Forwards Corrected Const Status Rept for Period Ending 850930.Corrections for Rept Ending 850630 Also Indicated
ML20137W447
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 11/26/1985
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
SBN-902, NUDOCS 8602200153
Download: ML20137W447 (6)


Text

'

SEABROOK STATION Engineering Office 4 e " __

sW Pub 5c Service of New McTp.ts.

New Hampshire Yankee Division November 26, 1985 V.

SBN- 902 '

REF: SBN-888 T.F. B4.4.2 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. R. A. Hartfield, chief Management Information Branch Office of Management and Program Analysis

Reference:

(a) Construct 16n ~ Permits-CPPR-131_and CPPR-136, Docket Nos. 50-443 and 50-444 ~ ~ ~

Subject:

Construction Status Report: Seabrook Station, Units 1 and 2

~~"

Dear Sir:

k Enclosed is a reissue of the Construction Status Report for the period ending September 30, 1985, which was forwarded by our letter SBN-888 dated November 1,1985. In addition to correcting the previ-ously issued report for this period we have indicated by vertical bars in the margins all changes f rom the report provided for the period end-ing June 30, 1985, forwarded by SBN-835, dated July 31, 1985.

Ve tru yours,

. % =u John DeVincentis, Director Engineering and Licensing Attachment ec: Atomic Safety and Licensing Board Service List DO 86'02200153 051126 PDR ADOCM 05000443 I I \

R PDR j Seabrook Staton Construction Field Office . P.O. Box 700 Sectxook. NH 03874

William S. Jordan, III Donald E. Chick Diane Curran Town Manager Harmon, Weiss & Jordan Town of Exeter 20001 S. Street, N.W. 10 Front Street Suite 430 Exeter, NH 03833 Wast.ing ton, D.C. 20009 Brentwood Board of Selectmen Robert C. Perlis RED Dalton Road Office of the Executive Legal Director Brentwood, NH 03833 U.S. Nuclear Regulatory Commission Washington, DC 20555 Richard E. Sullivan, Mayor City Hall Robert A. Backus, Esquire Newburyport, MA 01950 116 Lowell Street P.O. Box 516 Calvin A. Canney Ma nc he s t e r, NH 03105 City Manager City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Augusta, ME 04333 Dana Bisbee, Esquire Mr. John B. Tanzer Assistant Attorney Gene ral Designated Representative of Of fice of the Attorney Cencral the Town of Hampton 206 State House Annex 5 Morningside Drive Concord, NH 03301 Hampton, NH 03842 Anne Verge, Chairperson Roberta C. Pevear Board of Selectmen Designated Representative of Town Hall the Town of Hampton Falls South Hampton, NH 03827 Drinkwater Road Hampton Falls, NH 03844 Patrick J. McKeon Selec tmen's Of fice Mrs. Sandra Cavutis 10 Central Road Designated Representative of Rye, NH 03870 the Town of Kent.ington RFD 1 Carole F. Kagan, Esquire East Kingston, NH 03827 Atomic Saf ety and Licensing Board Panel U.S. Nuclear Regulatory Commission Jo Ann Shotwell, Esquire Wa shi ng ton, DC 20555 Assistant Attorney General Es.vi ronment al Protec tion Bureau Mr. Angi Machiros Department of the Attorney General Chairman of the Board of Selectmen One Ashburton Place, 19th Floor Town of Newbury Boston, MA 02108 Newbury, MA 01950 Senator Cordon J. Humphrey Town Manager's Office U.S. Senat e Town Hall - Friend St reet Washington, DC 20510 Amesbury, MA 01913 (ATTN: Tom Burack)

Senator Cordon J. Hue'phrey Diana P. Randall 1 Pillsbury St reet

. 70 Collins Street Concord, NH 03301 Seabrook, NH 03874 (ATTN: Herb Boynton)

'+

C0NSTRUCTION STATUS REPORT PACE NO. 3-106 SEABROOK STATION 1 NUCLEAR POWER PLANTS STATUS AS OF: 09-30 e PLANT CHARACTERISTICS: KEY PERSONNEL:

QOCKET NO: 05000443 CORPORATE CONTACT: R. J. HARRISON, PRESIDENT AND CHIEF EXECUTIVE OFFICER CP NO. & DATE ISSUED: CPPR-135/ 07-07-76 CORPORATE ADDRESS: 1000 ELM STREET MANCHESTER, NEW HAMPSHIRE 03105 CP EXPIRATION DATE: 06-30-86 CORPORATE PHONE NO: (603) 669-4000 APPLICANT: PUBLIC SEVICE OF NEW HAMPSHIRE PIANT IDCATION: 10.MI S OF PORTSMOUTH, NH IE REGION: 1 AE tNITE DIG. & CONSTRUCTORS teC LPM: V. NDLSES NSSS: WESTINCNOUSE IE PROJECT INSPECTOR:

CDNSMUCTOR: UNITED DIG. & CONSMUCTORS IE RESIDDIT INSPECTOR: A. C. CERNE REACTOR TYPE: PWR DER (MWE): 1198 FUEL LOAD DATE CHANCES INSPECTION STATUSt AS REPORTED BY UTILITYa TIME PERIOD s' JULY 1985 TO SEPTEMBER 1985 REPORT BEC DATE END DATE REPORT NEW REASON FOR CHANGE NLM BER OF INSP. O F INS P. DATE SCHEULE REPORTED BY UTILITY 85-17 05-27-85 07-05-85 09-06-77 09-01-82 DELAYS DUE 70 EPA REVERSAL OF PREVIOUS 85-19 07-15-85 07-26-85 APPROVAL OF ONCE THROUGH CIRCUIATING 85-20 07-08-85 08-27-85 WATER SYSTDI & SUBSEQ. NRC WITHDRAWAL OF 85-21 07-08-85 07-12-85 CONST PERMIT, & TIME REQ TO REMOBILIZE 85-22 07-22-85 07-26-85 11-08-78 01-01-83 SCHEDULE RE-EVA!EATION 85-23 08-05-85 08-08-85 04-04-81 11-30-83 SCHEDULE RE-EVAISATION 11-30-82 09-30-84 SCHEDULE RE-EVALUATION Inspection Reports are available at local PDRa. 09-25-84 04-30-86 SCHEDULE RE-EVALUATION INCORP0kATING IMPACT OF CONSTRUCTION SUSPENSION AND CASH RESTRICTIONS IN 1984 LOCAL PUBLIC D0CUMENT ROOM EXETER PUBLIC LIBRARY FRONT STREET EXETER, NEW HAMPSHIRE 03883

3 C0NSTRUCTION STATUS REPOAT PAGE NO. 2-120 SEABROOK STATION 1 NUCLEAR POWER PLANTS STATUS AS OF 09-30-85 .

COOSTRUCTION STATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LOADIhG DATE: 06-30-86l APPLICANTS CONSTRUCTION COMPLETION ESTINATE AS DEFINED IN ,

APPLICANT'S PREVIOUS ESTIMATED FUEL IAADING DATE: 04-30-8til CP: (EARLIEST) February,1979 APPLICANT'S ESTIMATED PUEL LOADINC DATE AT CP ISSUANCE: 08-01-81 (LATEST) June, 1986 APPLICANT'S CURRENT ESTIMATED COMtERCIAL OPERATION DATE: 10-31-86 l CURRENT ESTIMAT!3 PERCENT CONSTRUCTION COMPLETE: 921 l COMtENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION 1 COMPLETE MOBILIZE AND PREPARE SITE: 7-76 8-77 100 1 PIACE STRUCTURAL CONCRETE: 9-77 4-86 99 1 l INSTALL REACTOR PRESSURE VESSEL: 5-81 $-81 100 t INSTALL LARCE BORE PROCESS PIPE: 10-M 2-86 98 %

INSTALL 1ARCE BORE PIPE MANCERS, RESTRAINTS, AND SNUBBERS: 10-79 2-86 87 1 INSTALL SMALL BORE PIPE: 9-80 2-86 97 1 INSTALL CABLE TRAT: 9-79 2 -86 99 2 INSTALL EXPOSED METAL CONDUIT: 4-79 2-86 90 I INSTALL POWER, CONTROL, INSTRUMENTATION, AND SECURITT CABLE: 5-81 2-86 91 INSTALL ELECTRICAL TERMINATIONS: 6-81 2-86 85 %

CONDUCT REACTOR COLD HTDR0 STATIC TEST: 3-85 4-85 100 2 CONDUCT HOT PUNCTIONAL TEST: 11-85 11-85 01 CONDUCT PREOF AND ACCEPTANCE TESTS NECESSART POR PUEL IDAD: 11-82 4-86 26 1 l o

It C0NSTRUCTION STATUS REPORT PACE M3. 2-122 '

SEABROOK STATION 2 NUCLEAR POWER PLANTS STATUS AS OP 09-30 a C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED PUEL LOADING DATE: APPLICANTS CONSIWUCTION COMPLETION ESTIMATE AS DEPINED IN APPLICANT'S PREVIOUS ESTIMATED PUEL IAADING DATE: 04-30-87 CP: (EARLIEST) January,1981 APPLICANT'S ESTIMATED PUEL IAADING DATE AT CP ISSUANCE: 10-01-83 (IATEST) October,1988 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:

  • CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 241 COPMEKIS RBCARDING CURRENT CONSTRUCTION STATUS: INDETERMINATE ESTIMATED
  • ACTUAL ESTIMATED
  • ACTUAL ESTIMATED START START COMPLETION COMPLETION I COMPLETE MOBILIZE AND PREPAkt SITE: 7-76 8-77 100 %

PIACE STRUCTURAL CONCRETE: 8-81 69 I INSTAIL REACTOR PRESSURE VESSEL: 10-83 12-83 100 %

INSTALL LARCE BORE PROCESS PIPE: 9-82 41 INSTALL IARGE BORE PIPE MANGERS, RESTRAINTS, AND SNUBBERS: 9-82 31 INSTALL SMALL BORE PIPE: 0%

INSTAIL CABLE TRAY: 01 INSTALL EXPOSED METAL CONDUIT 01 INSTALL POWER, CONTROL, INSTRUMENTATION, AND SECURITT CABLE: 01 INSTALL ELECTRICAL TERMINATIONS: 01 CONDUCT REACTOR COIA HYDROSTATIC TEST: 0t Q)NDUCT HOT PUNCTIONAL TEST: 02 CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY POR PUEL IAAD: 0t eIndeteralaate e

?

C0NSTRUCTION STATUS REPORT PACE NO. 2-103 SEABROOK STATION 2 NUCLEAR POWER PLANTS STATilS AS OF 09-30-85 PLANT CHARACTER 1STICS KEY PERSONNEL:

DOCKET NO: 05000444 CORPORATE CONTACT: R. J. HARRISON, PRESIDErfT AND CHIEF EXECUTIVE OUICER CP NO. & DATE ISSU D CPPR-136/ 07-07-76 CORPORATE ADDRESS: 1000 ED4 STREET MANCHESTER, NEW HAMPSHIRE 03105 CP EXPIRATION DATE: 10-31-88 CORPORATE PHONE NO: (603) 669-4000 APPLICANT: FUBLIC SERVICE OF NEW HAMPSHIRE PLANT IDCATION: 10.HI S OF PORTSMOUTH. NH IE RBCION: 1 AE: 198ITm ENC. & CONSTRUCTORS letC LPM: V. NERSES MS$$2 WESTINGHOUSE IE PROJECT INSPECTOR:

CONSTRUCTOR: UNITE DfC. & CONSTRUCTORS IE RESIDDIT INSPECTOR: A. C. CERNE REACTOR TYPE: PWR DER (NWE): 1198 FUEL L0AD DATE CHANGES INSPECTION STATUSt AS REPO17ED 5Y UTILITYa TIME PERIOD R EPORT BIG DATE END DATE REPORT NEW REASON FOR CHANCE NLM BR O F INS P. OF INS P. DATE SCHEULE REPORTED SY UTILITY 09-06-77 09-01-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS APPROVAL OF ONCE THROUCH CIRCULATINC WATER SYSTDI & SUBSEQ. NRC WITHDRAWAL OF CONST PERMIT. & TIME REQ TO REMOBILIZE 11-08-78 11-01-84 SCHEDULE RE-EVALDATION 04-04-81 02-28-86 SCHEDULE RE-EVALUATION Inspection Reporte are available at local Puus. 11-30-82 12-31-86 SCHEDULE RE-EVAIDATION 06-20-83 04-30-87 SCHEDULE RE-EVALUATION 10-31-84 N/A INDETERMINATE STATUS LOCAL PUBLIC DOCUMENT R O O M:

EXETER PUBLIC LIBRARY FRONT STREET EXET M , NEW HAMPSHIRE 03883