ML20138C452

From kanterella
Revision as of 13:51, 30 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-348/OL-86-01 of Exam Conducted on 860219.Table Summarizing Exam Results Withheld (Ref 10CFR2.790)
ML20138C452
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/25/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20138C456 List:
References
NUDOCS 8604020501
Download: ML20138C452 (2)


Text

Vd/nd 0'

March 25, 1986 Alabama Power Company ATTN: Mr. R. P. Mcdonald Senior Vice President P. O. Box 2641 Birmingham, AL 35291 Gentlemen:

SUBJECT:

EXAMINATION REPORT 348/0L-86-01 The NRC administered examinations on February 19, 1986, to employees of your company who had applied for licenses to operate the Farley Nuclear Plant. At the conclusion of the site visit, preliminary findings on the simulator examinations were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosure 1 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by VPanciera)

Vincent W. Panciera, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosures:

1. Examination Report 50-348/0L-86-01
2. Table of Examination Results (Office Use Only-Privacy Act Information) cc w/encls. 1 & 2:

J. D. Woodward, General Manager L. S. Williams, Training Manager bec w/encls. 1 & 2:

Senior Resident Inspector bcc w/ encl. 1:

Project Manager, NRR State of Alabama Document Control Desk

( bcc.w/encls. 1 & 2: (See Page 2) l 8604020501 860325 \\

PDR ADOCK 05000348 xE//W

1.

Alabama Power Company 2 March 25, 1986 bec w/encls. 1 & 2:

Operator Licensing Branch, DHFS, NRR RII RII RII i RI R RII

(/1f6v wWb d$/M Bhlson

( DA*6 PShew:fw WDouglas CJiilian AG son cfdtrat 34 7/86 3/i1/86 3hu/86 I 3/l /86 3/p86 3/p{/86