Forwards Mods to Plant Operator Training Program Submitted on 891228,in Response to Requesting Addl Info
ML20033G598
Person / Time
Site: Rancho Seco
Issue date: 03/30/1990
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Knighton G
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20033G599 List:
References
AGM-NUC-90-110, NUDOCS 9004100366
Download: ML20033G598 (5)


Text

t E suun l

SACRAMENTO MUNICIPAL UTILITY DISTR 6CT O 6201 S Street. P.o. Box 16830 Sacramento CA 968621830,(916) 462 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA i

AGM/NUC 90-110 March 30, 1990 i

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Hashington, DC 20555 l

Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 MODIFICATIONS TO RANCHO SECO TRAINING PROGRAMS - RESPONSE TO RAI e

Attention: George Knighton i

This is in response to your letter of March 16, 1990 requesting additional information on the District's proposed modifications to the Rancho Seco Operator Training Program submitted on December 28, 1989.

4 contains our responses to each of your questions. contains f

revisions to Attachments B and C of our December 28, 1989 submittal.

These revisions were made to fully resolve your questions.

The changes have been identified by the use of change bars in the margins.

Members of your staff with questions requiring additional information or clarification may contact Steve Crunk at (209) 333-2935, extension 4913.

l Sincerely, l

cn Dan R. Keuter Assistant General Manager Nuclear Enclosures cc w/enci:

S. Reynolds, NRC, Hashing wn DC G. Kalman, NRC, Washington DC J. B. Martin, NRC, Ha19ut Creek A. D'Angelo, NRC, Rancho Seco ggj41$$$ck V

RANCHO SECO NUCLEAR GENERATING STATloN O 14440 Twin Cities Road, Herald, CA 95638 9799;(2o9) 333 2935

o I

~

ENCLOSURE 1 Responses to NRC Requist for Additional Information Question B.1: Why is ANSI /ANS 3.1-1978 referenced, why not reference ANSI /ANS 3.1-19817

Response

The District has evaluated the applicability of ANSI /ANS 3.1-1981, which has been included as Reference 2.4 in Attachment B.

Question B.2: All references to duration of training programs should be in the format specified in 10 CFR 55(a)(1)(sic).

(4.1.2 (sic),

4.1.2, 4.2.1)

Response

Pursuant to the requirement and format in 10 CFR 55.59(a)(1),

the Defueled Requalification Training Program will be conducted for continuous periods not to exceed twenty-four months in duration.

The appropriate changes have been made in Sections 4.1.1, 4.1.2 and 4.2.1 of Attachment 8.

Question B.3: What is the maximum amount of video, films, or programmed instruction that will be used in the training program?

(4.2.2)

Response

The use of films, videotapes or programmed instructions wil'1 be limited to less than fifty percent of the total classroom training.

This information has been added to Section 4.2.2 of Attachment B.

Question B.4: What is the frequency of observation / evaluation of licens3d operators? Does this constitute the annual operating test required by 10 CFR 55.59?

Response

Licensed Operators and Licensed Senior Operators will be observed / evaluated on an annual basis.

This constitutes the i

I annual operating test required under 10 CFR 55.59 as stated in Section 4.7.6.1, and has been included as a reference in Section 4.7.2 of Attachment B.

1 i

l l

l l

' l

I

[NCLOSURE 1 (Continued) i Question B.5: Hill exams / quizzes be used following make-up training? What will h ppen if a person does not make up training within the one-cycle period?

(4.81 (sic))

Response

Any examinations missed during training require, within one requalification cycle, Otisfactory completion.

If the training is not satisfactorily completed within the established time tDidt, the individual will be removed from licensed dut %s.

The requirements established in Section 4.8.5 of Ahachneitt B will be met prior to the resumption of licensed dW.h s,.

This inform: tion has been included in Section 4.8.1.

J of 1.ttachment B.

I l

Question B.6:

What will the actions of the Operation and Training Review Board be if a person exceeds the time limit? How long will the person be able to continue in remediation? (4.8.5.4)

Response

If remedial training and re-examination is not completed within 60 days, the Board will reconvene and evaluate the circumstances. Approval by the AGM, Nuclear, is required if the Board recommends further training and re-examination.

This information has been included in Section 4.8.5.4 of 4

Attachment B.

Question C.1:

Why is ANSI /ANS 3.1-1978 referenced, why not reference ANSI /ANS 3.1-1981?

Response

ANSI /ANS 3.1-1981 has been included as Reference 2.4 in Attachment C.

Question C.2:

What are the entry requirements for the Defueled Training Program?

Response

A new Section 4.1 " Prerequisites" has been added to Attachment C as follows:

4.1 Prereauisites 4.1.1 Candidates for the NRC Licensed Defueled Operator Training Program shall have a high school diploma or equivalent and a minimum of three years of power plant experience of which one shall be nuclear power plant experience.

' i

l ENCLOSURE 1 (Continued) 4.1.2 Candidates for the NRC Licensed Defueled Senior Operator Training Program shall have a high school diploma or equivalent and a minimum of three years of power plant experience of which two shall be nuclear power plant experience.

NOTE:

Insertion of this new Section 4.1 resulted in renumbering subsequent parts of Chapter 4.0.

Question C.3:

What is the maximum amount of video, films, or programmed instruction that will be used in the training program?

(4.2.2.2)

Response

The use of films, videotapes or programmed instructions will be limited to less than fifty percent of the total classroom training.

This information has been added to Section 4.3.2.2 (formerly Section 4.2.2.2) of Attachment C.

Question C.4: Will malfunction training be addressed during defueled systems training? (A.1.9, B.1.7)

Response

Malfunction training for Operators and Senior Operators will be addressed during defueled systems training in both the classroom phase and the self-study phase.

This information has been added to Sections A.1.9, A.2.1, B.1.7 and B.2.1 of Attachment C.

6 i

t

~

l ENCLOSURE 2

[

l Attachment B:

DEFUELED REQUALIFICATION TRAINING PROGRAM FOR NRC LICENSED OPERATORS (Revision 1)

Attachment C:

DEFUELED TRAINING PROGRAMS FOR NRC LICENSE CANDIDATES (Revision 1)

P 1