Forwards Insp Repts 50-324/88-02 & 50-325/88-02 on 880111-15,19-22 & 0131-0205.No Violations or Deviations Noted
ML20148F349
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/11/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20148F353 List:
References
NUDOCS 8803280135
Download: ML20148F349 (2)


See also: IR 05000324/1988002

Text

.- . _ - _ - _ _ _ _ _ _ _

.,.-  :

f

.

MAR 111988

.

Docket Nos. 50-325, 50-324

License Nos. DPR-71, DPR-62

Carolina Power and Light Company

lATTN: Mr. E. E. Utley

Senior Executive Vice-President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-02 AND 50-324/88-02

,

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. L. Coley on January 11-15, 19-22 and January 31 - February 5,1988. The

inspection included a review of activities authorized for your Brunswick

facility. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within i

these areas, the inspection consisted of selective examinations of procedure- i

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room, j

Should you have any questions concerning this letter, please contact us.

Sincerely, .

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ encl:

E W. Howe, Vice President

Brunswick Nuclear Project

  1. R. Dietz, Plant General Manager I

her* IRaa nwa M \

8803280135 G80311 I

PDR ADOCK 05000324

O S DCD 1G*/

'

.,

. , .

MAR 111988

.

Carolina Power and Light Company 2

bec w/ enc 1:

t)tfC Resident Inspector

DRS Technical Assistant

Document Control Desk

State of fiorth Carolina

2

a

J ey:ser lake ,fPFredrickson

03/R/88 0/<{/88 003/q/88