ML20138C462
| ML20138C462 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/20/1986 |
| From: | Douglas W, Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20138C456 | List: |
| References | |
| 50-348-OL-86-01, 50-348-OL-86-1, NUDOCS 8604020504 | |
| Download: ML20138C462 (2) | |
Text
-..
ENCLOSURE 1-EXAMINATION REPORT 348/0L-86-01 Facility Licensee:
Alabama Power Company P. O. Box 2641 Birmingham, AL 35291 Facility Name:
Farley Nuclear Plant Facility Docket No.:
50-348 Simulator examinations. were administered at Farley Nuclear Plant near Ashford, AL.
YMDr-M.h d 3/ Bl86 Chief Examiner:
William G. D uglas, ChieP Examiner Date Signed Approved by:
An a
- d. L h!T(--
BpceA. Wilson,SectionChief Date Signed Summary:
Simulator re-examinations were administered to four candidates; all of whom i
passed.
g4020504860325 ADOCK O 348 V
.,,,_.---,.,_,--,-r-,.
REPORT DETAILS 1.
Facility Employees Contacted:
- L. S. Williams, Training Supervisor
- J. D. Woodard, Plant Manager
- R. Wiggins, Sector Supervisor
- C. McClean, Instructor
- Attended Exit Meeting 2.
Examiners:
- W. G. Douglas W. M. Dean
- Chief Examiner 3.
Exit Meeting At the conclusion of the site visit the examiners met with representatives of the plant staff to discuss the results of the examination.
Those individuals who clearly passed the simulator examination were identified.
There were no generic weaknesses (greater than 75 percent of candidates giving incorrect answers to one examination topic) noted during the simulator examination.
The cooperation given to the examiners and the effort to ensure an atmosphere in the control room conducive to oral examinations was also noted and appreciated.
The licensee did not identify as proprietary any of the material provided to or reviewed by the examiners.
-