ML20132D792
| ML20132D792 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/09/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20132D797 | List: |
| References | |
| NUDOCS 8508010453 | |
| Download: ML20132D792 (2) | |
See also: IR 05000348/1985026
Text
.
.
,
.
.
,
JUU
/ Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Senior Vice President-Nuclear Generation
P. O. Bcx 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT: REPORT NOS. 50-348/85-26 AND 50-364/85-26
On June 18 thru June 21, 1985, NRC inspected activities authorized by NRC
License Nos. NPF-2 and NPF-8 for your Farley facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, intcrviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
During the inspection, the Technical Specification requirements pertaining to
visual inspection of snubbers were discussed in detail with the Farley Plant
Manager, Mr. Woodward, and his staff.
As a result of these discussions,
Mr. Woodward committed to revise the snubber surveillance procedures to require
tabulation of snubbers that are found to be visually inoperable between scheduled
visual snubber inspections.
After completion of a scheduled visual snubber
inspection, the interval for performance of the next visual inspection will be
based on the total number of inoperable snubbers discovered since the last
completed visual snubber inspection, plus the number of inoperable snubbers found
during the most recently completed scheduled inspection.
Please inform us
if your understanding of this item is different from that stated above and
discussed in the enclosed inspection report.
Should you have any questions concerning this letter, please contact us.
Sincerely,
h ncl W. Y/fPh hr
Roger D. Walker, Director
Division of Reactor Projects
Enclosure:
(See page 2)
g8010453850709
G
ADGCK 05000348
IEo / 'h
.
.
.
N
Alabama Power Company
2
Enclosure:
Inspection Report Nos. 50-348/85-26
and 50-364/85-26
cc w/ encl:
vif. O. Whitt, Executive Vice President
vtT. D. Woodard, Plant Manager
4 G. Hairston, III, Manager, Nuclear Engineering
and Technical Support
T. W. McGowan, Manager-Safety Audit
and Engineering Review
d O. Thrash, Manager, Nuclear Operations
-and Administration
(Wf G. Ware, Supervisor-Safety Audit
and Engineering Review
bec w/ encl:
Document Control Desk-
State of Alabama
"NRC Resident Inspector
vii. Reeves, Project Manager, NRR
i
t
RII
RII
RII
RII
.O
RI
jj
g
l
JJLerbian:es
FJa
ARHerdt
AGibson
7/3 /85
77
5
yg/85
7/ /85
f
,