Background:
Reference (a) is an NRC letter which forwarded a series of 17 questions regarding TDI diesel generators. The District responded to these questions as information became available. This resulted in four separate installments of information which were provided to the NRC in our letters dated March 15, 1984; March 23, 1984; April 20, 1984, and August 24, 1984.
Introduction:
Presented below is additional information concerning the 17 questions. The information provided is based upon Rancho Seco's TDI diesel generator inspection results as well as the TDI Diesel Generator Owners Group analysis and recommendations. In some cases, the District has indicated that an amended response is being provided to that previously provided. These amended responsos reflect the latest Owners Group recommendations identified in Rancho Seco's DR/QR Report.
Questions and Responses
- 1) QUESTION: Provide a copy of the procurement specifications to which the standby diesel generators were ordered.
RESPONSE: A copy of the procurement specification for the standby diesel generators was transmitted to the Nuclear Regulatory Commission under cover letter dated March 15, 1984.
- 2) QUESTION: Provide the performance specification and inspections performed upon receiving the DG's to snow that the procurement specificattuns were met.
RESPONSE: This item was completely answered in a District letter dated April 20, 1984, to the Nuclear Regulatory Commission.
- 3) QUESTION (1): Identify the materials used in the design of the DG's at yourplant(specificallylimitingcomponentssuchas crankstarts, camshaf ts. Jistons rocker arms, bearing materials, cylinder bloc (s, cylinder heads, pumps, turbochargers,etc.).
(2): Discuss how you assured yourself that design materials used in the manufacture of the DG's were as stated and in accordance with materials described in the TDI proposal, purchase specifications, and conformance to industry standards.
RESPONSti These items were partially answered in our District letters dated April 20. 1904, and August 24, 1984, to the Nuclear Regulatory Commission. The DR/QR Report transmitted herein as enclosure (2) provides the results of inspections performed on Rancho Sero's 701 diesel generators.
l 1
- 4) QUESTION (1): Does TDI have a program where parts / components, etc., are modified (such that design margins are reduced) in order to improve operability and DG reliability?
(2): Does this apply to any DG parts at your plant? Provide a list of product improvements made by TDI on your model DG and identify and justify which of these were not incorporated on your diesels.
l l RESPONSE: These items were completely answered in our District ,
letter dated August 24, 1984, to the Nuclear Regulatory Commission.
- 5) QUESTION: If applicable, provide responses to all NRC open items on :
standby DG's at your plant. l l RESPONSE: This item was completely answered in the District's April i j 20, 1984, letter to the Nuclear Regulatory Commission.
l 6) QUESTION: Identify each of your DG's by model number and rating (continuousdutyandshorttimeoverload)aspurchasedand .
discuss all tests including torsional and other design !
rooftests)performedontheDG'sthatwereobserved l
! p(also those not observed) by you at the manufacturer's facilities. .
I !
l RESPONSE: This item was completely answered in the District's April ;
l 20, 1984 Ietter to the Nuclear Regulatory Commission.
l 7) QUESTION: In addition to qualification tests that were performed in f
accordance with regulatory guides 1.9 and 1.108, and IEEE j Std. 387, describe all other onsite tests performed on -
your DG's.
l RESPONSE: Preoperational testing of the diesel generators has not l yet begun at Rancho Seco. Testing is expected to be completed in Fall 1985. Response to this item is deferred ,
l until results of tests are available and have been evaluated.
- 8) QUESTION: In addition to any deficiency reports already provided to i the NRC, summarize and describe problems encountered and i resolved during installation and preliminary operation of l the DG's. Dur<ng this period, were any unusual or ,
abnormal operations observed such as excessive vibration, '
noise, etc., and how were these conditions corrected. :
Provide a detailed summary of the complete operating ;
histories of your 00's. ;
h.
RESPONSE: See response to Question H. l
)
i f
l l \
- 9) QUESTION: Tabulate, compare and discuss differences in present actual DG loading to estimated loads included in the procurement specifications. Identify the magnitude of the increased load (if any) on the DG's and describe how the increased loading affects the DG capability with regard to reserve margin.
RESPONSE: This question was completely answered in the District's April 20, 1984, letter to the Nuclear Regulatory Commission.
- 10) QUESTION: If DG loading has increased from that specified in the procurement specifications, has it been necessary to upgrade the standby DG's to meet the new load requirements? If DG upgrading has been performed, provide a detailed description of the upgrading accomplished on your DG's. What is the revised manufacturer's rating for each upgraded unit for normal continuous duty and short time overload conditions? Is the DG built-in design margin (after upgrading) still within the recommendations of IEEE std. 3877 What is the reserve load carrying capability (margin) of your upgraded DG's?
RESPONSE: This question was completely answered in the District's April 20, 1984, letter to tha-Nuclear ' "
Regulatory Commission.
- 11) QUESTION: In light of the prcbisms that have been identified to date with Deleval diesels, discuss your plans to perform 'an internal visual inspection of,each standby DG with regard to potential crarikshaft and/or web cracks as identified at the Shoreham Station and provide "a detailed discussion of your plans to -
perform any non-destructive testing (NDT) such as dye per.etrant testirigy,etc., as. deemed appropriate to assure absence of cracks at' these locations or'at any other locations where cracks may have been,cbserved." Discuss schedules for such -
testing.
3" RESPONSE: The District wishes to amend'its previous response to this item. -
c; transmited in our August 20,11984 letter to the Nuclear Regulatory co7snission. Ths:Nrended portion is described below:
,- s The Owners Group recomrrendt vidathe ' District plans to perfonn, verification of attritutes is: indicated in the DR/QR Report for Crankshafts.
The scheddIE tir performiig the veri cations is ar follows:
y .. .
Visal arid Eddy current examinationi are complete.
Refer to.DR/QR Report for results.
m + .
Pr2 operation # and-tordograph test.ing is gch'eduled for fall 19f!5. N Note: no fdrther ths,'tections or tests are planned by th?
District ,3fcr the crankshaft. - ' .,
% 9h
, '-, [I [ k I g
, . - - s ,.*, ..----%.
- 12) QUESTION Justify that the standby DG's at your plant are sufficiently reliable that there will be reasonable assurance that the facility can operate without undue risk
-to the health and safety of the public. Your
-justification should include, but not be limited to the following:
(1): Quality assurance program conducted by you during procurement, manufacturing and receipt of your DG's.
(2): Your assessment of the TDI manufacturing process, inspection, and quality assurance program conducted during manufacture of your DG's.
(3): Your assessment of TDI responsiveness to problems that have occurred with your engines during installation and preliminary operation including assessment of TDI J performance.
(4): Comparison of you DG's with all other TDI emergency DG models now in use or to be used in other nuclear generating stations (and other non-nuclear facilities) to show that the conditions and/or failure modes present at Shoreham will not occur at your plant and at other nuclear plants; provide any supporting information that may be obtained from non-nuclear installation.
.(5): Independent review or verification of any TDI design calculations for critical components of your DG's, and/or other means used to assure that your DG's are designed to DEMA standards and applicable industry codes and standards, and (6): Your overall assessment of the DG's at your plant with regard to TDI system design, operating experience to date, and system dependability, availability and reliability to warrant operation of your plant.
RESPONSE: Items (1), (2), & (3) - were completely answered in the District's April 20, 1984 letter to the Nuclear Regulatory Commission.
Items (4), & (5) - These items were partially answered in our District letter dated August 24, 1984 to the Nuclear Regulatory Commission. In addition, the District can now state that the Owners Group has completed its analysis of Rancho Seco's TDI diesel generators. The results of this analysis are contain'ed or referenced in the DR/QR Report.
Also included are the Owners Group's recommendations and inspection results of Rancho Seco's diesel generators.
Item (6) - This item will be addressed after completion of preoperational testing and post run inspections.
~13) QUESTION:
Provide a tabulation of the number of times (including each date of occurrence) voltage was lost at the emergency bus (es)' requiring operation of the DG(s) including a brief description of each incident. In the above tabulation, also identify the loss of emergency bus voltage due to loss of offsite power.
RESPONSE: Item 13 was completely answered in the District's April 20, 1984 letter to the Nuclear Regulatory Commission.
- 14) QUESTION: Shoreham has identified connecting rod bearing materials are not in accordance with design specifications on their engines. This condition may also exist on all other TDI diesels. Provide assurance the correct bearing design and materials have been used in your engines. Should you find that improper bearings have been used in your diesels, state how and when you propose to correct this problem.
RESPONSE: This item was partially answered in our District letter dated August 24, 1984. The District wishes to amend its response in that letter as described below:
The District has completed all Quality Revalidations recommended by the Owners Group. The recommendations and inspection-findings are identified in the Rancho Seco DR/QR Report for connecting rods. The District does not plan any further inspections since Quality Revalidation is complete.
- 15) QUESTION (1): Most of the piston skirts in the Shoreham diesels were cracked. Because of a conenon cylinder design for.all TDI diesels, it is presumed that this condition potentially exists on all other TDI diesels. Discuss your plans, including internal inspection or other means to determine the potential or actual existence of such cracking. In your response, indicate whether the design and materials are identical to those in the Shoreham units; if not identify differences. Identify any corrective actions you have taken to date or plan to take.
(2): The staff understands that TDI has a piston design modification to correct the above problem. Are you aware of this and has TDI transmitted this service information to you?
RESPONSE: Item 1 - This item was partially answered in our District letter dated August 24, 1984 to the Nuclear Regulatory Commission. The District wishes to amend its response in that letter as described below:
The Owners Group's recommendations are contained in the Rancho Seco DR/QR Report. The results of modifications and inspections performed or to be performed are identified within the piston report. The District plans to perform only those inspections identified in the DR/QR Report.
Item 2 - This item was completely answered in the District's April 20, 1984 letter to the Nuclear Regulatory Commission.
- 16) QUESTION: What maintenance and/or operating practices have you developed to assure optimum reliability of your diesel generators at your plant?
RESPONSE: See response to item # 17, below.
- 17) QUESTION: What surveillance practices in addition to those required by piant technical specifications have you instituted to assure optimum reliability of your diesel generators at your plant?
RESPONSE: This was partially answered in our District letter dated August 24, 1984 to the Nuclear Regulatory Commission. As indicated in that letter, the District wishes to defer a complete response until preoperational tests have been completed and results evaluated.
l:
l l
l b