Informs of Withdrawal of Relief Request 2.1.6 for IST Plan
ML20134C372
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/30/1997
From: Gaudet T
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0229, W3F1-96-229, NUDOCS 9702030040
Download: ML20134C372 (2)


Text

_.

e: - E nt:rgy gymum,ia . l Operations -u-  !

Ts 504-739+%0 l l

1 W3F1-96-0229 A4.05 I PR January 30,1997 U.S. Nuclear Regulatory Commission l Attn: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES

Docket No 50-382 License N ' IPF-38 Withdrawal of Relief Request 2.1.6 for Inservice Test Plan Gentlemen
,

Revision 7, Change 4 of the Waterford 3 Inservice Testing (IST) Plan - Pumps and Valves was submitted by Entergy Operetions via letter W3F1-91-C468, dated i j September 3,1991. This letter provided, by attachment, relief request 2.1.6. l

Waterford 3 is currently committed to conduct IST activities in accordance with l ASME Section XI, Subsection IWP,1980 Edition through Winter 1981 Addenda.

Vibration monitoring using displacement measurements is specified by that Code.

The Test Requirement IWP-3100 and Table IWP 3100-1 require that vibration I amplitude (displacement) be measured and recorded during each pump Inservice Test. Waterford requested relief to allow testing using peak vibration velocity measurements instead of vibration displacement measurements.

, While the NRC granted relief per SER dated August 19,1992, the provisions of Relief Request 2.1.6 were never implemented at Waterford 3. Waterford 3 has continued to perform vibration monitoring using displacement measurements which complies with Section XI of the ASME Code. Upon the next revision, the IST Plan will be updated to delete Relief Request 2.1.6. This letter is to inform you of that change.

ff$

\

0

~

9702030040 970130 PDR ADOCK 05000382 G PDR n

i .

i Withdrawal of Relief Request 2.16 for Inservice Test Plan i- W3F1-96-0229 l Page 2 January 30,1997 i

l Should you have any questions or comments concerning this submittal, please j contact me at (504) 739-6666 or P.M. Melancon at (504) 739-6614.

Very truly yours,

1 i m _'

i l T.J. Gaudet

. Acting Director Nuclear Safety & Regulatory Affairs i

TJG/ CWT /ssf cc: E.W. Merschoff, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee -

N.S. Reynolds NRC Resident inspectors Office l

l 1