|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions PLA-3027, Monthly Operating Repts for Apr 19881988-04-30030 April 1988 Monthly Operating Repts for Apr 1988 PLA-2938, Monthly Operating Repts for Oct 19871987-10-31031 October 1987 Monthly Operating Repts for Oct 1987 PLA-2924, Monthly Operating Repts for Sept 19871987-09-30030 September 1987 Monthly Operating Repts for Sept 1987 PLA-2913, Monthly Operating Repts for Aug 19871987-08-31031 August 1987 Monthly Operating Repts for Aug 1987 PLA-2900, Monthly Operating Rept for Jul 19871987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 PLA-2886, Monthly Operating Repts for June 19871987-06-30030 June 1987 Monthly Operating Repts for June 1987 PLA-2866, Monthly Operating Repts for May 19871987-05-31031 May 1987 Monthly Operating Repts for May 1987 PLA-2853, Monthly Operating Repts for Apr 19871987-04-30030 April 1987 Monthly Operating Repts for Apr 1987 PLA-2832, Monthly Operating Repts for Mar 19871987-03-31031 March 1987 Monthly Operating Repts for Mar 1987 PLA-2810, Monthly Operating Repts for Feb 19871987-02-28028 February 1987 Monthly Operating Repts for Feb 1987 PLA-2798, Monthly Operating Repts for Jan 19871987-01-31031 January 1987 Monthly Operating Repts for Jan 1987 PLA-2782, Monthly Operating Repts for Dec 19861986-12-31031 December 1986 Monthly Operating Repts for Dec 1986 PLA-2765, Monthly Operating Repts for Nov 19861986-11-30030 November 1986 Monthly Operating Repts for Nov 1986 PLA-2753, Monthly Operating Repts for Oct 19861986-10-31031 October 1986 Monthly Operating Repts for Oct 1986 ML20207F9501986-09-30030 September 1986 Monthly Operating Repts for Sept 1986 PLA-2713, Monthly Operating Repts for Aug 19861986-08-31031 August 1986 Monthly Operating Repts for Aug 1986 PLA-2701, Monthly Operating Rept for Jul 19861986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 PLA-2675, Monthly Operating Repts for June 19861986-06-30030 June 1986 Monthly Operating Repts for June 1986 PLA-2660, Monthly Operating Repts for May 19861986-05-31031 May 1986 Monthly Operating Repts for May 1986 PLA-2639, Monthly Operating Repts for Apr 19861986-04-30030 April 1986 Monthly Operating Repts for Apr 1986 PLA-2624, Monthly Operating Repts for Mar 19861986-03-31031 March 1986 Monthly Operating Repts for Mar 1986 PLA-2606, Monthly Operating Repts for Feb 19861986-02-28028 February 1986 Monthly Operating Repts for Feb 1986 PLA-2595, Monthly Operating Repts for Jan 19861986-01-31031 January 1986 Monthly Operating Repts for Jan 1986 PLA-2580, Monthly Operating Repts for Dec 19851985-12-31031 December 1985 Monthly Operating Repts for Dec 1985 PLA-2567, Monthly Operating Repts for Nov 19851985-11-30030 November 1985 Monthly Operating Repts for Nov 1985 PLA-2552, Monthly Operating Repts for Oct 19851985-10-31031 October 1985 Monthly Operating Repts for Oct 1985 PLA-2543, Monthly Operating Repts for Sept 19851985-09-30030 September 1985 Monthly Operating Repts for Sept 1985 PLA-2530, Monthly Operating Repts for Aug 19851985-08-31031 August 1985 Monthly Operating Repts for Aug 1985 PLA-2516, Monthly Operating Repts for Jul 19851985-07-31031 July 1985 Monthly Operating Repts for Jul 1985 PLA-2500, Monthly Operating Repts for June 19851985-06-30030 June 1985 Monthly Operating Repts for June 1985 PLA-2487, Monthly Operating Repts for May 19851985-05-31031 May 1985 Monthly Operating Repts for May 1985 PLA-2466, Monthly Operating Repts for Apr 19851985-04-30030 April 1985 Monthly Operating Repts for Apr 1985 PLA-2442, Monthly Operating Repts for Mar 19851985-03-31031 March 1985 Monthly Operating Repts for Mar 1985 PLA-2424, Monthly Operating Repts for Feb 19851985-02-28028 February 1985 Monthly Operating Repts for Feb 1985 PLA-2409, Monthly Operating Repts for Jan 19851985-01-31031 January 1985 Monthly Operating Repts for Jan 1985 PLA-2387, Monthly Operating Repts for Dec 19841984-12-31031 December 1984 Monthly Operating Repts for Dec 1984 PLA-2371, Monthly Operating Repts for Nov 19841984-11-30030 November 1984 Monthly Operating Repts for Nov 1984 PLA-2349, Monthly Operating Repts for Oct 19841984-10-31031 October 1984 Monthly Operating Repts for Oct 1984 PLA-2330, Monthly Operating Repts for Sept 19841984-09-30030 September 1984 Monthly Operating Repts for Sept 1984 PLA-2305, Monthly Operating Repts for Aug 19841984-08-31031 August 1984 Monthly Operating Repts for Aug 1984 PLA-2273, Monthly Operating Repts for Jul 19841984-07-31031 July 1984 Monthly Operating Repts for Jul 1984 PLA-2248, Monthly Operating Repts for June 19841984-06-30030 June 1984 Monthly Operating Repts for June 1984 ML20092M9831984-05-31031 May 1984 Monthly Operating Repts for May 1984 PLA-2195, Monthly Operating Repts for Apr 19841984-04-30030 April 1984 Monthly Operating Repts for Apr 1984 1998-02-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML20097D4681991-12-31031 December 1991 Pennsylvania Power & Light Company,1991 Annual Rept ML18017A0391991-07-26026 July 1991 LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr 1999-09-30
[Table view] |
Text
_ . .
_N4 g AVERAGE DAILY UNIT POWER LEVEL g
D i v i h 50-387 DOCKET NO.
(#1 ----
f L. 9 " %;
UNIT One
%O/ IC Si COMPLETED BY DAIT TELEPHONE 09/10/84 L.A. Kuczynski (717)542-3759 MONM August, 1984 ,
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1014 1024
_ g7 2 1014 710 18 3 1015 39 971 _
4 1015 20 1034 5 850 993 21 6 1020 1033 22
~
7 1021 1030 3 _
g 1022 24 1036 9 1020 1028 25 10 1025 26 959 11 1014 1033 27 -
12 971 1026 28 13 1020 1022 29 14 1020 1021 30 15 1027 1031 3
16 1028 C l
INSTRUC110NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
l l (9/77) 8410120131 840831 DR ADOCK 05000
{}
I t
\
l . . - _ , -- - - - - - --- ---
, ANN 4 h, s*y O@
W _ ____ E L ,t 1 -~ 2"F* J OPERATING DATA REPORT C DOCKET NO. 50-387 O M DATE 09/10/84 kiC sf COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-3759 OPERATING STATUS Unit 1 Susquehanna Steam Electric Station Notes
- 1. Unit Name. Corrections to July, 1984
- 2. Reporting Period: Aug u s t , 1984 ltem 12: 561.5
- 3. Licensed Thermal Power (MWt): 3293 Item 14: 522.1
- 4. Nameplate Rating (Gross MWe): 1152 These new values are re-
- 5. Design Electrical Rating (Net MWe): 1065 flected in Y-T-D & Cumulative
- 6. Maximum Dependable Capacity (Gross MWe): 1068 columns in the August report.
- 7. Maximum Dependable Capacity (Net MWe): 1032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reawns:
None
- 9. Power Level To which Restricted,If Any (Net MWe): None
- 10. Reasons For Restrictions. lf Any: None This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 744 5,855 10,824
- 12. Number Of Hours Reactor Was Critical 744 3,893.5 7,738.8
- 13. Reactor Reserve Shutdown Hours 0 249.1 405.8
- 14. Hours Generator On.Line 744 3,768.9 7,537.2
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 2.392.310 11,467,140 22,728,801 17 Gross Electrical Energy Generated (MWH) 772,140 3,737.610 7,404,160
- 18. Net Electrical EnerEy Generated (MWH) 745.057 3,598,837 7,135,210
- 19. Unit Service Factor 100 64.4 69.6
- 20. Unit Availability Factor 100 64.4 69.6
- 21. Unit Capacity Factor (Using MDC Net) 97 59.6 63.9
- 22. Unit Capacity Factor (Using DER Net) 94 57.7 61.9
- 23. Unit Forced Outage Rate 0 17.8 15
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each1:
Refuelino Outaae: February 9, 1985: 13 weeks.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77 )
4MANN4 1J 4[~8} '
+ .
.3 e '. 1 Ej Y. -
Lh ML UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 ,
p UNIT NAME One l fp DATE 09/10/84 D ggg COMPLETED BY L.A. Kuczynsk i REPORT MONTil August, 1984 TELEPHONE (717)S42-3759
~.
r -
re 3 == = . -
S*
Licensee Cause & Corrective N,o. Date o
g
.=E e_
3g E
7sX
,, g 5 Event 5%
tt ?
c o 83 Action to NC '
$5 5 j 65 y Repori a Prevent Recurrence 5
10 840318 S 0 H 4 N/A RB CONRODS Scheduled Control Rod Sequence Ex-change to minimiz'e the control blade history effect on the fuel.
l Correct 'R 3ason ' code f ar Un t Shutdown #8 is 'G' Note:
Correct 'D arati an' for Jnit Shutdown #8 is 28.2.
I 2 3 4 F: Forced Reason: Mcthod: Exhibit G - Instructions ,
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data !
B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee l C-Refueling 3- Automatic Scram. Event Report (LER) File INUREG-D-Regularory Restriction 4-Other (Explain) 0161)
Eoperator Training & Ucense Examination F-Administrative 5 G-Operational Euro IExplain) Exhibit I - Same Source (9/77) Il-Other (Explain)
-w 3:.
i
~
SUSQUEHANNA STER.M ELECTRIC STATION Docket Number 50-387 Date 09/10/84 Completed by L.A.-Kuczynski Telephone (717)S42-3759 Challenges to Main' Steam Safety Reilef Valves None.
Changes'to the Offsite' Dose Calculation Manual None.
Major Changes to Radioactive Waste Treatment Systems None.
1
I .
AVERAGE DAILY UNIT POWER LEVEL g+
(.l-l D 7 CO . . . . . E DOCKET NO. 50-388 l L "% UNIT Two l f DATE 09/10/84 COMPLEED BY L. A. Kuczynski RIC si TELEPHONE (717)542-3759 MON August, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 g7 0 2 0 253 18 3 118 442 39 _
4 348 20 393 3 356 21 392 6 368 450 22 7 52 433 23 -
3 0 312 24 9 96 25 307 10 235 26 0 11 0 98 27 12 0 ;g 146 13 248 0 29 14 0 0 30 15 0 3g 0 16 0 INSTRUCT 10NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
,,-7.-_-,,--..,4 . . . - - - , - . . - - - - - - ,
_ _ _ _ _ _ _ _ _ . _ .-._ - -_..- _ , _ . - . - _ _ _ . ___._,.,.,,.._.__,__._,..m,
- hgANN4 %
u O", & l O) l 7 W- _ ____ _ 3 L 5- - - WJ OPERATING DATA REPORT Q N
$<p Ng O DOCKET NO. 50-388 O DATE 09/10/84 klC $Y COMPLETED BY L. A. Kuczynski TELEPHONE (717)542-3759
~
OPERATING STATUS Unit 2 Notes
- 1. Unit Name: Susquehanna Steam Electric Station
- 2. Reportin3P eriod: Au au s t . 1984
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe): _
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions. If Any: None This Month Yr.-to-Date Cumulative
- 11. Hours in Reperting Period 744 1,427 1,427
- 12. Number G Hours Reactor Was Critical 581.9 1,040.6 1,040.6
- 13. Reactor Leserve Shutdown Hours 162.1 342.4 342.4
- 14. Hours Generator On.Line 373.4 766.3 766.3
- 15. Unit Reserve Shutdown Hours 0 142.4 142.4
- 16. Gross Thermal Energy Generated (MWH) 470.952 944.986 944,986
- 17. Gross Electrical Energy Generated (MWH) 132.920 254.250 254.250
- 18. Net Electrical Energy Generated (MWH) 121,170 ,,231,451 231.451
- 19. Unit Service Factor NA NA NA
- 20. Unit Availability Factor NA NA NA
- 21. Unit Capacity Factor (Using MDC Net) NA NA NA
- 22. Unit Capacity Factor (Using DER Net) NA NA NA
- 23. Unit Forced Outage Rate NA NA NA
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
Maintenance Outage: October 20, 1984: 8 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 09/04/84
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 05/09/84 05/08/84 INITIAL ELECTRICITY 06/28/84 07/03/84 COMMERCIAL OPER ATION 12/31/84 (9/77) o
3 gANN4 aJf%:-]$+h
<- e, el lg d ~~~~ p* UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-388 UNIT NAME Two kb E 4 DATE 09/10/84 COMPLETED BY L.A. Kuczynski
- fC 5 REPORT MONTil Augu s t . 1984 TELEPHONE (717)542-3759
-, 5E 3 h Ek Licensee ,E n, h, Cause & Corrective No. Date g 3g ( jg5 Esent g7 o3' Action to H
$2 $ j6g Report # mV Prevent Recurrence 6
3 840726 S 57.2 B 3 84-013 ZZ ZZZZZZ Reactor scram for scheduled Startup Test. Due to an incorrectly completed (See attached page)
. 4 840807 5 53.1 B 3 ft/A ZZ ZZZZZZ Reactor scram as part of scheduled Startup Test.
5 840810 F 0 H N/A N/A HA XXXXXX Generator removed f rom grid for 53 9h to install missing gasket in main (See attached page) 6 840813 F 0 H N/A N/A HA XXXXXX Generator removed f rom grid for 95.7h (See attached page) 7 840826 F 28.6 A 3 84-017 HA VALVEX Reactor scram following turbine trip (See attached page) 8 840828 F 82.1 A 3 84-017 HA VALVEX Reactor scram following turbine trip (See attached page)
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 O her (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5 Goperational Error (Explain) Exhibit I - Same Source 19/77) Il-Other (Explain)
.w
~
+
s~
UNIT 2 SHUTDOWNS AND POWER REDUCTIONS (continued):
NO. 3 electrical lineup, the diesel generators were prevented f rom starting and an Unusual Event was declared. The Startup Test was re-run on August 7, 1984, and successfully completed.
NO. 5 steam line connected to upper portion of high pressure turbine.
Reactor remained critical throughout.
NO. 6 to install missing gasket in main steam line connected to upper portion of high pressure turbine. Reactor remained critical throughout.
NO. 7 on moisture separator drain tank high level . Cause for high level due to malfunctioning drain valve on piping from high pressure turbine exhaust to moisture separator.
NO. 8 on moisture separator drain tank high level . Cause for high level due to malfunctioning drain valve on piping from high pressure turbine exhaust to moisture separator.
y w -
f ;-
D.
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388 Date 09/10/84 Completed by L. A. Kuczynski Telephone (717)S42-3759 Challenges to Main Steam Safety Relief Valves
. Following the reactor scram of August 7,1984, SRV 'E' actuated automatically eight times. See table for specifics.
RX PRESSURE (psig) RX PRESSURE (psig)
OPEN CLOSED AT SRV OPEN AT SRV CLOSED 5:09:34 5: 10:05 1076 989 5: 13:56 5: 14:26 1077 989 5: 18:23 5: 18:53 1073 989 5:22:59 5:23:29 1070 989 5:27:40 5:28: 10 1068 990 5:32:30 5:33:00 1069 990 5:42:57 5:43:29 1076 987 5:49:44 6:00:06 1068 984 Changes to the Offsite Dose Calculation Manual None.
Major Changes to Radioactive Waste Treatment Systems j None.
NOTE: Add the following to Challenges to Main Steam Safety Relief Valves for July, 1984.
Following the scram of July 5,1984, SRV's ' A', 'B', and 'C' were manually actuated to depressurize the RPV. See following table for specifics. Time of scram: 0100. No SRV actuations associated with scram.
RX PRESSURE (psig) RX PRESSURE (psig)
SRV OPEN CLOSED AT SRV OPEN AT SRV CLOSED A 0254 0302 635 ~440 B 0329 0336 ~400 ~ 315 C 0413 0435 ~ 300 125 A 0516 0525 120 95 B 0518 0522 120 96 C 0520 0522 120 96 8 0602 0605 93 89
- v. -
.. PPAL Pennsylvania Power & Light Company Two North Ninth Street
- 215 / 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 SEP 121984 Director, Data Automation &
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2305 50-388/NPF-22
Dear Mr. Beebe:
The August 1984 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very trul you.s, l
$8WMW B. D. Kenyo Vice President-Nuclear Operations Attachment cc: Dr. Thomas E. Murley INP0 Records Center Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Commission 1100 circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Commission Resources Washington, D.C. 20555 Bureau of Radiation Protection Attn: Document Control Desk (12 copies) P.O. Box 2063 liarrisburg, PA 17120 Mr. R. H. Jacobs - NRC Mr. R. L. Perch - NRC q
'S' .,