ML20134D403

From kanterella
Revision as of 20:07, 2 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-324/85-25 & 50-325/85-25 on 850729-0802.No Violations or Deviations Identified
ML20134D403
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/12/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20134D405 List:
References
NUDOCS 8508190206
Download: ML20134D403 (2)


See also: IR 05000324/1985025

Text

PCD

  • *

SAFEGUARDS INFORMATION'

MG 121995

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC -27602

Gentlemen:

SUBJECT: REPORT N05. 50-324/85-25 AND 50-325/85-25

On July 29 - August 2,1985, NRC inspected activities authorized by NRC Operating

License Nos. OPR-71 and DPR-72 for your Brunswick facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

- Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures ara exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8500190206

PDR ADOCK

hodPDR

$24 David M. Verre111, Chief

G Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-324/85-25

and 50-325/85-25

(Safeguards Information)

cc w/ encl:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager ##C 8U

3 7E u4 CONTArms

  1. C M

bec w/ enc 1: (See page 2) p ," SEPARATION g

CONTROIJ.40'

SAFEGUARDS INFORMATION' ,

c-

- i

SAFEGUARDS INFORMATION:

Carolina Power and Light Company 2

g g

bcc w/ encl:

NRR/DL/SSPB

IE File

NMSS/SGPL

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of North Carolina

ENCLOSURE CONT

SA?ECUARDS IONINFO

PAGE IS DE .

RI II

/

R

L rihi

RII

&lD N

AT man:sa D uire rr JSno)r. PFredrickson

08/f/85 08]/85 08/9 /85 08q'F/85 08/P/85

SAFEGUARDS INFORMATION'

.