Forwards Insp Repts 50-348/85-26 & 50-364/85-26 on 850618-21.No Violations Noted.Understands That Snubber Surveillance Procedures Will Be Revised to Require Tabulation of Snubbers Found to Be Inoperable
ML20132D792
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/09/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20132D797 List:
References
NUDOCS 8508010453
Download: ML20132D792 (2)


See also: IR 05000348/1985026

Text

.

.

,

.

.

,

JUU

/ Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Bcx 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-26 AND 50-364/85-26

On June 18 thru June 21, 1985, NRC inspected activities authorized by NRC

License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, intcrviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

During the inspection, the Technical Specification requirements pertaining to

visual inspection of snubbers were discussed in detail with the Farley Plant

Manager, Mr. Woodward, and his staff. As a result of these discussions,

Mr. Woodward committed to revise the snubber surveillance procedures to require

tabulation of snubbers that are found to be visually inoperable between scheduled

visual snubber inspections. After completion of a scheduled visual snubber

inspection, the interval for performance of the next visual inspection will be

based on the total number of inoperable snubbers discovered since the last

completed visual snubber inspection, plus the number of inoperable snubbers found

during the most recently completed scheduled inspection. Please inform us

if your understanding of this item is different from that stated above and

discussed in the enclosed inspection report.

Should you have any questions concerning this letter, please contact us.

Sincerely,

h ncl W. Y/fPh hr

Roger D. Walker, Director

Division of Reactor Projects

Enclosure: (See page 2)

g8010453850709

G ADGCK 05000348

PDR

IEo / 'h

.

. .

Alabama Power Company 2 N

Enclosure:

Inspection Report Nos. 50-348/85-26

and 50-364/85-26

cc w/ encl:

vif. O. Whitt, Executive Vice President

vtT. D. Woodard, Plant Manager

4 G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

T. W. McGowan, Manager-Safety Audit

and Engineering Review

d O. Thrash, Manager, Nuclear Operations

-and Administration

(Wf G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ encl:

Document Control Desk-

State of Alabama

"NRC Resident Inspector

vii. Reeves, Project Manager, NRR

i

t

RII RII RII RII

jj g .O RI

l

JJLerbian:es FJa ARHerdt AGibson

77 5 yg/85 7/ /85

7/3 /85 f

,